[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,6,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,463,475,487,499,507,519,531,543,555,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1133365,1,"单选题","后张法预制梁，当预制梁跨度大于（ ）m时，要按规定设置反拱。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","10",false,{"key":24,"text":25,"correct":26},"B","20",true,{"key":28,"text":29,"correct":22},"C","30",{"key":31,"text":32,"correct":22},"D","40","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1133367,"在水中筑岛制作沉井时，对无围堰的筑岛，应在沉井周围设置不小于（ ）m宽的护道。",[38,40,42,44],{"key":20,"text":39,"correct":22},"2.0",{"key":24,"text":41,"correct":22},"1.0",{"key":28,"text":43,"correct":26},"1.5",{"key":31,"text":45,"correct":22},"2.5",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1133369,"地下连续墙导墙施工时，导墙顶端应高出地面，遇地下水位较高时，导墙顶端应高于稳定后的地下水位（ ）以上。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1.0m",{"key":24,"text":53,"correct":26},"1.5m",{"key":28,"text":55,"correct":22},"2.0m",{"key":31,"text":57,"correct":22},"2.5m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1133371,"桥梁灌注桩钻孔施工中，适合于在有孤石的砂砾石层、漂石层、硬土层、岩层中使用的钻孔机械是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"液压循环钻机",{"key":24,"text":65,"correct":26},"冲击钻机",{"key":28,"text":67,"correct":22},"旋挖钻机",{"key":31,"text":69,"correct":22},"潜水钻机",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1133375,"下列选项，不属于公路桥涵设计采用的作用的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"永久作用",{"key":24,"text":77,"correct":26},"固定作用",{"key":28,"text":79,"correct":22},"可变作用",{"key":31,"text":81,"correct":22},"偶然作用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1133377,"钻孔灌注桩施工中，钻孔至设计孔深后，其紧后工序是（）",[86,88,90,92],{"key":20,"text":87,"correct":22},"下放导管",{"key":24,"text":89,"correct":26},"清孔",{"key":28,"text":91,"correct":22},"钢筋笼制作及安放",{"key":31,"text":93,"correct":22},"灌注水下混凝土",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1133379,"桥梁基础施工的基坑排水方法中，井点降水法不适用于（ ）的土质基坑。",[98,100,102,104],{"key":20,"text":99,"correct":26},"无砂的黏质土",{"key":24,"text":101,"correct":22},"地下水位较高",{"key":28,"text":103,"correct":22},"坑壁不易稳定",{"key":31,"text":105,"correct":22},"土质较差且有严重流砂",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1133381,"关于人工挖孔桩安全控制要求的说法，错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"同排桩应采用跳槽开挖方法",{"key":24,"text":113,"correct":22},"土层或破碎岩石中挖孔桩应采用钢筋混凝土护壁",{"key":28,"text":115,"correct":26},"孔内爆破宜采用深眼松动爆破",{"key":31,"text":117,"correct":22},"孔口处应设置护圈，且护圈应高出地面0.3m",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1133383,"预应力张拉用的千斤顶与压力表，不需要重新进行标定的情形是（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"使用时间达到3个月",{"key":24,"text":125,"correct":22},"张拉次数超过300次",{"key":28,"text":127,"correct":22},"千斤顶检修后",{"key":31,"text":129,"correct":22},"更换新压力表",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1133385,"桥梁上部结构悬臂浇筑法施工中，合龙段混凝土浇筑时间宜安排在一天中的（ ）时段浇筑。",[134,136,138,140],{"key":20,"text":135,"correct":22},"平均气温",{"key":24,"text":137,"correct":22},"最高气温",{"key":28,"text":139,"correct":26},"最低气温",{"key":31,"text":141,"correct":22},"任意",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1133387,"关于钢板桩围堰说法错误的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"施打前，钢板桩的锁口应用止水材料捻缝，以防漏水",{"key":24,"text":149,"correct":26},"施打顺序按施工组织设计进行，一般由下游分两头向上游合龙。",{"key":28,"text":151,"correct":22},"钢板桩可用锤击、振动、射水等方法下沉",{"key":31,"text":153,"correct":22},"接长的钢板桩，其相邻两钢板桩的接头位置应上下错开",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1133389,"关于预应力钢绞线进场检测验收的说法，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"每批进行拉力和冷弯试验",{"key":24,"text":161,"correct":22},"每批进行抗拉强度和弯曲试验",{"key":28,"text":163,"correct":22},"每批进行长度与直径偏差及力学性能试验",{"key":31,"text":165,"correct":26},"每批进行表面质量.直径偏差和力学性能试验",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1133391,"双壁钢围堰拼焊后应进行焊接质量检验及（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"抗拉试验",{"key":24,"text":173,"correct":22},"抗剪试验",{"key":28,"text":175,"correct":26},"水密试验",{"key":31,"text":177,"correct":22},"疲劳试验",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1133393,"桥梁中的梁作为承重结构，是以它的（ ）来承受荷载的。",[182,184,186,188],{"key":20,"text":183,"correct":22},"抗压能力",{"key":24,"text":185,"correct":26},"抗弯能力",{"key":28,"text":187,"correct":22},"抗拉能力",{"key":31,"text":189,"correct":22},"抗剪能力",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1133395,"下列关于钢桥安装时的高强度螺栓连接施工要求的说法，错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"高强度螺栓的穿入方向应全桥一致，且应自由穿入孔内",{"key":24,"text":197,"correct":26},"对不能自由穿入螺栓的孔，应采用气割方法扩孔",{"key":28,"text":199,"correct":22},"施拧高强度螺栓时，对大面积节点板应从中间部分向四周的边缘进行施拧",{"key":31,"text":201,"correct":22},"施拧高强度螺栓时应在当天终拧完毕",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1133399,"采用滑升模板浇筑桥墩混凝土时，混凝土脱模时的强度宜为（ ）MPa。",[206,208,210,212],{"key":20,"text":207,"correct":22},"0.2～0.3",{"key":24,"text":209,"correct":26},"0.2～0.5",{"key":28,"text":211,"correct":22},"0.3～0.5",{"key":31,"text":213,"correct":22},"0.5～0.7",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1133401,"为控制悬臂浇筑钢筋混凝土箱梁桥的施工挠度，应在（ ）建立相对坐标系。",[218,220,222,224],{"key":20,"text":219,"correct":22},"0号桥台顶面",{"key":24,"text":221,"correct":26},"0号块箱梁顶面",{"key":28,"text":223,"correct":22},"1号块箱梁顶面",{"key":31,"text":225,"correct":22},"合龙段箱梁顶面",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1133403,"验算桥梁支架及拱架的刚度时，要求其受载后挠曲杆件的弹性挠度不得超过相应结构跨度的（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"1\u002F250",{"key":24,"text":233,"correct":22},"1\u002F300",{"key":28,"text":235,"correct":26},"1\u002F400",{"key":31,"text":237,"correct":22},"1\u002F500",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1133405,"基坑施工过程中，用机械开挖至坑底时，应保留不小于（ ）厚度的底层。",[242,244,246,248],{"key":20,"text":243,"correct":26},"30cm",{"key":24,"text":245,"correct":22},"40cm",{"key":28,"text":247,"correct":22},"50cm",{"key":31,"text":249,"correct":22},"60cm",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1133407,"预制构件应按吊装次序、方向水平分层堆放，标志向外，板梁平放，一般不宜超过（ ）层，要逐层支撑牢固，层与层间要以垫木隔开，相邻构件间要留出适当宽度的通道。",[254,256,258,260],{"key":20,"text":255,"correct":22},"2",{"key":24,"text":257,"correct":26},"3",{"key":28,"text":259,"correct":22},"4",{"key":31,"text":261,"correct":22},"5",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1133409,"移动支架逐孔现浇施工中，当一孔梁的混凝土浇筑施工完成后，内模中的侧向模板应在混凝土抗压强度达到（ ）后，顶面模板应在混凝土抗压强度达到设计强度的（ ）后，方可拆除。",[266,268,270,272],{"key":20,"text":267,"correct":22},"5.0MPa，75%",{"key":24,"text":269,"correct":22},"2.5MPa，80%",{"key":28,"text":271,"correct":22},"5.0MPa，80%",{"key":31,"text":273,"correct":26},"2.5MPa，75%",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1133411,"悬索桥防腐涂装施工中，工地焊接的表面补涂油漆应在表面除锈（ ）h内进行。",[278,280,282,284],{"key":20,"text":279,"correct":22},"6",{"key":24,"text":281,"correct":22},"12",{"key":28,"text":283,"correct":26},"24",{"key":31,"text":285,"correct":22},"48",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1133413,"关于泵送混凝土的说法，错误的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"不宜使用火山灰质硅酸盐水泥",{"key":24,"text":293,"correct":22},"粗集料宜采用连续级配",{"key":28,"text":295,"correct":22},"应掺入泵送剂或减水剂",{"key":31,"text":297,"correct":26},"不得掺入粉煤灰或其他活性矿物掺合料",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1133415,"某简支空心板梁桥桥面高21.75m，板厚60cm，桥面铺装厚12cm，设计洪水位标高16.5m，施工水位标高12.25m，低水位标高7.8m，则该桥梁高度为（）m。",[302,304,306,308],{"key":20,"text":303,"correct":22},"5.25",{"key":24,"text":305,"correct":22},"9.5",{"key":28,"text":307,"correct":22},"13.23",{"key":31,"text":309,"correct":26},"13.95",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1133417,"预应力后张法张拉施工时，工具锚（夹具）、千斤顶和工作锚（锚具）正确的安装顺序是（）",[314,316,318,320],{"key":20,"text":315,"correct":26},"工作锚——千斤顶——工具锚",{"key":24,"text":317,"correct":22},"工具锚——千斤顶——工作锚",{"key":28,"text":319,"correct":22},"工具锚——工作锚——千斤顶",{"key":31,"text":321,"correct":22},"工作锚——工具锚——千斤顶",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1133419,"连续梁桥可以实现较大跨径是由于其利用负（卸荷）弯矩来减少（）弯矩跨内的内力分配更合理。",[326,328,330,332],{"key":20,"text":327,"correct":26},"跨中",{"key":24,"text":329,"correct":22},"固定端",{"key":28,"text":331,"correct":22},"自由端",{"key":31,"text":333,"correct":22},"铰接点",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1133421,"泵送混凝土中不适合采用的外掺剂或掺合料是（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"减水剂",{"key":24,"text":341,"correct":26},"速凝剂",{"key":28,"text":343,"correct":22},"粉煤灰",{"key":31,"text":345,"correct":22},"活性矿物掺合料",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},1133423,"下面不属于产生桥头跳车的原因是（）",[350,352,354,356],{"key":20,"text":351,"correct":22},"台后地基强度与桥台地基强度不同",{"key":24,"text":353,"correct":22},"台后压实度达不到标准",{"key":28,"text":355,"correct":22},"台后填土材料不当",{"key":31,"text":357,"correct":26},"台后沉降小于设计容许值",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1133425,"预应力混凝土连续梁桥施工中，计算后张法预应力筋下料长度应考虑的（）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"预应力孔道曲线长度、预应力筋外露工作长度、锚夹具长度、千斤顶长度",{"key":24,"text":365,"correct":22},"梁的跨径、锚夹具长度、千斤顶长度、盖梁宽度",{"key":28,"text":367,"correct":22},"梁的长度、锚夹具长度、千斤顶长度、预应力筋外露工作长度",{"key":31,"text":369,"correct":22},"盖梁宽度、梁的长度、锚夹具长度、千斤顶长度",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1133427,"斜拉桥塔柱裸塔施工不宜采用的方法是（）",[374,376,378,380],{"key":20,"text":375,"correct":26},"支架法",{"key":24,"text":377,"correct":22},"爬模法",{"key":28,"text":379,"correct":22},"滑模法",{"key":31,"text":381,"correct":22},"翻模法",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1133429,"桥梁结构模板支架设计应考虑的荷载包括：①模板、支架和拱架自重；②新浇筑混凝土、钢筋混凝土或其他圬工结构物的重力；③施工人员和施工材料、机具等行走、运输或堆放的荷载；④振捣混凝土时产生的荷载；⑤新浇筑混凝土对侧面模板的压力；⑥倾倒混凝土时产生的水平荷载；⑦其他可能产生的荷载。其中现浇钢筋混凝土连续梁支架设计强度计算的荷载组合是（）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"①+②+⑤+⑥+⑦",{"key":24,"text":389,"correct":22},"①+②+③+⑥+⑦",{"key":28,"text":391,"correct":26},"①+②+③+④+⑦",{"key":31,"text":393,"correct":22},"②+③+④+⑥+⑦",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1133430,"钻孔灌注桩施工的主要工序有：埋设护筒、（ ）、清底、钢筋笼制作、吊装、灌注水下混凝土等。",[398,400,402,404],{"key":20,"text":399,"correct":22},"钻孔.抽浆",{"key":24,"text":401,"correct":26},"制备泥浆.钻孔",{"key":28,"text":403,"correct":22},"稳固护筒.抽浆",{"key":31,"text":405,"correct":22},"稳固护筒.制备泥浆",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1133432,"（ ）是反映拱桥受力特性的一个重要指标。",[410,412,414,416],{"key":20,"text":411,"correct":26},"矢跨比",{"key":24,"text":413,"correct":22},"桥梁孔径",{"key":28,"text":415,"correct":22},"净矢高",{"key":31,"text":417,"correct":22},"桥梁高度",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},1133435,"梁桥和拱桥上常用的重力式桥台为U型桥台，它适用于填土高度在（ ）m以下或跨度稍大的桥梁。",[422,424,426,428],{"key":20,"text":423,"correct":22},"7～9",{"key":24,"text":425,"correct":22},"8～9",{"key":28,"text":427,"correct":22},"7～10",{"key":31,"text":429,"correct":26},"8～10",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},1133437,"斜拉桥相当于增大了（ ）的体外索，充分发挥抵抗负弯矩的能力，（ ）钢材。",[434,436,438,440],{"key":20,"text":435,"correct":22},"弯矩，节约",{"key":24,"text":437,"correct":22},"弯矩，浪费",{"key":28,"text":439,"correct":26},"偏心距，节约",{"key":31,"text":441,"correct":22},"偏心距，浪费",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1133439,"下列模板安装的技术要求说法错误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":26},"模板应与脚手架连接，避免引起模板变形",{"key":24,"text":449,"correct":22},"安装侧模板时，应防止模板移位和凸出",{"key":28,"text":451,"correct":22},"模板在安装过程中，必须设置防倾覆设施",{"key":31,"text":453,"correct":22},"模板安装完毕后，应对其平面位置.顶部标高.节点联系及纵横向稳定性进行检查",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1133440,"非承重侧模板应在混凝土强度能保证其表面及棱角不致因拆模而受损坏时方可拆除，一般应在混凝土抗压强度达到（ ）MPa时方可拆除侧模板。",[458,460,461,462],{"key":20,"text":459,"correct":22},"1",{"key":24,"text":43,"correct":22},{"key":28,"text":45,"correct":26},{"key":31,"text":261,"correct":22},{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":28,"analysis":33},1133442,"张拉机具应进行校验，当千斤顶使用超过（ ）次，应重新进行标定。",[467,469,471,473],{"key":20,"text":468,"correct":22},"100",{"key":24,"text":470,"correct":22},"200",{"key":28,"text":472,"correct":26},"300",{"key":31,"text":474,"correct":22},"400",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1133444,"在钻孔灌注桩施工中，埋设护筒的主要作用不包括（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":26},"提高桩基承载力",{"key":24,"text":482,"correct":22},"保护孔口地面",{"key":28,"text":484,"correct":22},"钻头导向",{"key":31,"text":486,"correct":22},"防止坍孔",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1133448,"就地浇筑梁、板的实测项目中属于关键项目的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"长度",{"key":24,"text":494,"correct":26},"混凝土强度",{"key":28,"text":496,"correct":22},"横坡",{"key":31,"text":498,"correct":22},"平整度",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1133450,"如下图所示：C的总时差为（ ）。",[503,504,505,506],{"key":20,"text":459,"correct":26},{"key":24,"text":255,"correct":22},{"key":28,"text":257,"correct":22},{"key":31,"text":259,"correct":22},{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},1133452,"下列关于公路工程施工技术交底工作的表述，正确的是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"第三级项目总工向项目各部门负责人及全体技术人员进行交底",{"key":24,"text":514,"correct":26},"第二级项目技术部门负责人或各分部分项工程主管工程师向现场技术人员和班组长进行交底",{"key":28,"text":516,"correct":22},"第一级现场技术员负责向班组全体作业人员进行技术交底",{"key":31,"text":518,"correct":22},"第一级交底主要内容为分部分项工程的施工工序等",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},1133454,"下列测量工作中不属于开工准备阶段测量工作的是（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"交接桩",{"key":24,"text":526,"correct":22},"施工控制网建立",{"key":28,"text":528,"correct":22},"地形地貌复核测量",{"key":31,"text":530,"correct":26},"施工放样测量",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},1133458,"道路结构层局部压实度不足，这种质量缺陷可采用的处理方法是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":26},"整修",{"key":24,"text":538,"correct":22},"返工",{"key":28,"text":540,"correct":22},"综合处理方法",{"key":31,"text":542,"correct":22},"专题调研",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":20,"analysis":33},1133462,"图中挖3工序的最早开始时间和最早完成时间论述正确是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":26},"挖3工序最早在第5d后开始并且最早在第6d晚上结束",{"key":24,"text":550,"correct":22},"挖3工序最早在第5d早晨开始并且最早在第6d晚上结束",{"key":28,"text":552,"correct":22},"挖3工序最早在第5d后开始并且最早在第8d晚上结束",{"key":31,"text":554,"correct":22},"挖3工序最早在第5d早晨开始并且最早在第9d晚上结束",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":33},1133464,"施工方案的优化中，（ ）的优化要能取得好的经济效益同时还要有技术上的先进性。",[559,561,563,565],{"key":20,"text":560,"correct":22},"施工顺序",{"key":24,"text":562,"correct":22},"施工劳动组织",{"key":28,"text":564,"correct":26},"施工方法",{"key":31,"text":566,"correct":22},"施工作业组织形式",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1133468,"根据《公路水运工程施工安全标准化指南》，不属于危险性较大的分部分项工程是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"高度18m的土质边坡处理",{"key":24,"text":574,"correct":22},"水深15m的围堰工程",{"key":28,"text":576,"correct":22},"深度7m的挡墙基础",{"key":31,"text":578,"correct":22},"高瓦斯隧道",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1133470,"施工组织设计中对于资源利用的优化不包括（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"物资采购的优化",{"key":24,"text":586,"correct":22},"机械需要计划的优化",{"key":28,"text":588,"correct":26},"施工方案的优化",{"key":31,"text":590,"correct":22},"供应计划的优化",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":31,"analysis":33},1133472,"下列关于路基安全管理正确的是（）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"路堑边坡有加固工程的土质边坡在开挖后应在2周内完成加固",{"key":24,"text":598,"correct":22},"爆破器材运输保管施工操作等应按有关规定严格执行，雷雨季节应采用电力起爆法",{"key":28,"text":600,"correct":22},"采取浅孔少装药、松动爆破等飞石少的方法，放炮前设专人警戒，定时爆破，不得用石块覆盖炮孔，爆破后5分钟后才能进入现场，按规定检查和处理盲炮，检查处理危石",{"key":31,"text":602,"correct":26},"锚索张拉时，千斤顶后区域方严禁站人。",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":24,"analysis":33},1133474,"公路工程施工项目经理部是代表施工企业履行工程承包合同的主体，是最终产品质量责任的承担者，要代表企业对（）全面负责。",[607,609,611,613],{"key":20,"text":608,"correct":22},"监理单位",{"key":24,"text":610,"correct":26},"业主",{"key":28,"text":612,"correct":22},"质量监督机构",{"key":31,"text":614,"correct":22},"交通运输主管部门",[616,619,622,625,628,631],{"id":15,"name":617,"category":7,"favorite":618},"领导干部任职前廉政法规知识测试题",92,{"id":620,"name":621,"category":7,"favorite":15},595,"建筑结构与设备",{"id":623,"name":624,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":626,"name":627,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":629,"name":630,"category":7,"favorite":8},534,"BIM工程师",{"id":632,"name":630,"category":7,"favorite":8},535]