[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135989":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1135989,797,1,"单选题","竣工结算实施过程中,错误的说法是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","发包人应在收到承包人提交的竣工结算文件后规定期限内核对",false,{"key":16,"text":17,"correct":14},"B","发包人可以向承包人提出核实意见,并要求提供竣工结算补充资料",{"key":19,"text":20,"correct":21},"C","合同工程竣工结算核对已完成并确认后,发包人可要求承包人与造价咨询人进行第三方核对",true,{"key":23,"text":24,"correct":14},"D","有争议的部分,按合同规定执行,无争议的部分,应按合同办理竣工结算","2020版教材P358 \u002F 2019版教材P333 发包人应在收到承包人提交的竣工结算文件后的28天内核对。发包人经核实，认为承包人还应进一步补充资料和修改结算文件的，应在上述时限内向承包人提出核实意见，承包人收到核实意见后的28天内应按照发包人提出的合理要求补充资料，修改竣工结算文件，并应洱次提交发包人复核后批准。合同工程竣工结算核对完成，发承包双方签字确认后，发包人不得要求承包人与另一个或多个工程造价咨询人重复核对竣工结算。发包人或承包人对复核结果有异议的，无异议部分按照前款规定办理不完全竣工结算，有异议部分由发承包双方协商解决，协商不成的，应按照合同约定的争议解决方式处理。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]