[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135927":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1135927,797,1,"单选题","施工图设计阶段管理的内容不包括（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设计概算",false,{"key":16,"text":17,"correct":14},"B","主要工艺布置",{"key":19,"text":20,"correct":21},"C","环境影响评价",true,{"key":23,"text":24,"correct":14},"D","设计进度计划","2020版教材P243 \u002F 2019版教材P229 1.施工图设计阶段管理的内容包括:实施的设计计划、实施的设计方案、主要工艺布置、房屋结构布置;还有设计质量、设计进度、设计概算。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]