[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136893":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1136893,797,2,"多选题","工程交接验收前，建设单位应检查工业管道工程施工的技术资料有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工标准规范",false,{"key":16,"text":17,"correct":18},"B","技术文件",true,{"key":20,"text":21,"correct":18},"C","施工记录",{"key":23,"text":24,"correct":18},"D","试验报告",{"key":26,"text":27,"correct":14},"E","施工单位资质","BCD","2020版教材P92 \u002F 2019版教材P82 技术交接验收的技术资料包括技术文件、施工检查记录、试验报告。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]