[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136014":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1136014,797,1,"单选题","下列机电安装工程夏季回访的工程是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","通风空气调制冷系统运行",true,{"key":16,"text":17,"correct":18},"B","锅炉房",false,{"key":20,"text":21,"correct":18},"C","供热系统",{"key":23,"text":24,"correct":18},"D","新技术、新工艺","2020版教材P440 \u002F 2019版教材P429 （1） 季节性回访。冬季回访：如冬季回访锅炉房及供暖系统运行情况。夏季回访：如夏季回访通风空调制冷系统运行情况。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]