[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136838":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1136838,797,2,"多选题","验收程序通常为（）和工程移交等阶段。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","验收受理",true,{"key":16,"text":17,"correct":18},"B","现场调查",false,{"key":20,"text":21,"correct":14},"C","现场检查",{"key":23,"text":24,"correct":14},"D","现场验收",{"key":26,"text":27,"correct":14},"E","结论评定","ACDE","2020版教材P237 \u002F 2019版教材P224 验收程序通常为验收受理、现场检查、现场验收、结论评定和工程移交等阶段。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]