[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135451":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1135451,797,1,"单选题","下列选项中，不属于吊装方案中工艺设计内容的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","吊装工艺方法概述",false,{"key":16,"text":17,"correct":14},"B","吊装进度计划",{"key":19,"text":20,"correct":21},"C","吊装应急预案",true,{"key":23,"text":24,"correct":14},"D","吊装参数表","2020版教材P50 吊装工艺设计：主要包括 1）施工工艺：设备吊装工艺方案概述与吊装工艺要求； 2）吊装参数表； 3）机具：起重机具选用、机具安装拆除工艺要求；吊装机具、材料汇总表； 4）吊点及加固：设备支、吊位置及结构设计图，设备局部或整体加固图； 5）工艺图：吊装平、立面布置图；地锚施工图；吊装作业区域地基处理措施；地下工程和架空电缆施工规定； 6）吊装进度计划； ABD属于吊装方案吊装工艺设计的内容",{"id":6,"name":27,"category":28,"favorite":29},"一建机电工程实务","建筑工程",0]