[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136378":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1136378,797,1,"单选题","有热位移的管道，吊点应设在位移的（ ）安装。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","相同方向，按位移值的1\u002F2偏位安装",false,{"key":16,"text":17,"correct":14},"B","相同方向，按位移值的1\u002F4偏位安装",{"key":19,"text":20,"correct":21},"C","相反方向，按位移值的1\u002F2偏位安装",true,{"key":23,"text":24,"correct":14},"D","相反方向，按位移值的1\u002F4偏位安装","有热位移的管道，吊点应设在位移的相反方向，按位移值的1\u002F2偏位安装。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]