[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136902":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1136902,797,2,"多选题","球形罐焊后整体热处理测温点的布置，符合要求的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","在球壳外表面均匀布置",true,{"key":16,"text":17,"correct":14},"B","相邻测温点间距小于4.5m",{"key":19,"text":20,"correct":21},"C","上、下人孔法兰各设置1个测温点",false,{"key":23,"text":24,"correct":21},"D","柱脚板各设置1个测温点",{"key":26,"text":27,"correct":14},"E","每个产品焊接试板设置1个测温点","ABE","2020版教材P115 \u002F 2019版教材P105 测温点要求。在球壳外表面均匀布置，相邻测温点间距小于4.5m。测温点总数应符合规定。在距上、下人孔与球壳板环焊缝边缘200mm范围内各设1个测温点，每个产品焊接试件应设1个测温点。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]