[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,8,50,1523,[13,34,45,53,65,77,89,97,109,121,131,143,155,165,174,186,198,210,222,234,246,258,268,280,292,304,316,328,340,352,364,376,388,400,412,424,435,447,458,470,482,492,504,515,527,538,550,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1133592,1,"单选题","下面哪项内容是路基工程施工组织设计要充分考虑的（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工方法和土石方调配方案",true,{"key":24,"text":25,"correct":26},"B","按均衡流水法组织施工",false,{"key":28,"text":29,"correct":26},"C","各分部（项）工程的施工方案和方法",{"key":31,"text":32,"correct":26},"D","确定开工前必须完成的准备工作","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1133594,"路基工程施工组织设计重点考虑的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"土方调配",{"key":24,"text":41,"correct":26},"路上与基地统筹兼顾",{"key":28,"text":43,"correct":26},"布置好运料线",{"key":31,"text":25,"correct":26},{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":20,"analysis":33},1133596,"路基工程施工组织设计的编制特点是（ ）。",[49,50,51,52],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":25,"correct":26},{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":20,"analysis":33},1133598,"如图中挖3工序的最早开始时间和最早完成时间论述正确是（ ）。",[57,59,61,63],{"key":20,"text":58,"correct":22},"挖3工序最早在第5d后开始并且最早在第6d晚上结束",{"key":24,"text":60,"correct":26},"挖3工序最早在第5d早晨开始并且最早在第6d晚上结束",{"key":28,"text":62,"correct":26},"挖3工序最早在第5d后开始并且最早在第8d晚上结束",{"key":31,"text":64,"correct":26},"挖3工序最早在第5d早晨开始并且最早在第9d晚上结束",{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":28,"analysis":33},1133600,"在对进度计划进行计划目标与施工能力的适应性审查时，应重点审查（ ）。",[69,71,73,75],{"key":20,"text":70,"correct":26},"施工总工期的安排应符合合同工期",{"key":24,"text":72,"correct":26},"主要骨干人员及施工队伍的进场日期已经落实",{"key":28,"text":74,"correct":22},"各项施工方案和施工方法应与施工经验和技术水平相适应",{"key":31,"text":76,"correct":26},"所需主要材料和设备的运送日期已有保证",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":20,"analysis":33},1133602,"在中标通知书发出后合同规定的时间内，承包人应向（ ）书面提交一份详细和格式符合要求的工程总体进度计划。",[81,83,85,87],{"key":20,"text":82,"correct":22},"监理工程师",{"key":24,"text":84,"correct":26},"业主",{"key":28,"text":86,"correct":26},"质量监督站",{"key":31,"text":88,"correct":26},"上级公司",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":20,"analysis":33},1133604,"在对进度计划进行工期和时间安排的合理性审查时，应重点审查（ ）。",[93,94,95,96],{"key":20,"text":70,"correct":22},{"key":24,"text":72,"correct":26},{"key":28,"text":74,"correct":26},{"key":31,"text":76,"correct":26},{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":31,"analysis":33},1133606,"考虑沥青路面结构层持续时间时，不属于影响因素的是（ ）。",[101,103,105,107],{"key":20,"text":102,"correct":26},"沥青拌合机的能力",{"key":24,"text":104,"correct":26},"摊铺速度",{"key":28,"text":106,"correct":26},"混合料的出厂温度",{"key":31,"text":108,"correct":22},"开放交通的温度",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":28,"analysis":33},1133608,"属于公路工程常用的流水时间参数是（ ）。",[113,115,117,119],{"key":20,"text":114,"correct":26},"施工过程数",{"key":24,"text":116,"correct":26},"工作面",{"key":28,"text":118,"correct":22},"流水节拍",{"key":31,"text":120,"correct":26},"流水强度",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":24,"analysis":33},1133610,"公路工程常用的流水参数中，属于工艺参数的是（ ）。",[125,127,128,129],{"key":20,"text":126,"correct":26},"施工段",{"key":24,"text":114,"correct":22},{"key":28,"text":118,"correct":26},{"key":31,"text":130,"correct":26},"组织间歇",{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":24,"analysis":33},1133612,"公路施工过程组织方法中，顺序作业法的主要特点不包括（ ）。",[135,137,139,141],{"key":20,"text":136,"correct":26},"施工现场的组织、管理比较简单",{"key":24,"text":138,"correct":22},"充分利用了工作面进行施工，（总）工期较短",{"key":28,"text":140,"correct":26},"不强调分工协作",{"key":31,"text":142,"correct":26},"每天投入施工的劳动力、材料和机具的种类比较少，有利于资源供应的组织工作",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":28,"analysis":33},1133614,"下列公路工程进度计划的主要形式中，以累计完成的工程量的百分数为纵轴的是（ ）。",[147,149,151,153],{"key":20,"text":148,"correct":26},"网络图",{"key":24,"text":150,"correct":26},"垂直图",{"key":28,"text":152,"correct":22},"斜率图",{"key":31,"text":154,"correct":26},"“S”曲线",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":28,"analysis":33},1133615,"下列公路工程进度计划的主要形式中，时间为纵轴的是（ ）。",[159,161,163,164],{"key":20,"text":160,"correct":26},"横道图",{"key":24,"text":162,"correct":26},"S曲线",{"key":28,"text":150,"correct":22},{"key":31,"text":152,"correct":26},{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1133617,"以时间为纵轴的公路工程进度计划的形式是（ ）。",[169,170,171,172],{"key":20,"text":160,"correct":26},{"key":24,"text":154,"correct":26},{"key":28,"text":152,"correct":26},{"key":31,"text":173,"correct":22},"斜条图",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1133619,"仪器设备使用状态标识为“准用”的用()标签进行标识。",[178,180,182,184],{"key":20,"text":179,"correct":26},"绿色",{"key":24,"text":181,"correct":22},"黄色",{"key":28,"text":183,"correct":26},"蓝色",{"key":31,"text":185,"correct":26},"红色",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1133621,"关于测量仪器使用和保管的说法，错误的是()。",[190,192,194,196],{"key":20,"text":191,"correct":26},"仪器的配置与使用范围应经项目总工签认确定",{"key":24,"text":193,"correct":22},"仪器档案的原件必须随仪器装箱",{"key":28,"text":195,"correct":26},"超过了规定的周检时间确认间隔的仪器必须停止使用",{"key":31,"text":197,"correct":26},"仪器转站时严禁将带支架的仪器横扛在肩上",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1133623,"对于超过一定规模的危险性较大的分部分项工程，()应当组织专家对专项方案进行论证。",[202,204,206,208],{"key":20,"text":203,"correct":26},"建设单位",{"key":24,"text":205,"correct":26},"监理单位",{"key":28,"text":207,"correct":26},"设计单位",{"key":31,"text":209,"correct":22},"施工单位",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},1133625,"关于技术档案制度的叙述错误的是()。",[214,216,218,220],{"key":20,"text":215,"correct":26},"基本建设档案资料是指在整个建设过程中形成的应当归档的文件",{"key":24,"text":217,"correct":26},"基本建设档案资料包括计算材料、声像材料等",{"key":28,"text":219,"correct":26},"项目竣工时应按有关办法将档案资料组卷归档装订",{"key":31,"text":221,"correct":22},"装订好的档案资料应在六个月内向建设单位办理移交手续",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1133627,"（ ）是指在合同段中，具有独立施工条件和结构功能的工程",[226,228,230,232],{"key":20,"text":227,"correct":22},"单位工程",{"key":24,"text":229,"correct":26},"分部工程",{"key":28,"text":231,"correct":26},"分项工程",{"key":31,"text":233,"correct":26},"工序",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},1133629,"可用于测定路基土方最佳含水量的试验方法是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":26},"灌砂法",{"key":24,"text":241,"correct":26},"环刀法",{"key":28,"text":243,"correct":22},"重型击实试验法",{"key":31,"text":245,"correct":26},"核子密度湿度仪法",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1133631,"土基达到最大干密度所对应的含水量是（ ）含水量。",[250,252,254,256],{"key":20,"text":251,"correct":26},"最大",{"key":24,"text":253,"correct":26},"最小",{"key":28,"text":255,"correct":22},"最佳",{"key":31,"text":257,"correct":26},"最差",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},1133633,"土的最佳含水量通过（ ）来测定。",[262,264,265,267],{"key":20,"text":263,"correct":26},"灌沙法",{"key":24,"text":241,"correct":26},{"key":28,"text":266,"correct":22},"轻型、重型击实试验",{"key":31,"text":245,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1133635,"土方路基工程施工中所用的材料，必须采用设计和规范规定的适用材料，保证原材料合格，正确确定土的（ ）和最佳含水量。",[272,274,276,278],{"key":20,"text":273,"correct":26},"天然密度",{"key":24,"text":275,"correct":26},"平均密度",{"key":28,"text":277,"correct":26},"毛体积密度",{"key":31,"text":279,"correct":22},"最大干密度",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1133637,"不属于路面基层（底基层）施工中常见的质量控制关键点的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":26},"基层施工所采用设备组合",{"key":24,"text":287,"correct":22},"切缝时间和养生技术的采用",{"key":28,"text":289,"correct":26},"拌合设备计量装置校验",{"key":31,"text":291,"correct":26},"配合比的设计",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1133639,"沥青贯入式碎石基层施工时，配合比实际应采用（ ）设计方法。",[296,298,300,302],{"key":20,"text":297,"correct":26},"拉伸试验",{"key":24,"text":299,"correct":26},"针入度试验",{"key":28,"text":301,"correct":22},"马歇尔试验",{"key":31,"text":303,"correct":26},"软化点试验",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1133641,"用于沥青混合料的配比设计及沥青路面施工质量检验的试验是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":26},"密度试验",{"key":24,"text":311,"correct":22},"马歇尔稳定度试验",{"key":28,"text":313,"correct":26},"强度试验",{"key":31,"text":315,"correct":26},"铺砂法试验",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1133643,"下列选项中不属于水泥混凝土路面施工中常见质量控制关键点的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":26},"混凝土材料的检查与试验",{"key":24,"text":323,"correct":26},"混凝土配合比设计和试件的试验",{"key":28,"text":325,"correct":26},"锯缝时间和养生的掌握",{"key":31,"text":327,"correct":22},"施工缝留设和接缝时间的掌握",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},1133645,"钢筋笼接头质量如果存在问题将会对（ ）施工质量产生影响。",[332,334,336,338],{"key":20,"text":333,"correct":26},"扩大基础",{"key":24,"text":335,"correct":22},"钻孔桩",{"key":28,"text":337,"correct":26},"挖孔桩",{"key":31,"text":339,"correct":26},"沉井",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},1133647,"不属于拱桥支架施工常见质量控制点的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":26},"支架的沉降控制",{"key":24,"text":347,"correct":26},"拱架加载控制",{"key":28,"text":349,"correct":26},"卸架工艺控制",{"key":31,"text":351,"correct":22},"砌体强度控制",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1133648,"施工中需要控制预拱度的桥梁是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"简支梁桥",{"key":24,"text":359,"correct":26},"斜拉桥",{"key":28,"text":361,"correct":26},"拱桥",{"key":31,"text":363,"correct":26},"悬索桥",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},1133650,"在连续梁桥支架施工过程中，主要应注意控制（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":26},"支架基础",{"key":24,"text":371,"correct":26},"拱架加载",{"key":28,"text":373,"correct":26},"卸架工艺",{"key":31,"text":375,"correct":22},"支架沉降",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},1133652,"分项工程质量检验内容包括基本要求、实测项目、外观鉴定和（ ）四个部分。",[380,382,384,386],{"key":20,"text":381,"correct":26},"原材料产地",{"key":24,"text":383,"correct":26},"施工方法",{"key":28,"text":385,"correct":22},"质量保证资料",{"key":31,"text":387,"correct":26},"新技术工艺",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},1133654,"可采用修补法进行处理的质量缺陷是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":26},"桥墩构造裂缝",{"key":24,"text":395,"correct":26},"路基沉陷",{"key":28,"text":397,"correct":26},"沥青路面车辙",{"key":31,"text":399,"correct":22},"水泥路面局部麻面",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},1133656,"涉及结构安全和使用功能的重要实测项目为关键项目，其合格率不得低于（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":26},"100%",{"key":24,"text":407,"correct":22},"95%",{"key":28,"text":409,"correct":26},"90%",{"key":31,"text":411,"correct":26},"85%",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1133658,"不属于路基质量检验中石方路基实测项目的是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":26},"压实",{"key":24,"text":419,"correct":22},"砂浆强度",{"key":28,"text":421,"correct":26},"宽度",{"key":31,"text":423,"correct":26},"平整度",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":31,"analysis":33},1133660,"石方路基实测项目不包括（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"压实、纵断高程",{"key":24,"text":431,"correct":26},"中线偏位",{"key":28,"text":433,"correct":26},"宽度、平整度、横坡",{"key":31,"text":419,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},1133662,"下列关于填石路基工程质量检验基本要求的说法错误的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"填石路基上路床允许有部分碾压轮迹",{"key":24,"text":442,"correct":26},"填筑层厚度应符合施工技术规范规定并满足设计要求，填石空隙用石碴，石屑嵌压稳定",{"key":28,"text":444,"correct":26},"修筑填石路堤时应进行地表清理",{"key":31,"text":446,"correct":26},"填石路基应通过试验路确定沉降差控制标准",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},1133664,"土方路基实测项目中，属于关键项目的是（ ）。",[451,453,455,456],{"key":20,"text":452,"correct":22},"压实度",{"key":24,"text":454,"correct":26},"纵断高程",{"key":28,"text":431,"correct":26},{"key":31,"text":457,"correct":26},"边坡",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1133666,"属于浆砌挡土墙实测项目的是（ ）",[462,464,466,468],{"key":20,"text":463,"correct":26},"砂浆强度、中线位置、顶面高程、边坡坡度和平顺度",{"key":24,"text":465,"correct":26},"顶面坡度、断面尺寸、底面高程、表面平整度",{"key":28,"text":467,"correct":26},"顶面高程、断面尺寸、基底强度、表面平整度",{"key":31,"text":469,"correct":22},"砂浆强度、平面位置、墙面坡度，断面尺寸",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1133668,"水泥混凝土面层实测项目中，属于关键项目的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"纵横缝顺直度",{"key":24,"text":477,"correct":22},"水泥混凝土面板的弯拉强度",{"key":28,"text":479,"correct":26},"水泥混凝土路面的抗滑构造深度",{"key":31,"text":481,"correct":26},"相邻板间的高差",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1133670,"稳定粒料基层实测项目中不包含（ ）。",[486,487,489,490],{"key":20,"text":423,"correct":26},{"key":24,"text":488,"correct":26},"强度",{"key":28,"text":452,"correct":26},{"key":31,"text":491,"correct":22},"透水度",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},1133672,"关于混凝土扩大基础质量检验要求的说法中，错误的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":26},"基础处理及地基承载力应满足设计要求",{"key":24,"text":499,"correct":26},"地基超挖后严禁回填土",{"key":28,"text":501,"correct":26},"实测项目包括混凝土强度",{"key":31,"text":503,"correct":22},"基础底面高程为关键项目",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},1133674,"下列指标中，属于沥青混凝土路面检验项目的是（ ）。",[508,510,511,513],{"key":20,"text":509,"correct":22},"渗水系数",{"key":24,"text":475,"correct":26},{"key":28,"text":512,"correct":26},"面板的弯拉强度",{"key":31,"text":514,"correct":26},"相邻板高差",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":31,"analysis":33},1133676,"下列关于预应力筋的加工和张拉质量检验基本要求的说法错误的是（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":26},"预应力束表面不应有损伤",{"key":24,"text":522,"correct":26},"单根钢绞线不允许断丝",{"key":28,"text":524,"correct":26},"单根钢筋不允许断筋或滑移",{"key":31,"text":526,"correct":22},"同一截面预应力筋接头面积不超过预应力筋总面积的50%",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1133677,"就地浇筑梁（板）的实测项目中属于关键项目的是（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":26},"长度",{"key":24,"text":534,"correct":22},"混凝土强度",{"key":28,"text":536,"correct":26},"横坡",{"key":31,"text":423,"correct":26},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1133679,"下列检测项目中，不属于悬臂拼装梁的实测项目的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"断面尺寸",{"key":24,"text":545,"correct":26},"合龙后同跨对称点高程差",{"key":28,"text":547,"correct":26},"轴线偏位",{"key":31,"text":549,"correct":26},"顶面高程",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1133681,"关于喷射混凝土支护质量检验基本要求的说法中，错误的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"开挖断面的质量，超欠挖处理、围岩表面渗漏水处理应符合施工技术规范规定，受喷岩面应清洁",{"key":24,"text":557,"correct":22},"喷层内允许存在片石和木板等杂物。严禁挂模喷射混凝土",{"key":28,"text":559,"correct":26},"钢架与围岩之间的间隙应采用喷射混凝土充填密实",{"key":31,"text":561,"correct":26},"喷射混凝土表面平整度应符合施工规范规定",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},1133686,"施工现场的临时用电必须按照（ ）设置。",[566,568,570,572],{"key":20,"text":567,"correct":26},"一级配电一级保护",{"key":24,"text":569,"correct":26},"二级配电二级保护",{"key":28,"text":571,"correct":26},"三级配电一级保护",{"key":31,"text":573,"correct":22},"三级配电二级保护",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":28,"analysis":33},1133687,"关于打桩船作业的说法中，错误的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"打桩架上的活动物件应放稳、系牢，打桩架上的工作平台应设有防护栏杆和防滑装置",{"key":24,"text":581,"correct":26},"桩架底部两侧悬臂跳板的强度和刚度应满足作业要求",{"key":28,"text":583,"correct":22},"穿越群桩的前缆应选择合适位置，绞缆应缓慢操作，缆绳两侧20m范围内不得有工程船舶或作业人员进入",{"key":31,"text":585,"correct":26},"打桩船作业应统一指挥",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1133690,"根据公路工程陆上作业安全技术要求，在对滑坡地段进行开挖时应（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"滑坡体两侧向中部自上而下进行",{"key":24,"text":593,"correct":26},"滑坡体中部向两侧自上而下进行",{"key":28,"text":595,"correct":26},"滑坡体两侧向中部自下而上进行",{"key":31,"text":597,"correct":26},"全面拉槽开挖",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]