[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136042":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1136042,797,1,"单选题","强制检定的检定周期，由执行强制检定的（）按照计量检定规程确定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","管理机构",false,{"key":16,"text":17,"correct":14},"B","监督机构",{"key":19,"text":20,"correct":14},"C","检定机构",{"key":22,"text":23,"correct":24},"D","技术机构",true,"2020版教材P447 \u002F 2019版教材P435 3)强制检定的检定周期由执行强制检定的技术机构按照计量检定规程确定。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]