[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135988":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1135988,797,1,"单选题","机电工程分部分项工程量清单项目编码以五级编码设置，用12位阿拉伯数字表示。其中，第二级表示（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","附录分类顺序码",true,{"key":16,"text":17,"correct":18},"B","工程分类顺序码",false,{"key":20,"text":21,"correct":18},"C","分部工程顺序码",{"key":23,"text":24,"correct":18},"D","分项工程项目名称顺序码","2020版教材P353 \u002F 2019版教材P338 （2）第二级表示附录分类顺序码分二位。例如，机械设备安装工程为01，热力设备安装工程为02,静置设备与工艺金属结构制作安装工程为03,电气设备安装工程为04,建筑智能化工程为05。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]