[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136474":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1136474,797,1,"单选题","竣工验收管理行为的依据是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量验收评定标准",true,{"key":16,"text":17,"correct":18},"B","初步设计",false,{"key":20,"text":21,"correct":18},"C","可行性研究报告",{"key":23,"text":24,"correct":18},"D","施工图纸","指导建设管理行为的依据：国家、中央各行业主管部门以及当地行业主管部门颁发的有关法律、法规、规定、施工技术验收规范、规程、质量验收评定标准及环境保护、消防、节能、抗震等有关规定。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]