[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,4,50,1523,[13,34,46,56,68,80,92,104,116,128,140,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,379,391,403,415,427,439,451,463,475,487,497,507,519,531,543,555,567,578,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1133141,1,"单选题","沥青路面基层在整个路面中的主要作用是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","隔水",false,{"key":24,"text":25,"correct":26},"B","承重",true,{"key":28,"text":29,"correct":22},"C","防冻",{"key":31,"text":32,"correct":22},"D","降噪","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1133145,"用大功率路面铣刨拌合机将路面混合料在原路面上就地铣刨、翻挖、破碎，再加入稳定剂、水泥、水（或加入乳化沥青）和骨料同时就地拌合，用路拌机原地拌合，最后碾压成型。该沥青路面的施工工艺是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"厂拌热再生法",{"key":24,"text":41,"correct":22},"现场热再生法",{"key":28,"text":43,"correct":22},"厂拌热冷生法",{"key":31,"text":45,"correct":26},"现场冷再生法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1133147,"适用任何场合和层次、各个等级的路面用沥青是（ ）。",[50,52,54],{"key":20,"text":51,"correct":22},"改性沥青",{"key":24,"text":53,"correct":22},"阳离子乳化沥青",{"key":28,"text":55,"correct":26},"A级道路石油沥青",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":24,"analysis":33},1133149,"一级公路，面层为沥青混凝土AC-16，基层为二灰碎石土，在面层与基层间应设（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"粘层",{"key":24,"text":63,"correct":26},"透层",{"key":28,"text":65,"correct":22},"反滤层",{"key":31,"text":67,"correct":22},"垫层",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":28,"analysis":33},1133151,"不能用作旧沥青混凝土路面现场冷再生胶粘剂是（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"乳化沥青",{"key":24,"text":75,"correct":22},"水泥",{"key":28,"text":77,"correct":26},"石灰",{"key":31,"text":79,"correct":22},"泡沫沥青",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1133157,"水泥混凝土路面的横向施工缝设在缩缝处应采用（）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"设传力杆假缝型",{"key":24,"text":87,"correct":26},"设传力杆平缝型",{"key":28,"text":89,"correct":22},"不设传力杆假缝型",{"key":31,"text":91,"correct":22},"设拉杆企口缝型",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},1133159,"特重、重交通水泥混凝土路面不宜采用（）水泥。",[96,98,100,102],{"key":20,"text":97,"correct":22},"旋窑道路硅酸盐",{"key":24,"text":99,"correct":22},"旋窑硅酸盐",{"key":28,"text":101,"correct":22},"普通硅酸盐",{"key":31,"text":103,"correct":26},"矿渣硅酸盐",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1133161,"下列水泥混凝土路面填缝料中，属于加热施工式填缝料的是（）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"沥青橡胶类",{"key":24,"text":111,"correct":26},"聚氯乙烯胶泥类",{"key":28,"text":113,"correct":22},"硅塑胶类",{"key":31,"text":115,"correct":22},"氯丁橡胶泥类",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1133163,"关于水泥混凝土面层摊铺施工的说法，错误的是（）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"摊铺前应对基层表面进行风干处理，保持基层表面干燥",{"key":24,"text":123,"correct":22},"摊铺过程中，间断时间应不大于混凝土的初凝时间",{"key":28,"text":125,"correct":22},"每日工作结束，施工缝应该设置在胀缝或缩缝处",{"key":31,"text":127,"correct":22},"因机械故障或其他原因中断浇筑时，可设临时工作缝",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1133165,"在下列水泥混凝土面层铺筑方法中，最先进的铺筑方法是（）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"三辊轴机组铺筑",{"key":24,"text":135,"correct":26},"滑模机械铺筑",{"key":28,"text":137,"correct":22},"小型机具铺筑",{"key":31,"text":139,"correct":22},"碾压混凝土",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1133167,"进行中央分隔带的开挖一般是紧随（）工作。",[144,146,148,150],{"key":20,"text":145,"correct":26},"路面基层施工完毕后",{"key":24,"text":147,"correct":22},"路面底基层施工完毕后",{"key":28,"text":149,"correct":22},"路基施工完毕后",{"key":31,"text":151,"correct":22},"路面面层施工完毕后",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},1133169,"培土路肩施工流程为：备料→推平→平整→X→Y→平整→碾压，其中X、Y工序分别是（）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"回填、切边",{"key":24,"text":159,"correct":22},"切边、回填",{"key":28,"text":161,"correct":26},"静压、切边",{"key":31,"text":163,"correct":22},"切边、静压",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":28,"analysis":33},1133171,"关于路肩施工，说法错误的是（）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"对填方路段来说，采用培土路肩的方法施工既经济又简便",{"key":24,"text":171,"correct":22},"填方路段培土路肩的材料，通常与填筑路堤的材料相同",{"key":28,"text":173,"correct":26},"挖方路堑段的路肩开挖时，先开挖到路床顶面标高，再采用培路肩的方法施工",{"key":31,"text":175,"correct":22},"填方路段路肩通常随着路面结构层的铺筑，相应地分层培筑，可以先培土也可以后培土",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1133173,"下列措施中，可防止水泥稳定土基层裂缝的是（）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"采用塑性指数较高的土",{"key":24,"text":183,"correct":26},"养生结束后应及时铺筑下封层",{"key":28,"text":185,"correct":22},"采用快凝水泥",{"key":31,"text":187,"correct":22},"采用较高的水泥用量",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},1133175,"水泥混凝土路面浇筑后，表面没有及时覆盖，在炎热或大风天气，表面游离水蒸发过快，体积急剧收缩，最容易产生的病害是（）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"断板",{"key":24,"text":195,"correct":22},"板底脱空",{"key":28,"text":197,"correct":26},"龟裂",{"key":31,"text":199,"correct":22},"唧泥",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1133177,"在无机结合料稳定基层（底基层）混合料生产、摊铺及碾压的一般规定中，稳定材料层宽11～12m时，每一流水作业段长度以（ ）m为宜。",[204,206,208,210],{"key":20,"text":205,"correct":22},"100",{"key":24,"text":207,"correct":22},"200",{"key":28,"text":209,"correct":22},"300",{"key":31,"text":211,"correct":26},"500",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1133179,"路面基层采用级配碎石施工时，基层压实度应不小于（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"大于98%",{"key":24,"text":219,"correct":26},"小于99%",{"key":28,"text":221,"correct":22},"大于97%",{"key":31,"text":223,"correct":22},"小于96%",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},1133181,"沥青贯入式路面的施工工序代码如下：①撒布主层集料；②浇洒第一层沥青；③采用6～8t钢轮压路机碾压；④撒布第一层嵌缝料；⑤采用8～12t钢轮压路机碾压。上述5道工序正确的施工顺序是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"②→①→④→③→⑤",{"key":24,"text":231,"correct":22},"②→①→③→④→⑤",{"key":28,"text":233,"correct":26},"①→③→②→④→⑤",{"key":31,"text":235,"correct":22},"①→⑤→②→④→③",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},1133183,"热拌沥青碎石基层施工时，热拌沥青混合料的压实后应符合压实度和平整度的要求，沥青混合料的分层压实厚度应不得大于（ ）cm。",[240,242,244,246],{"key":20,"text":241,"correct":22},"8",{"key":24,"text":243,"correct":22},"9",{"key":28,"text":245,"correct":26},"10",{"key":31,"text":247,"correct":22},"12",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1133185,"关于填隙碎石基层施工的说法，错误的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":26},"填隙碎石的施工工艺中，撒布填隙料应在初压之前进行",{"key":24,"text":255,"correct":22},"骨料可以用强度合格的各种岩石轧制而成",{"key":28,"text":257,"correct":22},"骨料可以用稳定的矿渣轧制而成",{"key":31,"text":259,"correct":22},"填隙料宜采用石屑，缺乏石屑地区，可添加细砾砂或粗砂等细集料",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1133187,"填隙碎石底基层，拟采用干法施工，为使摊铺好的骨料稳定就位，初压时宜选用的压路机为（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"两轮压路机",{"key":24,"text":267,"correct":22},"三轮压路机",{"key":28,"text":269,"correct":22},"羊足碾",{"key":31,"text":271,"correct":22},"胶轮压路机",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":28,"analysis":33},1133189,"填隙碎石施工备料时，填隙料的用量约为骨料（ ）的（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"质量，20%～30%",{"key":24,"text":279,"correct":22},"体积，20%～30%",{"key":28,"text":281,"correct":26},"质量，30%～40%",{"key":31,"text":283,"correct":22},"体积，30%～40%",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1133191,"高速公路的无机结合料基层施工中，细集料中小于0.075mm的颗粒含量应不大于（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"10%",{"key":24,"text":291,"correct":26},"15%",{"key":28,"text":293,"correct":22},"20%",{"key":31,"text":295,"correct":22},"30%",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1133193,"填隙碎石用作基层时，骨料的（ ）应不大于53mm。",[300,302,304,306],{"key":20,"text":301,"correct":22},"最大粒径",{"key":24,"text":303,"correct":22},"平均粒径",{"key":28,"text":305,"correct":26},"公称最大粒径",{"key":31,"text":307,"correct":22},"公称平均粒径",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},1133196,"沥青表面处治通常采用（）施工。",[312,314,316,318],{"key":20,"text":313,"correct":22},"场拌法",{"key":24,"text":315,"correct":22},"平行作业法",{"key":28,"text":317,"correct":26},"层铺法",{"key":31,"text":319,"correct":22},"中心站法",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1133198,"滑模摊铺高速公路、一级公路水泥混凝土路面时，应采用（）",[324,326,328,330],{"key":20,"text":325,"correct":26},"单向坡双线基准线",{"key":24,"text":327,"correct":22},"单向坡单线基准线",{"key":28,"text":329,"correct":22},"双向坡双线基准线",{"key":31,"text":331,"correct":22},"双向坡单线基准线",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1133200,"无机结合料基层路拌法施工中关于接缝的处理，下列叙述中错误的是（）",[336,338,340,342],{"key":20,"text":337,"correct":22},"同日施工的两工作段衔接处应采用搭接",{"key":24,"text":339,"correct":22},"应该避免纵向接缝",{"key":28,"text":341,"correct":22},"纵缝必须垂直相接",{"key":31,"text":343,"correct":26},"纵缝可以垂直相接也可以斜接",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1133201,"下列情况中应浇洒透层沥青的是（）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"沥青路面的级配砂砾、级配碎石基层",{"key":24,"text":351,"correct":22},"旧沥青路面层上加铺沥青层",{"key":28,"text":353,"correct":22},"水泥混凝土路面上铺筑沥青面层",{"key":31,"text":355,"correct":22},"沥青碎石混合料基层",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1133203,"培土路肩的施工流程正确的是（）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"备料→平整→静压→推平→切边→平整→碾压",{"key":24,"text":363,"correct":22},"备料→平整→静压→推平→碾压→切边→平整",{"key":28,"text":365,"correct":26},"备料→推平→平整→静压→切边→平整→碾压",{"key":31,"text":367,"correct":22},"备料→推平→静压→平整→碾压→平整→切边",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1133205,"关于填隙碎石基层施工的说法错误的是（）",[372,373,375,377],{"key":20,"text":253,"correct":26},{"key":24,"text":374,"correct":22},"粗碎石可以用强度合格的各种岩石轧制而成",{"key":28,"text":376,"correct":22},"粗碎石可以用稳定的矿渣轧制而成",{"key":31,"text":378,"correct":22},"填隙料可以采用石屑或最大粒径小于10mm的砂砾料或粗砂",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1133207,"下列路面结构层中，属于柔性基层的是（）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"水泥稳定碎石基层",{"key":24,"text":386,"correct":26},"贯入式沥青碎石基层",{"key":28,"text":388,"correct":22},"二灰碎石基层",{"key":31,"text":390,"correct":22},"石灰稳定土基层",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},1133209,"适用滑模摊铺机进行水泥混凝土路面施工的路段是（）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"纵坡大于5%的上坡路段",{"key":24,"text":398,"correct":22},"纵坡大于6%的下坡路段",{"key":28,"text":400,"correct":26},"平面半径为50m～100m的平曲线路段",{"key":31,"text":402,"correct":22},"超高横坡大于7%的路段",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1133211,"属于路面基层粒料类级配型是（）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"填隙碎石",{"key":24,"text":410,"correct":22},"天然砾石轧制成碎石",{"key":28,"text":412,"correct":22},"天然砾石",{"key":31,"text":414,"correct":26},"符合级配的天然砂砾",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1133213,"下列沥青路面面层施工接缝处理的做法，错误的是（）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"半幅施工不能采用热接缝时，采用人工顺直刨缝或切缝",{"key":24,"text":422,"correct":22},"半幅施工铺另半幅前必须将边缘清扫干净，并涂洒少量粘层沥青",{"key":28,"text":424,"correct":26},"横接缝首先用3m直尺检查端部平整度，不符合要求时，按45°斜交于路中线切齐清除",{"key":31,"text":426,"correct":22},"纵向冷接缝上、下层的缝错开15cm以上，横向接缝错开1m以上",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1133215,"公路无机结合料稳定碎石基层施工中，其拌和工艺和摊铺工艺推荐采用（）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"集中厂拌和摊铺机摊铺",{"key":24,"text":434,"correct":22},"人工路拌和摊铺机摊铺",{"key":28,"text":436,"correct":22},"人工路拌和推土机摊铺",{"key":31,"text":438,"correct":22},"集中厂拌和推土机摊铺",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1133217,"按矿料级配分类，属于开级配沥青混合料的是（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"SMA",{"key":24,"text":446,"correct":22},"AM",{"key":28,"text":448,"correct":22},"AC-16",{"key":31,"text":450,"correct":26},"OGFC",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1133219,"在路拌法水泥稳定土基层施工中，主要工艺流程有：①准备下承层；②洒水闷料；③拌合；④整形；⑤碾压；⑥养生。如下选项中排序正确的是（）",[455,457,459,461],{"key":20,"text":456,"correct":26},"①②③④⑤⑥",{"key":24,"text":458,"correct":22},"②①③④⑤⑥",{"key":28,"text":460,"correct":22},"①②④③⑤⑥",{"key":31,"text":462,"correct":22},"①③②④⑤⑥",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1133221,"用于二级及二级以上公路基层和底基层的级配碎石或砾石，应由不少于（）种规格的材料掺配而成。",[467,469,471,473],{"key":20,"text":468,"correct":22},"1",{"key":24,"text":470,"correct":22},"2",{"key":28,"text":472,"correct":22},"3",{"key":31,"text":474,"correct":26},"4",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1133223,"采用小型机具进行水泥混凝土路面施工时，采用振捣棒对混凝土振捣时，振捣棒的移动间距不宜大于（ ）mm，至模板边缘的距离不宜大于（ ）mm。",[479,481,483,485],{"key":20,"text":480,"correct":22},"400，200",{"key":24,"text":482,"correct":22},"500，300",{"key":28,"text":484,"correct":22},"400，300",{"key":31,"text":486,"correct":26},"500，200",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1133225,"沥青混凝土路面封层施工时，稀浆封层两幅纵缝搭接的宽度不宜超过（ ）cm。",[491,493,494,495],{"key":20,"text":492,"correct":22},"5",{"key":24,"text":241,"correct":26},{"key":28,"text":245,"correct":22},{"key":31,"text":496,"correct":22},"15",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},1133227,"下列基层中，不属于半刚性基层的是（ ）。",[501,503,504,506],{"key":20,"text":502,"correct":22},"二灰稳定土基层",{"key":24,"text":390,"correct":22},{"key":28,"text":505,"correct":26},"沥青碎石基层",{"key":31,"text":384,"correct":22},{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},1133229,"沥青路面用料中的集料粒径规格以（ ）为准。",[511,513,515,517],{"key":20,"text":512,"correct":26},"方孔筛",{"key":24,"text":514,"correct":22},"圆孔筛",{"key":28,"text":516,"correct":22},"三角形筛",{"key":31,"text":518,"correct":22},"菱形筛",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},1133231,"热拌沥青混凝土路面施工时，当混合料出厂温度过高时应（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":26},"废弃",{"key":24,"text":526,"correct":22},"重新加热再摊铺",{"key":28,"text":528,"correct":22},"按正常的混合料摊铺",{"key":31,"text":530,"correct":22},"较高温度的沥青混合料混合后再摊铺",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1133233,"对于水泥混凝土路面，符合设置纵向缩缝的情形是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"当一次铺筑宽度小于路面和硬路肩总宽度时",{"key":24,"text":538,"correct":26},"当一次铺筑宽度大于4.5m时",{"key":28,"text":540,"correct":22},"每天摊铺结束或摊铺中断时间超过30min时",{"key":31,"text":542,"correct":22},"当一次铺筑宽度大于4.0m时",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1133235,"级配碎石细集料的塑性指数大于规范要求时，处理措施错误的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"掺配石灰",{"key":24,"text":550,"correct":26},"掺配黏土",{"key":28,"text":552,"correct":22},"掺配无塑性的砂",{"key":31,"text":554,"correct":22},"掺配无塑性的石屑",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},1133236,"沥青玛蹄脂碎石混合料属于（ ）结构。",[559,561,563,565],{"key":20,"text":560,"correct":22},"密实-悬浮",{"key":24,"text":562,"correct":26},"密实-骨架",{"key":28,"text":564,"correct":22},"骨架-空隙",{"key":31,"text":566,"correct":22},"骨架-悬浮",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},1133238,"沥青路面结构层中，（ ）起排水、隔水、防冻、防污等作用。",[571,573,575,577],{"key":20,"text":572,"correct":22},"面层",{"key":24,"text":574,"correct":22},"基层",{"key":28,"text":576,"correct":22},"路床",{"key":31,"text":67,"correct":26},{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1133240,"下列基层中，属于嵌锁型粒料基层的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":26},"泥结碎石基层",{"key":24,"text":585,"correct":22},"级配碎石基层",{"key":28,"text":587,"correct":22},"石灰稳定砂砾基层",{"key":31,"text":388,"correct":22},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},1133242,"关于热拌沥青混凝土混合料压实的说法，错误的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"碾压分为初压.复压和终压",{"key":24,"text":596,"correct":22},"为保证沥青混合料碾压过程中不粘轮，可以采用雾状喷水法喷水碾压",{"key":28,"text":598,"correct":26},"初压时采用振动压路机振压1～2遍",{"key":31,"text":600,"correct":22},"碾压进行中，压路机不得中途停留.转向",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":24,"analysis":33},1133244,"横向缩缝的切缝方式的选用，应由施工期间该地区路面摊铺完毕到切缝时的（）确定",[605,607,609,611],{"key":20,"text":606,"correct":22},"施工时间",{"key":24,"text":608,"correct":26},"昼夜温差",{"key":28,"text":610,"correct":22},"施工气候",{"key":31,"text":612,"correct":22},"施工机具",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]