[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136072":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1136072,797,1,"单选题","供电企业在新装、换装及现场检验后应对用电计量装置（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","送电",false,{"key":16,"text":17,"correct":14},"B","启封",{"key":19,"text":20,"correct":14},"C","计量",{"key":22,"text":23,"correct":24},"D","加封",true,"2020版教材P452 \u002F 2019版教材P440 供电企业在新装、换装及现场校验后应对用电计量装置加封，并请用户在工作凭证上签章。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]