[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136516":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1136516,797,1,"单选题","（2017年真题）连续生产线上的设备安装标高测量应选用（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","简单标高",false,{"key":16,"text":17,"correct":18},"B","预埋标高",true,{"key":20,"text":21,"correct":14},"C","中心标板",{"key":23,"text":24,"correct":14},"D","木桩式标高","简单的标高准点一般作为独立设备安装的基准点；预埋标高基准点主要用于连续生产线上的设备在安装时使用。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]