[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136475":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1136475,797,1,"单选题","下列属于按达到竣工验收条件的验收方式分类的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工项目竣工验收",false,{"key":16,"text":17,"correct":14},"B","消防工程验收",{"key":19,"text":20,"correct":21},"C","项目中间验收",true,{"key":23,"text":24,"correct":14},"D","防雷工程验收","按建设项目达到竣工验收条件的验收方式分为：项目中间验收、单项工程竣工验收和全部工程竣工验收三类。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]