[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136277":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1136277,797,1,"单选题","水准测量法的主要技术要求不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","各等级的水准点，应埋设水准标石",false,{"key":16,"text":17,"correct":18},"B","水准观测在标识埋设后立即开始",true,{"key":20,"text":21,"correct":14},"C","设备安装过程中，最好使用一个水准点最为高程起算点",{"key":23,"text":24,"correct":14},"D","水准测量所使用的仪器及水准尺应符合要求","水准观测应在标石埋设稳定后进行。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]