[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,5,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1133246,1,"单选题","下列选项中，不属于沥青稳定类基层的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","热拌沥青碎石",false,{"key":24,"text":25,"correct":22},"B","沥青贯入碎石",{"key":27,"text":28,"correct":22},"C","乳化沥青碎石混合料",{"key":30,"text":31,"correct":32},"D","沥青玛蹄脂碎石",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1133250,"下列关于现场冷再生工艺的优点说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"节省材料转运费用",{"key":24,"text":41,"correct":22},"施工过程能耗低",{"key":27,"text":43,"correct":32},"施工质量容易控制",{"key":30,"text":45,"correct":22},"污染小",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1133252,"关于填隙碎石基层施工技术要求的说法，错误的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"填隙碎石层上为薄沥青面层时，碾压后宜使集料的棱角外露3~5mm。",{"key":24,"text":53,"correct":22},"填隙料应干燥",{"key":27,"text":55,"correct":32},"宜采用胶轮压路机静压，碾压时，表面集料间应留有空隙",{"key":30,"text":57,"correct":22},"填隙碎石基层未洒透层沥青或未铺封层时，不得开放交通",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1133254,"采用滑模摊铺机施工法铺筑连续配筋混凝土路面时，布料最适合采用（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"正向上料的挖掘机",{"key":24,"text":65,"correct":22},"侧向上料的推土机",{"key":27,"text":67,"correct":22},"正向上料的装载机",{"key":30,"text":69,"correct":32},"侧向上料的供料机",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1133258,"工程常用的AC-I型沥青混凝土由连续级配矿料组成的沥青混合料结构为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"密实—悬浮结构",{"key":24,"text":77,"correct":22},"骨架—空隙结构",{"key":27,"text":79,"correct":22},"密实—嵌挤结构",{"key":30,"text":81,"correct":22},"密实—骨架结构",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1133260,"热拌沥青混凝土路面施工时，沥青加热温度的控制范围是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"120～150℃",{"key":24,"text":89,"correct":22},"140～165℃",{"key":27,"text":91,"correct":32},"150～170℃",{"key":30,"text":93,"correct":22},"160～180℃",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1133262,"试验段开工前28d安装好试验仪器和设备，配备好的试验人员报请（ ）审核。",[98,100,102,104],{"key":20,"text":99,"correct":32},"监理工程师",{"key":24,"text":101,"correct":22},"项目总工",{"key":27,"text":103,"correct":22},"项目经理",{"key":30,"text":105,"correct":22},"施工单位技术负责人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1133264,"沥青路面透层施工中，透层油洒布后待充分渗透，一般不少于（ ）后才能摊铺上层。",[110,112,114,116],{"key":20,"text":111,"correct":22},"12h",{"key":24,"text":113,"correct":32},"24h",{"key":27,"text":115,"correct":22},"36h",{"key":30,"text":117,"correct":22},"48h",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1133266,"混凝土路面在掺用粉煤灰时，可以采用（ ）粉煤灰。",[122,124,126,128],{"key":20,"text":123,"correct":22},"Ⅲ级低钙",{"key":24,"text":125,"correct":32},"Ⅱ级低钙",{"key":27,"text":127,"correct":22},"Ⅲ级",{"key":30,"text":129,"correct":22},"高钙",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1133268,"为使上下层沥青结构层或沥青结构层与结构物完全粘结成一个整体，浇洒的沥青薄层称为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"透层",{"key":24,"text":137,"correct":32},"粘层",{"key":27,"text":139,"correct":22},"封层",{"key":30,"text":141,"correct":22},"结合层",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1133270,"用做路面和桥面混凝土的粗集料中，碎石最大公称粒径不应大于（ ）mm。",[146,148,150,152],{"key":20,"text":147,"correct":22},"19",{"key":24,"text":149,"correct":22},"26.5",{"key":27,"text":151,"correct":32},"31.5",{"key":30,"text":153,"correct":22},"35",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1133272,"当路面基层施工完毕后，即可进行中央分隔带的开挖，先挖集水槽后挖（ ），一般采用人工开挖的方式。",[158,160,162,164],{"key":20,"text":159,"correct":22},"横向沟槽",{"key":24,"text":161,"correct":22},"横向盲沟",{"key":27,"text":163,"correct":22},"路缘石沟槽",{"key":30,"text":165,"correct":32},"纵向盲沟",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1133274,"水泥混凝土路面施工中，采用自卸车运输混凝土拌合物时，自卸车在运输过程中应减小颠簸，其目的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":32},"防止拌合物离析",{"key":24,"text":173,"correct":22},"防止拌合物坍落度变大",{"key":27,"text":175,"correct":22},"防止拌合物凝结硬化",{"key":30,"text":177,"correct":22},"防止拌合物坍落度损失过大",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1133276,"下列关于沥青混合料摊铺的有关说法错误的是（）",[182,184,186,188],{"key":20,"text":183,"correct":22},"摊铺过程中不准随意变换速度，尽量避免中途停顿",{"key":24,"text":185,"correct":32},"开铺前将摊铺机的熨平板进行加热至不低于90℃",{"key":27,"text":187,"correct":22},"下、中面层采用走线法施工，上面层采用平衡梁法施工",{"key":30,"text":189,"correct":22},"沥青混凝土的摊铺温度一般正常施工控制在不低于125～140℃",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1133278,"关于连续体系梁桥受力特点说法，错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"可以减少跨内主梁的高度，提高跨径",{"key":24,"text":197,"correct":22},"配筋要考虑正负两种弯矩的要求",{"key":27,"text":199,"correct":32},"属于静定结构",{"key":30,"text":201,"correct":22},"可产生包括预应力、混凝土的收缩徐变等引起的附加内力",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},1133280,"在恒载作用下的无纵坡桥梁中，（ ）将在其墩台中产生水平力。",[206,208,210,212],{"key":20,"text":207,"correct":22},"连续梁桥",{"key":24,"text":209,"correct":22},"斜拉桥",{"key":27,"text":211,"correct":22},"简支梁桥",{"key":30,"text":213,"correct":32},"拱桥",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},1133286,"桥梁附属设施不包括（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"桥头搭板",{"key":24,"text":221,"correct":22},"桥面系",{"key":27,"text":223,"correct":32},"桥头引道",{"key":30,"text":225,"correct":22},"伸缩缝",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},1133288,"某高速公路有一座单跨拱桥，其净跨径为l0，计算跨径为l，净矢高为f0，计算矢高为f，则该拱桥的矢跨比为（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"f0\u002Fl0",{"key":24,"text":233,"correct":22},"f0\u002Fl",{"key":27,"text":235,"correct":22},"f\u002Fl0",{"key":30,"text":237,"correct":32},"f\u002Fl",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1133289,"除圆管涵和箱涵外，单孔跨径小于（ ）的泄水或通行的小型构造物是涵洞。",[242,244,246,248],{"key":20,"text":243,"correct":32},"5m",{"key":24,"text":245,"correct":22},"6m",{"key":27,"text":247,"correct":22},"7m",{"key":30,"text":249,"correct":22},"8m",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1133293,"在桥梁基础分类中，属于直接基础，将来自上部结构的荷载通过基础底板直接传递给承载地基的基础是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":32},"扩大基础",{"key":24,"text":257,"correct":22},"桩基础",{"key":27,"text":259,"correct":22},"地下连续墙基础",{"key":30,"text":261,"correct":22},"沉井基础",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},1133295,"关于斜拉桥受力特点的说法，错误的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"主梁为多点弹性支承",{"key":24,"text":269,"correct":22},"主梁高跨比小，自重轻",{"key":27,"text":271,"correct":32},"斜拉索相当于减小了偏心距的体外索",{"key":30,"text":273,"correct":22},"斜拉索的水平分力相当于梁体混凝土的预压力",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},1133297,"下列桥墩中属于拱桥轻型桥墩的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"混凝土薄壁桥墩",{"key":24,"text":281,"correct":22},"柱式桥墩",{"key":27,"text":283,"correct":22},"钻孔桩柱式桥墩",{"key":30,"text":285,"correct":32},"带三角杆件的单向推力墩",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1133299,"当验算模板及其支架在自重和风荷载等作用下的抗倾倒稳定时，验算倾覆的稳定系数不得小于（）。",[290,292,294,296],{"key":20,"text":291,"correct":32},"1.3",{"key":24,"text":293,"correct":22},"1.5",{"key":27,"text":295,"correct":22},"1.8",{"key":30,"text":297,"correct":22},"2",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1133301,"桥梁混凝土浇筑时，若施工缝为斜面，则施工缝应（）。",[302,304,306,308],{"key":20,"text":303,"correct":32},"浇筑成或凿成台阶状",{"key":24,"text":305,"correct":22},"设置止水带",{"key":27,"text":307,"correct":22},"及时修整抹光",{"key":30,"text":309,"correct":22},"补插拉杆",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":30,"analysis":33},1133303,"桥梁钢筋的纵向焊接有条件应尽量采用（）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"电弧焊",{"key":24,"text":317,"correct":22},"电渣压力焊",{"key":27,"text":319,"correct":22},"气压焊",{"key":30,"text":321,"correct":32},"闪光对焊",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},1133305,"桥梁钢筋骨架施焊顺序错误的是（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"由中到边对称地向两端进行",{"key":24,"text":329,"correct":22},"先焊骨架下部，后焊骨架上部",{"key":27,"text":331,"correct":22},"相邻的焊缝采用分区对称跳焊",{"key":30,"text":333,"correct":32},"顺骨架轴线方向一次焊成",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1133307,"关于采用泵送混凝土的说法，正确的是（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"泵送混凝土应选用火山灰质硅酸盐水泥",{"key":24,"text":341,"correct":32},"泵送混凝土中应掺入泵送剂或减水剂",{"key":27,"text":343,"correct":22},"泵送混凝土试配时要求的坍落度值应与入泵时的坍落度一致",{"key":30,"text":345,"correct":22},"当掺用掺合料较多时，还应进行钢筋锈蚀试验，可以不做混凝土碳化试验装",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1133309,"关于明挖扩大基础基坑开挖的说法，错误的是（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"基坑顶缘四周适当距离处应设置截水沟",{"key":24,"text":353,"correct":32},"开挖机械距离基坑边缘应大于0.5m",{"key":27,"text":355,"correct":22},"基坑开挖经过不同土层时，边坡坡度可分层而异，视情况留平台",{"key":30,"text":357,"correct":22},"基坑自开挖起，应尽量连续施工直至基础完成",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},1133311,"在钻孔灌注桩施工中，护筒的作用不包括（）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"起到钻头导向作用",{"key":24,"text":365,"correct":22},"隔离地表水",{"key":27,"text":367,"correct":32},"支护桩壁",{"key":30,"text":369,"correct":22},"固定桩孔位置",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1133313,"钻孔灌注桩施工中，用钻具旋转切削土体钻进，泥浆泵将泥浆压进泥浆笼头，并通过钻杆中心从喷头钻入钻孔内的钻孔方法是（）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"正循环回转钻孔法",{"key":24,"text":377,"correct":22},"反循环回转钻孔法",{"key":27,"text":379,"correct":22},"螺旋钻孔法",{"key":30,"text":381,"correct":22},"冲抓钻孔法",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1133315,"地下连续墙的施工工艺有： ①水下灌注混凝土；②导墙沟槽开挖； ③导墙施工；④槽底清理； ⑤拔接头管；⑥安放接头管； ⑦地连墙沟槽分段开挖； ⑧吊放钢筋笼，下列排序正确的是（）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"②①③⑥⑤⑦⑧④",{"key":24,"text":389,"correct":32},"②③⑦④⑥⑧①⑤",{"key":27,"text":391,"correct":22},"②③⑦④⑧⑥①⑤",{"key":30,"text":393,"correct":22},"⑦②①③④⑥⑦⑤",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1133317,"水中高桩承台宜选用（）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"钢板桩围堰",{"key":24,"text":401,"correct":32},"有底套箱围堰",{"key":27,"text":403,"correct":22},"无底套箱围堰",{"key":30,"text":405,"correct":22},"双壁钢围堰",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1133319,"当承台底层土质为松软土，且能排干水施工时，承台底的正确处理方法是（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"按天然地基上修筑基础的施工方法进行施工",{"key":24,"text":413,"correct":32},"挖除松软土，换填10～30cm厚砂砾土垫层",{"key":27,"text":415,"correct":22},"用静水挖泥方法换填水稳性材料，立模灌注水下混凝土封底",{"key":30,"text":417,"correct":22},"在板桩围堰内填入砂砾至承台底面标高",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":30,"analysis":33},1133323,"在预应力混凝土构件制作的后张法张拉施工中，对预应力筋张拉时，构件混凝土强度应符合设计要求；当设计无要求时，其强度应保证（）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"不应低于极限强度值的80％",{"key":24,"text":425,"correct":22},"不应低于标准强度值的80％",{"key":27,"text":427,"correct":22},"不应低于平均强度等级值的80％",{"key":30,"text":429,"correct":32},"不应低于设计强度等级值的80％",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1133325,"桥梁上部结构悬臂浇筑法施工中，为减少因温度变化而对合龙段混凝土产生拉应力，合龙段混凝土浇筑时间应安排在一天中的（）时段浇筑。",[434,436,438,440],{"key":20,"text":435,"correct":22},"平均气温",{"key":24,"text":437,"correct":22},"最高气温",{"key":27,"text":439,"correct":32},"最低气温",{"key":30,"text":441,"correct":22},"任意",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},1133327,"在浇筑箱梁顶板和翼板混凝土时，为防止混凝土开裂，浇筑顺序应为（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"从内侧向外侧分两次完成",{"key":24,"text":449,"correct":22},"从内侧向外侧一次完成",{"key":27,"text":451,"correct":22},"从外侧向内侧分两次完成",{"key":30,"text":453,"correct":32},"从外侧向内侧一次完成",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},1133329,"桥梁上部结构转体施工工艺包括脱架、撤锚合龙、转动、转盘封固，正确的工艺顺序是（）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"转盘封固→转动→脱架→撤锚合龙",{"key":24,"text":461,"correct":22},"转盘封固→转动→撤锚合龙→脱架",{"key":27,"text":463,"correct":22},"转动→转盘封固→撤锚合龙→脱架",{"key":30,"text":465,"correct":32},"脱架→转动→转盘封固→撤锚合龙",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1133331,"在进行桥梁改扩建设计施工时，下部结构型式应与旧桥下部结构型式协调一致，基本采用（）。",[470,472,474,476],{"key":20,"text":471,"correct":32},"桩柱式桥墩",{"key":24,"text":473,"correct":22},"重力式桥墩",{"key":27,"text":475,"correct":22},"钢筋混凝土薄壁桥墩",{"key":30,"text":477,"correct":22},"悬臂式单向推力墩",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},1133333,"桥梁的监测方式不包括（）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"人工监测",{"key":24,"text":485,"correct":22},"自动监测",{"key":27,"text":487,"correct":22},"联合监测",{"key":30,"text":489,"correct":32},"动态监测",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1133335,"桥梁上部结构逐孔施工通常选用的施工方法是（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"顶推法或现浇法",{"key":24,"text":497,"correct":32},"预制拼装法或现浇法",{"key":27,"text":499,"correct":22},"预制拼装法或顶推法",{"key":30,"text":501,"correct":22},"顶推法或转体施工法",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1133337,"在缆索吊装的拱桥施工中，为了保证拱肋吊装过程的安全和稳定，应在拱肋上设置缆风索。下列关于缆风索设置中说法正确的是（）。",[506,508,510,512],{"key":20,"text":507,"correct":32},"缆风索应对称布置，且上、下游缆风索的长度相差不宜过大",{"key":24,"text":509,"correct":22},"缆风索与拱肋轴线夹角宜大于60°；与地平面夹角宜为45°，距离宜小于100m",{"key":27,"text":511,"correct":22},"缆风索应对称布置，且河的左、右两岸缆风索的长度相差不宜过大",{"key":30,"text":513,"correct":22},"缆风索与拱肋轴线夹角宜小于45°；与地平面夹角宜为30°，距离不宜小于100m",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1133339,"在悬臂浇筑施工中，挂篮组拼后，应全面检查安装质量，并对挂篮进行试压，以消除结构非弹性变形。挂篮试压的最大荷载一般可按（）考虑。",[518,520,522,524],{"key":20,"text":519,"correct":22},"全跨浇筑梁段重量的1.2倍",{"key":24,"text":521,"correct":22},"各悬浇梁段平均重量的1.2倍",{"key":27,"text":523,"correct":32},"最大悬浇梁段重量的1.3倍",{"key":30,"text":525,"correct":22},"各悬浇粱段平均重量的1.3倍",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},1133341,"在峡谷或（）的河段上，或在通航的河流上需要满足船只的顺利通行时可选用缆索吊装施工。",[530,532,534,536],{"key":20,"text":531,"correct":22},"水浅",{"key":24,"text":533,"correct":22},"水流平缓",{"key":27,"text":535,"correct":32},"水深流急",{"key":30,"text":537,"correct":22},"水浅流急",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1133347,"桥梁扩建加宽，新旧桥梁采用上部结构连接而下部结构分离方式时，下列说法错误的是（）。",[542,544,546,548],{"key":20,"text":543,"correct":32},"钢筋混凝土实心板桥，新旧梁板之间拼接宜采用刚性连接",{"key":24,"text":545,"correct":22},"钢筋混凝土空心板桥，新旧梁板之间拼接宜采用铰接连接",{"key":27,"text":547,"correct":22},"预应力混凝土T梁，新旧T梁之间拼接宜采用刚性连接",{"key":30,"text":549,"correct":22},"连续箱梁桥，新旧箱梁之间拼接宜采用铰接连接",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":30,"analysis":33},1133349,"斜拉桥施工监控测试的主要内容不包括（）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"变形",{"key":24,"text":557,"correct":22},"应力",{"key":27,"text":559,"correct":22},"温度",{"key":30,"text":561,"correct":32},"湿度",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1133351,"悬索桥主缆施工的主要工序包括： ①主缆架设； ②猫道架设； ③索夹安装与吊索架设； ④紧缆； ⑤牵引系统施工。其正确的施工工序为（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"①→②→③→④→⑤",{"key":24,"text":569,"correct":32},"⑤→②→①→④→③",{"key":27,"text":571,"correct":22},"②→⑤→④→①→③",{"key":30,"text":573,"correct":22},"⑤→③→①→④→②",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1133354,"拱桥施工中，对于无支架安装拱圈时扣索布置应满足（）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"与所扣挂的拱肋在同一水平面内",{"key":24,"text":581,"correct":32},"与所扣挂的拱肋在同一竖直面内",{"key":27,"text":583,"correct":22},"扣索应布置在拱肋的中部",{"key":30,"text":585,"correct":22},"扣索必须与主塔固结",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1133356,"钻孔灌注桩断桩的防治中，混凝土要求和易性好，坍落度宜控制在（ ）cm。",[590,592,594,596],{"key":20,"text":591,"correct":32},"18～22",{"key":24,"text":593,"correct":22},"20～24",{"key":27,"text":595,"correct":22},"22～26",{"key":30,"text":597,"correct":22},"24～28",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":27,"analysis":33},1133361,"关于桥梁上部结构竖转法施工特点的说法，正确的是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"在桥台处设置转盘，将两岸预制的整垮或半跨转至设计合拢位置",{"key":24,"text":605,"correct":22},"转体重量大，施工中需设置转体平衡重",{"key":27,"text":607,"correct":32},"主要适用于转体重量不大的拱桥",{"key":30,"text":609,"correct":22},"主要针对大跨度拱桥施工，采用锚固体系代替平衡重",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":27,"analysis":33},1133363,"新旧桥基础沉降差应控制在计算值（ ）mm以内，新拓宽桥梁基础宜采用桩基础型式。",[614,616,618,620],{"key":20,"text":615,"correct":22},"3",{"key":24,"text":617,"correct":22},"4",{"key":27,"text":619,"correct":32},"5",{"key":30,"text":621,"correct":22},"6",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]