[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135885":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1135885,797,1,"单选题","常用的绝热结构层施工方法中，（）较适合异形管件的绝热以及室外地面或地下管道绝热。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","喷涂法",false,{"key":16,"text":17,"correct":18},"B","浇注法",true,{"key":20,"text":21,"correct":14},"C","捆扎法",{"key":23,"text":24,"correct":14},"D","充填法","2020版教材P154 \u002F 2019版教材P143 1.浇注法。浇注法是将配制好的液态原料或湿料倒人设备及管道外壁设置的模具内，使其发泡定型或养护成型的一种绝热施工方法。液态原料目前多采用聚氨酯溶剂，湿料是轻质粒料与胶结料和水的拌和物。该法较适合异形管件的绝热以及室外地面或地下管道绝热。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]