[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136840":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1136840,797,2,"多选题","施工过程中的消防验收包括（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","消防器材验收",false,{"key":16,"text":17,"correct":14},"B","消防通道验收",{"key":19,"text":20,"correct":21},"C","隐蔽工程消防验收",true,{"key":23,"text":24,"correct":21},"D","粗装修消防验收",{"key":26,"text":27,"correct":21},"E","精装修消防验收","CDE","2020版教材P238 \u002F 2019版教材P224 三）施工过程中的消防验收1.隐蔽工程消防验收2.粗装修消防验收3.精装修消防验收。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]