[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,9,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,234,246,258,269,281,293,305,317,329,341,353,365,377,389,401,413,424,436,448,457,469,481,489,501,513,525,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1133691,1,"单选题","根据《公路工程施工安全技术规范》（2015年版）6.3.3条规定,地面横向坡度陡于1∶10的区域,取土坑应设在路堤（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","左侧",false,{"key":24,"text":25,"correct":22},"B","右侧",{"key":27,"text":28,"correct":29},"C","上侧",true,{"key":31,"text":32,"correct":22},"D","下侧","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1133693,"关于路基工程土方施工安全要点的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"取土场（坑）底部应平顺并设有排水设施",{"key":24,"text":41,"correct":22},"地面横向坡度陡于1：10的区域，取土坑应设在路堤上侧",{"key":27,"text":43,"correct":22},"取土场（坑）边周围应设置警示标志和安全防护设施",{"key":31,"text":45,"correct":29},"取土坑与路基间的距离应满足路基边坡稳定的要求，取土坑与路基坡脚间的护坡道应平整密实，表面应设2%～3%向外倾斜的横坡",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1133695,"在生产事故应急救援预案中，应急响应分级的依据不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"事故危害程度",{"key":24,"text":53,"correct":29},"事故发生所在地行政区域",{"key":27,"text":55,"correct":22},"事故影响范围",{"key":31,"text":57,"correct":22},"单位控制事态的能力",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1133697,"不是专项施工方案主要内容的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"劳动力计划",{"key":24,"text":65,"correct":22},"保证措施",{"key":27,"text":67,"correct":22},"计算书",{"key":31,"text":69,"correct":29},"施工报告",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1133699,"开挖深度超过（ ）m的基坑土方开挖、支护、降水工程或开挖深度虽未超过该深度但地质条件下、周围环境复杂的基坑土方开挖、支护、降水工程专项施工方案，应组织专家进行论证。",[74,76,78,80],{"key":20,"text":75,"correct":22},"2",{"key":24,"text":77,"correct":22},"3",{"key":27,"text":79,"correct":22},"4",{"key":31,"text":81,"correct":29},"5",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1133701,"安全管理必须坚持“五同时”的原则包括计划、布置、检查、总结和（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"改进",{"key":24,"text":89,"correct":29},"评比",{"key":27,"text":91,"correct":22},"落实",{"key":31,"text":93,"correct":22},"处理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1133703,"公路施工企业必须坚持的基本原则是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"管生产必须管安全",{"key":24,"text":101,"correct":22},"谁主管谁负责",{"key":27,"text":103,"correct":22},"预防为主",{"key":31,"text":105,"correct":22},"四不放过",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1133705,"施工合同索赔是指在施工合同履行过程中，合同一方因对方不履行或不适当履行合同义务而遭受损失时向对方提出的价款补偿与（或）（ ）补偿的要求。",[110,112,114,116],{"key":20,"text":111,"correct":29},"工期",{"key":24,"text":113,"correct":22},"计日工",{"key":27,"text":115,"correct":22},"人员工资",{"key":31,"text":117,"correct":22},"机械台班",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1133707,"按照（ ）划分，工期延误分为单一性延误和共同延误。",[122,124,126,128],{"key":20,"text":123,"correct":22},"延误索赔结果",{"key":24,"text":125,"correct":22},"延误的原因",{"key":27,"text":127,"correct":22},"延误是否处于关键路线上",{"key":31,"text":129,"correct":29},"延误发生的时间",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1133709,"变更工程的单价原则，其一是（ ），其二是公平合理原则。",[134,136,138,140],{"key":20,"text":135,"correct":22},"发包人最终确定原则",{"key":24,"text":137,"correct":29},"约定优先原则",{"key":27,"text":139,"correct":22},"监理工程师审批原则",{"key":31,"text":141,"correct":22},"协商一致原则",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1133711,"施工中，监理工程师在收到承包人书面建议后，应与发包人共同研究，确认存在变更的，应在收到承包人书面建议后的（ ）d内作出变更指示。",[146,148,150,152],{"key":20,"text":147,"correct":22},"10",{"key":24,"text":149,"correct":29},"14",{"key":27,"text":151,"correct":22},"16",{"key":31,"text":153,"correct":22},"20",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1133713,"在合同履行过程中，经发包人同意，监理人可按合同条款约定的变更程序向承包人作出变更指示，承包人的做法错误的是（ ）",[158,160,162,164],{"key":20,"text":159,"correct":22},"经检查认为其中存在合同约定变更情形的，可向监理工程师提出书面变更协议",{"key":24,"text":161,"correct":22},"认为难以实施此项变更，应立即通知监理工程师，对其说明原因并附详细依据",{"key":27,"text":163,"correct":22},"认为可以实施的，立即着手实施",{"key":31,"text":165,"correct":29},"认为难以实施此项变更的，应立即无理由拒绝",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1133715,"有关专业分包的规定中错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"所有专业分包计划和专业分包合同须报监理人审批，并报发包人核备",{"key":24,"text":173,"correct":22},"专业分包工程不得再次分包",{"key":27,"text":175,"correct":22},"专业分包人应具备相应的专业承包资质",{"key":31,"text":177,"correct":29},"专业分包人应将其专业分包工程的施工组织设计和施工安全方案报承包人批准",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1133717,"关于分包工程管理的说法中，错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":29},"分包工程在开工前发包人必须填报开工报审表",{"key":24,"text":185,"correct":22},"由监理人审查承包人是否具备开工条件，确定是否批复其开工申请",{"key":27,"text":187,"correct":22},"在分包工程实施中，监理人应检查核实分包人实施分包工程的主要技术、管理人员及主要施工设备是否与资格审查时所报的情况相符",{"key":31,"text":189,"correct":22},"监理人应对分包工程实施现场监管",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1133719,"承包商履行合同的基础是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"与供货商签订合同",{"key":24,"text":197,"correct":29},"业主履行合同",{"key":27,"text":199,"correct":22},"协调现场周边环境",{"key":31,"text":201,"correct":22},"如期进入现场",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1133721,"公路工程合同体系中的核心合同是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"勘察合同",{"key":24,"text":209,"correct":22},"设计合同",{"key":27,"text":211,"correct":29},"施工合同",{"key":31,"text":213,"correct":22},"供货合同",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1133723,"公路工程合同体系中处于的核心位置的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":29},"业主",{"key":24,"text":221,"correct":22},"承包人",{"key":27,"text":223,"correct":22},"监理人",{"key":31,"text":225,"correct":22},"政府",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},1133725,"在整个公路工程合同体系中，核心合同是（ ）。",[230,231,232,233],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":211,"correct":29},{"key":31,"text":213,"correct":22},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1133727,"根据《公路工程标准施工招标文件》（2018年版）的规定，组成合同的各项文件应互相解释，互为说明。除项目专用合同条款另有约定外，最具优先解释的合同文件是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"通用合同条款",{"key":24,"text":241,"correct":29},"中标通知书",{"key":27,"text":243,"correct":22},"已标价工程量清单",{"key":31,"text":245,"correct":22},"技术规范",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},1133728,"某项目合同文件有：（1）技术规范；（2）中标通知书；（3）图纸；（4）公路工程专用合同条款；（5）项目专用合同条款；（6）已标价工程量清单。在无特殊说明的情况下，这堂文件的优先级顺序正确的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"（1）（3）（2）（5）（6）（4）",{"key":24,"text":253,"correct":29},"（2）（5）（4）（1）（3）（6）",{"key":27,"text":255,"correct":22},"（2）（3）（1）（4）（5）（6）",{"key":31,"text":257,"correct":22},"（2）（1）（3）（6）（4）（5）",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1133730,"公路施工合同条款中规定,下列文件中优先级最高的是（ ）。",[262,264,265,267],{"key":20,"text":263,"correct":22},"项目专用条款",{"key":24,"text":241,"correct":29},{"key":27,"text":266,"correct":22},"工程量清单",{"key":31,"text":268,"correct":22},"公路专用条款",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},1133732,"根据《公路工程标准施工招标文件》，组成合同的各项文件包括：①中标通知书；②合同协议书及各种合同附件；③项目专用合同条款；④已标价工程量清单等。除项目合同条款约定外，合同文件的优先解释顺序是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"①→②→③→④",{"key":24,"text":276,"correct":22},"③→①→②→④",{"key":27,"text":278,"correct":22},"②→③→④→①",{"key":31,"text":280,"correct":29},"②→①→③→④",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1133734,"不属于直接工程费的人工费内容的是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"基本工资+工资性津贴",{"key":24,"text":288,"correct":22},"生产工人辅助工资",{"key":27,"text":290,"correct":22},"职工福利费",{"key":31,"text":292,"correct":29},"夜间施工增加费",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},1133736,"降低公路工程项目施工成本的方法和途径的说法中错误的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"进行合同交底可以降低成本的关键之一",{"key":24,"text":300,"correct":22},"制定先进的、经济合理的施工方案是降低成本的关键之一",{"key":27,"text":302,"correct":22},"提高机械利用率是降低成本的关键之一",{"key":31,"text":304,"correct":29},"组织顺序施工以便减少资源投入以及放慢施工进度是降低成本的关键之一",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1133738,"进行工期和成本的同步控制的方法是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"偏差分析法",{"key":24,"text":312,"correct":29},"净值法",{"key":27,"text":314,"correct":22},"控制消耗法",{"key":31,"text":316,"correct":22},"限额领料法",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},1133740,"对材料进行数量控制的主要方法是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"减少材料购买量",{"key":24,"text":324,"correct":22},"控制场外运输损耗",{"key":27,"text":326,"correct":22},"控制保管损耗",{"key":31,"text":328,"correct":29},"实行“限额领料”",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},1133742,"下列属于施工中材料费的控制措施的是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"控制购买价",{"key":24,"text":336,"correct":22},"节省运费",{"key":27,"text":338,"correct":29},"限额领料",{"key":31,"text":340,"correct":22},"减少包装",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1133744,"下列有关工程成本控制的说法中错误的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"应以施工预算控制成本支出",{"key":24,"text":348,"correct":29},"应在项目成本计划的基础上编制成本预测",{"key":27,"text":350,"correct":22},"应建立资源消耗台账实行资源消耗的中间控制",{"key":31,"text":352,"correct":22},"应加强质量管理控制质量成本",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1133745,"施工计划成本偏差正值是表示（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"进度超前",{"key":24,"text":360,"correct":29},"计划预控不到位",{"key":27,"text":362,"correct":22},"进度拖延",{"key":31,"text":364,"correct":22},"计划预控到位",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},1133747,"工程项目成本计划应在（ ）的组织和主持下。",[369,371,373,375],{"key":20,"text":370,"correct":22},"公司总经济师",{"key":24,"text":372,"correct":22},"公司造价师",{"key":27,"text":374,"correct":29},"项目经理",{"key":31,"text":376,"correct":22},"项目造价师",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1133749,"（ ）作为现场施工成本控制的目标。",[381,383,385,387],{"key":20,"text":382,"correct":22},"现场施工成本偏差",{"key":24,"text":384,"correct":22},"现场施工成本降低额",{"key":27,"text":386,"correct":29},"现场施工计划成本",{"key":31,"text":388,"correct":22},"现场施工成本降低率",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1133751,"成本计划的核心是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"全面成本管理",{"key":24,"text":396,"correct":29},"确定责任目标成本",{"key":27,"text":398,"correct":22},"科学管理成本",{"key":31,"text":400,"correct":22},"有效管理成本",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1133753,"引起承包人索赔的因素众多,不是承包人索赔的因素是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"赶工",{"key":24,"text":408,"correct":22},"开工受阻",{"key":27,"text":410,"correct":22},"气候影响",{"key":31,"text":412,"correct":29},"施工机械故障的停工",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1133755,"发包人应在监理人出具交工付款证书的（ ）d内，将应支付款支付给承包人。发包人不按期支付的，按合同条款的约定，将逾期付款违约金支付给承包人。",[417,419,420,422],{"key":20,"text":418,"correct":22},"7",{"key":24,"text":149,"correct":22},{"key":27,"text":421,"correct":22},"21",{"key":31,"text":423,"correct":29},"28",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},1133757,"一切工程的计量工作都应在监理工程师在场情况下，由承包人测量，记录，有承包签名的计量记录原本，应提交给（ ）审查和保存",[428,430,432,434],{"key":20,"text":429,"correct":22},"发包人",{"key":24,"text":431,"correct":22},"设计单位负责人",{"key":27,"text":433,"correct":29},"监理工程师",{"key":31,"text":435,"correct":22},"项目负责人",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1133759,"发包人应在监理人收到进度付款申请单后的28d内，将进度应付款支付给承包人；否则（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"承包人可以立即停工",{"key":24,"text":443,"correct":22},"承包人可解除合同",{"key":27,"text":445,"correct":22},"支付逾期付款复利利息",{"key":31,"text":447,"correct":29},"支付逾期付款违约金",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},1133761,"当材料、设备已用于或安装在永久工程之中时，材料、设备预付款应从进度付款证书中扣回，扣回期不超过（ ）个月。",[452,454,455,456],{"key":20,"text":453,"correct":22},"1",{"key":24,"text":75,"correct":22},{"key":27,"text":77,"correct":29},{"key":31,"text":79,"correct":22},{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},1133763,"开工预付款支付的条件有：一是承包人和发包人已签订了施工合同，二是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":29},"承包人已提交了开工预付款保函",{"key":24,"text":464,"correct":22},"材料、设备符合规范要求并经监理工程师认可",{"key":27,"text":466,"correct":22},"承包人已出具材料、设备费用凭证或支付单据",{"key":31,"text":468,"correct":22},"承包人的施工队伍已进场",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},1133765,"竣工后一次结算的方法适用的建筑安装工程是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":29},"工期小于1年或合同价值小于100万元",{"key":24,"text":476,"correct":22},"工期小于1年或合同价格大于100万元",{"key":27,"text":478,"correct":22},"工期大于1年或合同价格小于100万元",{"key":31,"text":480,"correct":22},"工期大于1年或合同价格大于100万元",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1133767,"监理人在收到承包人进度付款申请单以及相应的支持性证明文件后的（ ）d内完成核查。",[485,486,487,488],{"key":20,"text":418,"correct":22},{"key":24,"text":149,"correct":29},{"key":27,"text":421,"correct":22},{"key":31,"text":423,"correct":22},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},1133769,"工程进度款支付一般按月进行结算，但规定了每月工程量最低支付限额的百分数；竣工时进行竣工结算。这种结算方式是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"按月结算",{"key":24,"text":496,"correct":22},"按工程量结算",{"key":27,"text":498,"correct":22},"竣工后一次结算",{"key":31,"text":500,"correct":29},"双方约定的其他结算方式",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1133771,"公路工程工程量清单编写的工程细目，根据工程的不同部位分为总则、路基、路面、桥梁涵洞、隧道、预埋管线、绿化、环境保护和（ ）部分。",[505,507,509,511],{"key":20,"text":506,"correct":22},"机械设备",{"key":24,"text":508,"correct":22},"租赁设备",{"key":27,"text":510,"correct":29},"安全设施",{"key":31,"text":512,"correct":22},"暂定金额",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},1133773,"下列不属于工程量清单汇总表的内容的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"暂列金额",{"key":24,"text":520,"correct":22},"计日工合计",{"key":27,"text":522,"correct":22},"投标报价",{"key":31,"text":524,"correct":29},"单价和单价分析",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1133774,"下列关于工程量清单的说法错误的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"工程量清单应和技术规范结合起来理解",{"key":24,"text":532,"correct":29},"清单的工程细目与预算定额的规定完全相同",{"key":27,"text":534,"correct":22},"工程量清单中所列的工程数量是估算的或设计的预计数量",{"key":31,"text":536,"correct":22},"清单中的单价包括合同中明示或暗示的所有责任、义务和一般风险",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1133776,"公路工程工程量清单的数量是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"实际数量",{"key":24,"text":544,"correct":22},"支付数量",{"key":27,"text":546,"correct":22},"计量数量",{"key":31,"text":548,"correct":29},"估计数量",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},1133778,"招标的工程量清单是一份以一定计量单位说明工程实物（ ）的文件。",[553,555,557,559],{"key":20,"text":554,"correct":29},"数量",{"key":24,"text":556,"correct":22},"质量",{"key":27,"text":558,"correct":22},"总量",{"key":31,"text":560,"correct":22},"价格",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1133780,"不属于框架式临时码头特点的是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":29},"结构刚度小",{"key":24,"text":568,"correct":22},"承受水平力强",{"key":27,"text":570,"correct":22},"适用于水位差较大的河段",{"key":31,"text":572,"correct":22},"便于设置多层系船平台",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":27,"analysis":33},1133782,"以下关于便桥建设要求错误的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"便桥结构按照实际情况专门设计，同时应满足排洪要求",{"key":24,"text":580,"correct":22},"便桥高度不低于上年最高洪水位",{"key":27,"text":582,"correct":29},"当河窄、水浅时可选用易于拆散、组建的浮桥",{"key":31,"text":584,"correct":22},"墩架式梁桥基础常采用混凝土基础和钢桩基础",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},1133784,"单车道施工便道应每间隔一定距离设置一处（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"超车道",{"key":24,"text":592,"correct":29},"错车道",{"key":27,"text":594,"correct":22},"应急避险车道",{"key":31,"text":596,"correct":22},"变速车道",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},1133786,"关于施工便道设置的说法，错误的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":29},"便道不宜利用永久性道路和桥梁",{"key":24,"text":604,"correct":22},"施工主干线尽可能地靠近标段各主要工点，引入线以直达用料地点为原则",{"key":27,"text":606,"correct":22},"应尽量避免与既有铁路线、公路平面交叉",{"key":31,"text":608,"correct":22},"若只要求晴天通、雨天不通或一次性使用的便道，可不设路面",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]