[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,7,50,1523,[13,34,46,58,70,82,94,106,118,130,142,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,413,425,437,449,461,470,482,493,505,517,529,541,553,565,577,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1133476,1,"单选题","既是决定工程全局的关键，又是工程施工组织设计核心内容的是（）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","工程设备",false,{"key":24,"text":25,"correct":22},"B","工程主要材料",{"key":27,"text":28,"correct":22},"C","工程工期要求",{"key":30,"text":31,"correct":32},"D","施工方案",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1133478,"关于工程进度曲线（“S”曲线）特点的说法，错误的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"一般情况下，项目施工初期的曲线斜率是逐渐增大的",{"key":24,"text":41,"correct":32},"一般情况下，项目施工后期的曲线为凹型",{"key":27,"text":43,"correct":22},"通过对“S”曲线的形状分析，可以定性分析施工组织设计中工作内容安排的合理性",{"key":30,"text":45,"correct":22},"在项目实施过程中，“S”曲线可结合工程进度管理曲线（“香蕉”曲线）进行施工进度、费用控制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1133480,"下列施工机械中，不适用开挖沟的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"平地机",{"key":24,"text":53,"correct":32},"铲运机",{"key":27,"text":55,"correct":22},"推土机",{"key":30,"text":57,"correct":22},"挖掘机",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1133482,"根据《公路工程质量检验评定标准》，下列检测项目中，不属于沥青混凝土桥面铺装施工质量检验实测项目的是（）",[62,64,66,68],{"key":20,"text":63,"correct":32},"弯沉值",{"key":24,"text":65,"correct":22},"厚度",{"key":27,"text":67,"correct":22},"平整度",{"key":30,"text":69,"correct":22},"抗滑构造深度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1133484,"下列计划中，不属于资源计划的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"劳动力计划",{"key":24,"text":77,"correct":32},"施工进度计划",{"key":27,"text":79,"correct":22},"材料计划",{"key":30,"text":81,"correct":22},"施工机械设备计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1133486,"根据《公路工程施工分包管理办法》，下列说法错误的是（）",[86,88,90,92],{"key":20,"text":87,"correct":22},"分包工程在开工前，承包人必须填报开工报审表，并附有监理人审批且取得发包人同意的书面文件",{"key":24,"text":89,"correct":22},"监理人收到分包工程开工报审表后，审查其是否具备开工条件，确定是否批复其开工申请",{"key":27,"text":91,"correct":22},"监理人应检查核实分包人实施分包工程的主要人员与施工设备",{"key":30,"text":93,"correct":32},"监理人应对分包工程实施现场监管，及时发现分包工程在质量、进度等方面的问题，并通知分包人及时采取措施",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1133488,"下列工作中，属于竣工验收内容的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"检查施工合同的执行情况",{"key":24,"text":101,"correct":22},"评价工程质量是否符合技术标准和设计要求",{"key":27,"text":103,"correct":22},"评价工程质量是否满足通车要求",{"key":30,"text":105,"correct":32},"对工程质量、参建单位和建设项目进行综合评价",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1133490,"公路水运工程安全生产专项费用根据《企业安全生产费用提取和使用管理办法》规定，不得低于建筑安装工程造价的（ ）的比例计取，且不得作为竞争性报价。",[110,112,114,116],{"key":20,"text":111,"correct":22},"0.5%",{"key":24,"text":113,"correct":22},"1%",{"key":27,"text":115,"correct":32},"1.5%",{"key":30,"text":117,"correct":22},"3%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1133492,"监理工程师已向承包人出具经发包人签认的进度付款证书，则发包人应在监理人收到进度付款申请单后的（ ）天内，将进度应付款支付给承包人。",[122,124,126,128],{"key":20,"text":123,"correct":22},"14",{"key":24,"text":125,"correct":32},"28",{"key":27,"text":127,"correct":22},"30",{"key":30,"text":129,"correct":22},"56",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1133494,"预制梁最多存放层数应符合设计文件和相关技术规范要求。设计文件无规定时，空心板叠层不得超过（ ）层，小箱梁堆叠存放不超过（ ）层。",[134,136,138,140],{"key":20,"text":135,"correct":22},"2；3",{"key":24,"text":137,"correct":22},"2；4",{"key":27,"text":139,"correct":32},"3；2",{"key":30,"text":141,"correct":22},"3；3",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1133496,"工程的计量工作由监理工程师单独承担，若承包人对计量有异议，可在（ ）d内以书面形式提出。",[146,148,149,151],{"key":20,"text":147,"correct":32},"7",{"key":24,"text":123,"correct":22},{"key":27,"text":150,"correct":22},"21",{"key":30,"text":125,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},1133498,"施工平面布置设计原则不包括（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"必须符合安全生产.保安防火和文明施工的规定和要求",{"key":24,"text":159,"correct":22},"一切设施和布局，必须满足施工进度.方法.工艺流程及科学组织生产的需要",{"key":27,"text":161,"correct":32},"充分利用原有地形.地物.多占农田.因地制宜，以降低工程成本",{"key":30,"text":163,"correct":22},"充分考虑水文.地质.气象等自然条件的影响",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1133500,"路堑高边坡施工安全要求正确的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"对滑坡体加固可按照从滑体中部向滑体边缘逐步推进加固.分段跳槽开挖施工",{"key":24,"text":171,"correct":22},"雷雨季节应采用电力起爆法",{"key":27,"text":173,"correct":32},"采取浅孔少装药.松动爆破等飞石少的方法",{"key":30,"text":175,"correct":22},"爆破后5分钟后才能进入现场，按规定检查和处理盲炮",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},1133502,"混凝土护栏实测项目中属于关键实测项目的是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"钢筋骨架尺寸",{"key":24,"text":183,"correct":22},"护栏断面尺寸",{"key":27,"text":185,"correct":32},"护栏混凝土强度",{"key":30,"text":187,"correct":22},"基础厚度",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":30,"analysis":33},1133504,"工程计量的组织类型不包括（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"监理工程师独立计量",{"key":24,"text":195,"correct":22},"承包人进行计量",{"key":27,"text":197,"correct":22},"监理工程师与承包人共同计量",{"key":30,"text":199,"correct":32},"监理工程师与业主共同计量",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1133506,"某40km长的高速公路沥青混凝土路面施工，沥青混凝土搅拌设备应使用（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"连续滚筒式",{"key":24,"text":207,"correct":32},"间歇强制式",{"key":27,"text":209,"correct":22},"鼓筒式",{"key":30,"text":211,"correct":22},"双锥反转出料式",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1133508,"下列不符合项目部选址要求的是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"满足安全.实用.环保的要求，以工作方便为原则",{"key":24,"text":219,"correct":32},"应离集中爆破区400m以上",{"key":27,"text":221,"correct":22},"不得占用独立大桥下部空间.河道.互通匝道区及规划的取.弃土场",{"key":30,"text":223,"correct":22},"用地合法，周围无塌方.滑坡.落石.泥石流.洪涝等自然灾害隐患",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},1133510,"下列关于土方路基工程施工中常见质量控制关键点的错误表达是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"施工放样与断面测量",{"key":24,"text":231,"correct":22},"分层压实，控制填土的含水量，确保压实度达到设计要求",{"key":27,"text":233,"correct":22},"路基原地面处理，按施工技术合同或规范规定要求处理，并认真整平压实",{"key":30,"text":235,"correct":32},"拌和设备计量装置校验",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":30,"analysis":33},1133512,"根据《公路工程建设项目招标投标管理办法》（交通运输部令2015年第24号），公路工程建设项目在（），方可开展施工招标。",[240,242,244,246],{"key":20,"text":241,"correct":22},"施工许可证办理",{"key":24,"text":243,"correct":22},"初步设计文件批准后",{"key":27,"text":245,"correct":22},"可行性研究文件批准后",{"key":30,"text":247,"correct":32},"施工图设计文件批准后",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1133514,"“前锋线比较法”主要适用于（）的进度计划检查。",[252,254,256,258],{"key":20,"text":253,"correct":32},"时标网络图",{"key":24,"text":255,"correct":22},"“S”型曲缝",{"key":27,"text":257,"correct":22},"横道图",{"key":30,"text":259,"correct":22},"“香蕉”型曲线",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1133516,"下列关于水泥混凝土搅拌设备的说法，错误的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"水泥混凝土拌合设备分为水泥混凝土搅拌机和水泥混凝土搅拌站两大类",{"key":24,"text":267,"correct":32},"混凝土搅拌机按其结构形式可分为鼓筒式和强制式两种",{"key":27,"text":269,"correct":22},"强制式搅拌设备可拌制低塑性混凝土",{"key":30,"text":271,"correct":22},"强制式搅拌设备适用于水泥混凝土路面工程",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},1133518,"对于重大施工方案，应由（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"项目经理组织编制，施工单位技术管理部门组织审核",{"key":24,"text":279,"correct":22},"项目技术负责人组织编制，项目经理组织审核",{"key":27,"text":281,"correct":32},"项目技术负责人组织编制，施工单位技术管理部门组织审核",{"key":30,"text":283,"correct":22},"施工单位技术管理部门组织编制，总监理工程师组织审核",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1133519,"（ ）是成本管理中编制成本计划的依据。",[288,290,292,294],{"key":20,"text":289,"correct":22},"项目预算（直接）成本",{"key":24,"text":291,"correct":32},"计划预算（直接）成本",{"key":27,"text":293,"correct":22},"实际预算（直接）成本",{"key":30,"text":295,"correct":22},"责任目标成本",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1133523,"生产经营单位主要负责人初次安全培训时间不得少于（ ）学时。",[300,302,304,306],{"key":20,"text":301,"correct":22},"24",{"key":24,"text":303,"correct":32},"32",{"key":27,"text":305,"correct":22},"12",{"key":30,"text":307,"correct":22},"36",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},1133525,"桥梁基坑施工风险控制中，当在基坑外堆土时，堆土应距基坑边缘（ ）m以外，堆土高度不得超过1.5m。",[312,314,316,318],{"key":20,"text":313,"correct":22},"0.5",{"key":24,"text":315,"correct":32},"1",{"key":27,"text":317,"correct":22},"2",{"key":30,"text":319,"correct":22},"3",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":30,"analysis":33},1133527,"下列各项合同文件按照优先解释的原则，处于最后解释的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"中标通知书",{"key":24,"text":327,"correct":22},"专项合同条款",{"key":27,"text":329,"correct":22},"技术规范",{"key":30,"text":331,"correct":32},"图纸",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1133534,"某工程合同价为500万元，合同价的60%为可调部分。可调部分，人工费占35%，材料费55%，其余占10%。结算时，人工费价格指数增长10%，材料费价格指数增长20%，其余未发生变化。按照调值公式法计算，该工程的结算工程价款为（ ）万元。",[336,338,340,342],{"key":20,"text":337,"correct":22},"610",{"key":24,"text":339,"correct":32},"543.5",{"key":27,"text":341,"correct":22},"511.25",{"key":30,"text":343,"correct":22},"500",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1133538,"下列不符合施工便道技术要求的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":32},"大型作业区，进出场的便道150m范围应进行硬化，标准为C20混凝土",{"key":24,"text":351,"correct":22},"便道两侧应设置排水系统",{"key":27,"text":353,"correct":22},"单车道路基宽度不小于4.5m，路面宽度不小于3m",{"key":30,"text":355,"correct":22},"每300m范围内应设置一个长度不小于20m.路面宽度不小于5.5m的错车道",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":30,"analysis":33},1133543,"关于公路施工企业信用评价规则的说法，错误的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"每年开展一次定期评价工作",{"key":24,"text":363,"correct":22},"施工企业信用升级每年最多可上升一个等级",{"key":27,"text":365,"correct":22},"联合体某一方有不良履约行为的，联合体各方均应扣分",{"key":30,"text":367,"correct":32},"因企业资质升级的，其信用评价等级也相应升级",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":30,"analysis":33},1133545,"某高速公路桥涵工程单跨最大跨度60m，桥梁总长400m，可承包该工程的公路施工企业是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"公路工程施工总承包三级企业",{"key":24,"text":375,"correct":22},"公路路面工程专业承包一级企业",{"key":27,"text":377,"correct":22},"公路路基工程专业承包一级企业",{"key":30,"text":379,"correct":32},"公路桥梁工程专业承包二级企业",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1133547,"隧道工程专业二级承包企业承包工程的范围是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"可承担各类隧道工程的施工",{"key":24,"text":387,"correct":32},"可承担断面60㎡及以下且长度1000m及以下的隧道工程施工",{"key":27,"text":389,"correct":22},"可承担断面80㎡及以下且长度1500m及以下的隧道工程施工",{"key":30,"text":391,"correct":22},"可承担断面80㎡及以下且长度1000m及以下的隧道工程施工",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":27,"analysis":33},1133551,"下列关于质量事故的说法错误的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"特别重大质量事故是指造成直接经济损失损失1亿元以上的事故",{"key":24,"text":399,"correct":22},"公路水运建设工程质量事故分为特别重大.重大.较大和一般质量事故四个等级",{"key":27,"text":401,"correct":32},"一般质量事故是指1000万元以下直接经济损失的事故",{"key":30,"text":403,"correct":22},"特长隧道结构坍塌是重大质量事故",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":30,"analysis":33},1133553,"招标人应当自收到评标报告之日起3日内，在对该项目具有招标监督职责的交通运输主管部门政府网站或者其指定的其他网站上公示中标候选人，公示期不得少于（ ）日。",[408,409,410,412],{"key":20,"text":147,"correct":22},{"key":24,"text":123,"correct":22},{"key":27,"text":411,"correct":22},"15",{"key":30,"text":319,"correct":32},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":27,"analysis":33},1133555,"下列关于高速公路路堑高边坡工程施工安全风险评估的说法中，错误的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"高速公路路堑高边坡工程施工安全风险评估划分为总体风险评估和专项风险评估两个阶段，一般采用专家调查评估法.指标体系法",{"key":24,"text":420,"correct":22},"总体风险评估结论应作为编制路堑边坡工程施工组织设计的依据",{"key":27,"text":422,"correct":32},"专项风险评估为在总体风险评估基础上，将风险等级达到高度风险（Ⅱ级）及以上的路堑段作为评估单元，进行风险辨识.分析.估测",{"key":30,"text":424,"correct":22},"专项风险评估结论应作为编制或完善专项施工方案的依据",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1133557,"根据《公路施工企业信用评价规则》，错误的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"公路施工企业投标行为由招标人负责评价",{"key":24,"text":432,"correct":32},"公路施工企业信用评价结果有效期为2年",{"key":27,"text":434,"correct":22},"公路施工企业资质升级的，其信用等级不变",{"key":30,"text":436,"correct":22},"联合体参加投标时，其信用等级按照联合体各方最低等级认定",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},1133559,"根据《公路施工企业信用评价规则》，下列关于信用评价等级的说法，错误的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"公路施工企业资质升级的，其信用评价等级不变",{"key":24,"text":444,"correct":22},"企业分立的，按照新设立企业确定信用评价等级，但不得高于原评价等级",{"key":27,"text":446,"correct":32},"企业合并的，按照合并前信用评价等级较高企业等级确定",{"key":30,"text":448,"correct":22},"联合体参与投标时，其信用等级按照联合体各方最低等级认定",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1133561,"某道路工程在交工验收时，发现一段长约300m的混凝土挡墙质量达不到合格标准，需加固补强，从而造成了直接经济损失（包括修复费用）200万元。按公路工程质量事故的分类及分级标准，这个事故属于（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":32},"一般质量事故",{"key":24,"text":456,"correct":22},"较大质量事故",{"key":27,"text":458,"correct":22},"重大质量事故",{"key":30,"text":460,"correct":22},"特别重大质量事故",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1133563,"道路交通事故、火灾事故自发生之日起（ ）日内，事故造成的伤亡人数发生变化的，应当及时补报。",[465,466,468,469],{"key":20,"text":147,"correct":32},{"key":24,"text":467,"correct":22},"10",{"key":27,"text":125,"correct":22},{"key":30,"text":127,"correct":22},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1133567,"根据《公路工程设计变更管理办法》相关规定，重大设计变更由（ ）负责审批。",[474,476,478,480],{"key":20,"text":475,"correct":22},"建设单位",{"key":24,"text":477,"correct":32},"交通运输部",{"key":27,"text":479,"correct":22},"省级交通运输主管部门",{"key":30,"text":481,"correct":22},"国家审计署",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1133569,"根据《公路水运工程质量监督管理规定》，负责对公路工程从业单位进行质量监督检查的部门是（ ）。",[486,487,489,491],{"key":20,"text":475,"correct":22},{"key":24,"text":488,"correct":32},"交通运输主管部门或其委托的建设工程质量监督机构",{"key":27,"text":490,"correct":22},"监理单位",{"key":30,"text":492,"correct":22},"勘察设计单位",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1133573,"桥墩施工时，如果设备或者模板数量有限时宜采用()。",[497,499,501,503],{"key":20,"text":498,"correct":22},"平行施工",{"key":24,"text":500,"correct":32},"流水施工",{"key":27,"text":502,"correct":22},"顺序施工",{"key":30,"text":504,"correct":22},"平行顺序施工",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1133575,"施工平面布置图包含的内容一般不包括（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"原有地形地物",{"key":24,"text":512,"correct":32},"距离施工现场较远的城镇",{"key":27,"text":514,"correct":22},"安全消防设施",{"key":30,"text":516,"correct":22},"施工防排水临时设施",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":27,"analysis":33},1133578,"施工方案的优化中，主要通过（ ）的优化使得在取得好的经济效益同时还要有技术上的先进性。",[521,523,525,527],{"key":20,"text":522,"correct":22},"施工顺序",{"key":24,"text":524,"correct":22},"施工劳动组织",{"key":27,"text":526,"correct":32},"施工方法",{"key":30,"text":528,"correct":22},"施工作业组织形式",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":27,"analysis":33},1133579,"隧道施工中，以（ ）为中心布置施工场地。",[533,535,537,539],{"key":20,"text":534,"correct":22},"钻爆",{"key":24,"text":536,"correct":22},"支护",{"key":27,"text":538,"correct":32},"洞口",{"key":30,"text":540,"correct":22},"项目部",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1133581,"确定隧道掘进循环进尺应注意的问题是（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"危险品库房按有关安全规定办理",{"key":24,"text":548,"correct":32},"钻爆作业设计",{"key":27,"text":550,"correct":22},"合理布置大堆材料堆放位置",{"key":30,"text":552,"correct":22},"运输通道应统一规划、布局合理",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},1133583,"桥梁下部的桥墩流水施工的工序太多时，简化合并为墩与墩之间的关系，此时墩与墩之间的关系是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"开始到完成",{"key":24,"text":560,"correct":22},"完成到开始",{"key":27,"text":562,"correct":32},"搭接关系",{"key":30,"text":564,"correct":22},"衔接关系",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":30,"analysis":33},1133585,"在选择路面各结构层之间搭接类型时，后道工序快于前道工序时，应选择（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"STS",{"key":24,"text":572,"correct":22},"STF",{"key":27,"text":574,"correct":22},"FTS",{"key":30,"text":576,"correct":32},"FTF",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":30,"analysis":33},1133587,"路面工程施工中，相邻结构层之间的速度决定了相邻结构层之间的搭接类型，前道工序的速度慢于后道工序时选用（ ）搭接类型。",[581,583,584,585],{"key":20,"text":582,"correct":22},"开始到开始",{"key":24,"text":558,"correct":22},{"key":27,"text":560,"correct":22},{"key":30,"text":586,"correct":32},"完成到完成",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},1133589,"在平原地区的路基施工中，（ ）为主要工序。",[591,593,595,597],{"key":20,"text":592,"correct":22},"移挖作填",{"key":24,"text":594,"correct":22},"半填半挖",{"key":27,"text":596,"correct":32},"路基填方",{"key":30,"text":598,"correct":22},"排水设施",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":30,"analysis":33},1133590,"下列关于工程量清单的编写说法错误的是（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"清单说明主要说明在编制工程量清单时应遵守的规定及注意事项",{"key":24,"text":606,"correct":22},"不同种类的工作应分别列出项目",{"key":27,"text":608,"correct":22},"同一性质但施工部位或条件不同的工作应分别列出项目",{"key":30,"text":610,"correct":32},"劳务和施工机械两个计日工表的计量（或计价）单位是“日”",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]