[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136407":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1136407,797,1,"单选题","锅炉受热面施工时，设备及其部件清点检查的紧后工作是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","压力试验",false,{"key":16,"text":17,"correct":14},"B","泄露性试验",{"key":19,"text":20,"correct":14},"C","通球试验",{"key":22,"text":23,"correct":24},"D","光谱复查",true,"设备及其部件清点检查→合金设备（部件）光谱复查",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]