[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135776":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1135776,797,1,"单选题","吊车梁和吊车桁架安装就位后不应有（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","下挠",true,{"key":16,"text":17,"correct":18},"B","上挠",false,{"key":20,"text":21,"correct":18},"C","侧弯",{"key":23,"text":24,"correct":18},"D","扭曲","2020版教材P119 \u002F 2019版教材P109 2.其他检验 （2）吊车梁和吊车桁架组装、焊接完成后不允许下挠。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]