[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136629":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1136629,797,1,"单选题","（2019年真题）.自动化仪表安装工程中，主控制室的仪表分部工程不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","取源部件安装",true,{"key":16,"text":17,"correct":18},"B","仪表线路安装",false,{"key":20,"text":21,"correct":18},"C","电源设备安装",{"key":23,"text":24,"correct":18},"D","仪表盘柜安装","主控制室的仪表分部工程可划分为盘柜安装、电源设备安装、仪表线路安装、接地、系统硬件和 软件试验等分项工程",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]