[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135746":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1135746,797,1,"单选题","管道膨胀节在试压前（），管道已按试验要求进行了加固。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","已设置临时约束装置",true,{"key":16,"text":17,"correct":18},"B","已处于自然状态",false,{"key":20,"text":21,"correct":18},"C","已隔离",{"key":23,"text":24,"correct":18},"D","已拆除","2020版教材P100 \u002F 2019版教材P89 管道上的膨胀节的处理。管道上的膨胀节已设置了临时约束装置。",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]