[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136145":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1136145,797,1,"单选题","虽然检测测定达不到设计要求，但经原设计单位核算认可能满足结构安全和使用功能的检验项目可（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","验收通过",true,{"key":16,"text":17,"correct":18},"B","采取一定措施后让步接受",false,{"key":20,"text":21,"correct":18},"C","协商通过",{"key":23,"text":24,"correct":18},"D","先试用，确认可靠后验收通过","2020版教材P476\u002F2019版教材P464 3.经有资质的检测单位检测鉴定达到设计要求，应判定为验收通过。经有资质的检测单位检测鉴定达不到设计要求、但经原设计单位核算认可能够满足结构安全和使用功能的检验项目，可判定为验收通过。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]