[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":744},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,30,50,1523,[13,38,53,68,83,98,112,127,141,156,170,184,199,214,229,244,258,272,287,302,316,331,346,361,375,389,404,418,432,446,460,474,488,503,517,531,545,560,575,589,603,617,631,645,659,673,687,702,716,730],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1135248,2,"多选题","（2020年真题）关于分包合同管理正确的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","发包人对分包合同的管理主要表现为对分包工程的批准",true,{"key":24,"text":25,"correct":26},"B","监理工程师对承包人和分包人均有监理与被监理的关系",false,{"key":28,"text":29,"correct":22},"C","承包人对分包人具有全面管理责任",{"key":31,"text":32,"correct":26},"D","特殊情况下发包人可以向分包人直接付款",{"key":34,"text":35,"correct":26},"E","分包人可以按责任划分向承包人和监理工程师提出索赔要求","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1135249,"（2019年真题）材料预算价包括（ ）",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"材料原价",{"key":24,"text":45,"correct":22},"运杂费",{"key":28,"text":47,"correct":26},"场内、外运输损耗",{"key":31,"text":49,"correct":22},"采购及保管费",{"key":34,"text":51,"correct":26},"操作性磨损","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1135250,"（2020年真题）根据《公路工程建设项目概算预算编制办法》，属于施工场地建设费的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"场区平整、场地硬化",{"key":24,"text":60,"correct":22},"场区范围内临时用水支管修建费",{"key":28,"text":62,"correct":26},"红线范围内进出场临时便道修建费",{"key":31,"text":64,"correct":22},"工地实验室所发生的属于固定资产的试验设备租赁费",{"key":34,"text":66,"correct":22},"施工扬尘污染防治措施费","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1135251,"根据《公路工程施工安全技术规范》，需要编制专项施工方案的大型临时工程有（）。2018真题",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"围堰工程",{"key":24,"text":75,"correct":26},"施工便道",{"key":28,"text":77,"correct":22},"挂篮",{"key":31,"text":79,"correct":22},"便桥",{"key":34,"text":81,"correct":22},"水上作业平台","ACDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1135252,"根据《公路工程标准施工招标文件》（2009 年版）合同文件范本，关于计量支付管理的说法，错误的有（ ）。2013年",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"承包人应对已完成的分项工程向业主申请质量认证",{"key":24,"text":90,"correct":26},"承包人应在协议约定的时间内向监理工程师申请计量",{"key":28,"text":92,"correct":26},"监理工程师应对实际完成的工程量进行计量，并签发计量证书给承包人",{"key":31,"text":94,"correct":22},"承包人可凭质量认证和计量证书向业主提出付款申请",{"key":34,"text":96,"correct":22},"应向监理工程师复核申报资料，确定支付款项，并批准向承包人付款","ADE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1135253,"关于施工标准化与安全措施费的说法，正确的有（ ）。2014年",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"指工程施工期间为满足安全生产、施工标准化、规模化、精细化所发生的费用",{"key":24,"text":105,"correct":26},"该费用包括施工期间为保证交通安全而设置的临时安全设施的标志、标牌的费用",{"key":28,"text":107,"correct":22},"该费用不包括预制场、拌合站、临时便道、临时便桥的施工标准化费用",{"key":31,"text":109,"correct":26},"该费用以各类工程的直接费之和为计算基数",{"key":34,"text":111,"correct":26},"作为规费的组成部分，其费率由交通主管部门统一发布",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1135254,"材料的预算价格包括（ ）。2012年",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"材料原价与运杂费",{"key":24,"text":119,"correct":26},"场内运输损耗",{"key":28,"text":121,"correct":22},"采购及仓库保管费",{"key":31,"text":123,"correct":26},"场内二次倒运费",{"key":34,"text":125,"correct":22},"场外运输损耗","ACE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":52,"analysis":37},1135255,"关于拌和水站水泥混凝土拌和设备的要求，正确的有（ ）。2014年",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"拌和设备应采用质量自动计量设备",{"key":24,"text":134,"correct":22},"减水剂应采用全自动电子称量设备",{"key":28,"text":136,"correct":26},"拌和用水应采用流量计计量",{"key":31,"text":138,"correct":22},"混凝土拌和应采用强制式拌和机",{"key":34,"text":140,"correct":26},"缓凝剂应采用流量计计量",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1135256,"关于项目部驻地选址的说法，正确的有（ ）2016年",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"可设在靠近项目现场的中间位置",{"key":24,"text":148,"correct":26},"可设在独立大桥下",{"key":28,"text":150,"correct":26},"应设在离集中爆破区300m 以外",{"key":31,"text":152,"correct":26},"可设在互通匝道区",{"key":34,"text":154,"correct":22},"应设在周围无高频、高压电源的位置","AE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":52,"analysis":37},1135257,"（2019年真题）项目部驻地建设说法正确的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"自建房屋最低标准为活动板房",{"key":24,"text":163,"correct":22},"宜为独立式庭院，四周设有围墙，有固定出入口",{"key":28,"text":165,"correct":26},"离集中爆破区300m以外",{"key":31,"text":167,"correct":22},"在适当位置设置临时室外消防水池和消防砂池",{"key":34,"text":169,"correct":26},"项目部驻地办公用房总面积不得低于120㎡",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":126,"analysis":37},1135258,"不适用于卵石、漂石地质条件下灌注桩钻孔施工的机械有（ ）。2015年",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"螺旋钻机",{"key":24,"text":177,"correct":26},"冲击钻机",{"key":28,"text":179,"correct":22},"旋挖钻机",{"key":31,"text":181,"correct":26},"回转斗钻机",{"key":34,"text":183,"correct":22},"地质钻机",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1135259,"可用于中线放样的仪器有（ ）。2012年",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"GPS 测量仪",{"key":24,"text":191,"correct":22},"全站仪",{"key":28,"text":193,"correct":26},"水准仪",{"key":31,"text":195,"correct":26},"罗盘仪",{"key":34,"text":197,"correct":26},"手持红外仪","AB",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1135260,"拟作为路堤填料的材料应取样，土的试验项目有（）。2018真题",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"液限",{"key":24,"text":206,"correct":22},"塑限",{"key":28,"text":208,"correct":22},"CBR值",{"key":31,"text":210,"correct":26},"弯沉",{"key":34,"text":212,"correct":22},"天然含水率","ABCE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1135261,"适用于较大、较深地基陷穴的处理方法有（）。2015年",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"灌砂法",{"key":24,"text":221,"correct":22},"开挖回填夯实法",{"key":28,"text":223,"correct":26},"灌浆法",{"key":31,"text":225,"correct":22},"导洞和竖井回填夯实法",{"key":34,"text":227,"correct":26},"真空预压法","BD",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},1135262,"关于滑坡地段路基施工技术要点的说法，正确的有（）。2013年",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"迅速排除地面汇水及地下水",{"key":24,"text":236,"correct":22},"减轻滑体上作业机械重力、土体重力和振动",{"key":28,"text":238,"correct":22},"在干旱季节内尽快完成滑坡地带的施工",{"key":31,"text":240,"correct":26},"牵引式滑坡处治宜采用滑坡减重法",{"key":34,"text":242,"correct":26},"具有膨胀土性质的滑坡处治宜采用滑坡减重法","ABC",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":97,"analysis":37},1135263,"排除滑坡地段地表水的方法有（ ）。2014年",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"设置环形截水沟",{"key":24,"text":251,"correct":26},"设置支撑渗沟",{"key":28,"text":253,"correct":26},"设置平孔",{"key":31,"text":255,"correct":22},"设置树枝状排水沟",{"key":34,"text":257,"correct":22},"平整夯实滑坡体表面的土层，形成排水顺坡",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":67,"analysis":37},1135264,"粉煤灰路堤的组成包括（ ）。2017真题",[262,264,266,268,270],{"key":20,"text":263,"correct":22},"路堤主体部分",{"key":24,"text":265,"correct":22},"封顶层",{"key":28,"text":267,"correct":26},"透水层",{"key":31,"text":269,"correct":22},"隔离层",{"key":34,"text":271,"correct":22},"排水系统",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1135265,"路基施工中，深孔爆破的判断依据有（）。2016年",[276,278,280,282,284],{"key":20,"text":277,"correct":26},"炮孔成水平或略有倾斜",{"key":24,"text":279,"correct":22},"孔径大于 75mm",{"key":28,"text":281,"correct":22},"深度在 5m以上",{"key":31,"text":283,"correct":22},"采用延长药包",{"key":34,"text":285,"correct":26},"采用一次烘膛","BCD",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},1135266,"导致水泥混凝土路面产生横向裂缝的原因包括（ ）。2012年",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"选用了干缩性较小的普通硅酸盐水泥",{"key":24,"text":294,"correct":22},"混凝土路面面板板厚不足",{"key":28,"text":296,"correct":26},"切缝深度过深",{"key":31,"text":298,"correct":22},"养护不及时",{"key":34,"text":300,"correct":22},"切缝不及时","BDE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":67,"analysis":37},1135267,"关于路基冬期施工说法，正确的有（）2016年",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"冬期填筑的路堤，每层每侧应超填并压实",{"key":24,"text":309,"correct":22},"挖填方交界处，填土低于 1m的路堤都不应在冬期填筑",{"key":28,"text":311,"correct":26},"当路基填至路床底面时，应碾压密实后停止填筑",{"key":31,"text":313,"correct":22},"当天填的土必须当天完成碾压",{"key":34,"text":315,"correct":22},"挖方边坡不应一次挖到设计线",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":330,"analysis":37},1135268,"为检查、维修渗沟，宜设置检查井的地点有（ ）。2014年",[320,322,324,326,328],{"key":20,"text":321,"correct":26},"路线平曲线交点处",{"key":24,"text":323,"correct":22},"渗沟平面转折处",{"key":28,"text":325,"correct":22},"渗沟纵坡由陡变缓处",{"key":31,"text":327,"correct":26},"路线凸型竖曲线处",{"key":34,"text":329,"correct":26},"渗沟纵坡维修渗沟坡由缓变陡处","BC",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":345,"analysis":37},1135269,"路基边坡病害包括（ ）。2012年",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"表层溜塌",{"key":24,"text":338,"correct":22},"崩塌",{"key":28,"text":340,"correct":22},"滑坡",{"key":31,"text":342,"correct":22},"落石",{"key":34,"text":344,"correct":26},"反射裂缝","ABCD",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":360,"analysis":37},1135270,"（2019年真题）填石路基不得采用的填料是（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":22},"膨胀岩石",{"key":24,"text":353,"correct":22},"易溶性岩石",{"key":28,"text":355,"correct":26},"中、硬岩石",{"key":31,"text":357,"correct":26},"软岩",{"key":34,"text":359,"correct":22},"盐化岩石","ABE",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":345,"analysis":37},1135271,"（2020年真题）路堤实验路段施工总结的内容包括（ ）。",[365,367,369,371,373],{"key":20,"text":366,"correct":22},"过程工艺控制",{"key":24,"text":368,"correct":22},"安全保证措施",{"key":28,"text":370,"correct":22},"环保措施",{"key":31,"text":372,"correct":22},"质量控制标准",{"key":34,"text":374,"correct":26},"对初步设计文件的修改建议",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":155,"analysis":37},1135272,"（2020年真题）抗滑桩桩孔施工中，应监测（ ）",[379,381,383,385,387],{"key":20,"text":380,"correct":22},"地下水位",{"key":24,"text":382,"correct":26},"地表水流量",{"key":28,"text":384,"correct":26},"桩身变形",{"key":31,"text":386,"correct":26},"土石比例",{"key":34,"text":388,"correct":22},"滑坡体位移和变形",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":403,"analysis":37},1135273,"能有效防治水泥稳定土基层裂缝的措施有（ ）。2017真题",[393,395,397,399,401],{"key":20,"text":394,"correct":26},"采用塑性指数较高的土",{"key":24,"text":396,"correct":22},"控制压实含水量，根据土的性质采用最佳含水量",{"key":28,"text":398,"correct":26},"在保证水泥稳定土强度的前提下，尽可能增加水泥用量",{"key":31,"text":400,"correct":26},"一次成型，尽可能采用快凝水泥",{"key":34,"text":402,"correct":22},"加强对水泥稳定土的养护，避免水分挥发过大","BE",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":67,"analysis":37},1135274,"煤矸石、高炉矿渣、钢渣用于修筑基层或底基层之前应崩解稳定，为评价混合料性能，宜采用的试验有（ ）2016年",[408,410,412,414,416],{"key":20,"text":409,"correct":22},"强度试验",{"key":24,"text":411,"correct":22},"模量试验",{"key":28,"text":413,"correct":26},"级配试验",{"key":31,"text":415,"correct":22},"温度收缩试验",{"key":34,"text":417,"correct":22},"干湿收缩试验",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":301,"analysis":37},1135275,"关于乳化沥青碎石基层施工的说法，正确的有（ ）。2012年",[422,424,426,428,430],{"key":20,"text":423,"correct":26},"乳化沥青碎石混合料必须采用拌和机拌和",{"key":24,"text":425,"correct":22},"混合料的拌和、运输、摊铺应在乳液破乳之前结束",{"key":28,"text":427,"correct":26},"乳化沥青破乳之前，应完成所有碾压工作",{"key":31,"text":429,"correct":22},"拌和过程中已发生破乳的混合料，应予废弃",{"key":34,"text":431,"correct":22},"施工过程中遇雨应停止铺筑，以防止雨水将乳液冲走",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":67,"analysis":37},1135276,"水泥稳定碎石基层施工，确定每日施工作业长度，宜综合考虑的因素有（）。2018真题",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"施工机械的生产效率和数量",{"key":24,"text":439,"correct":22},"施工人员数量及操作熟练程度",{"key":28,"text":441,"correct":26},"增加施工接缝的数量",{"key":31,"text":443,"correct":22},"施工季节和气候条件",{"key":34,"text":445,"correct":22},"水泥的初凝时间和延迟时间",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":126,"analysis":37},1135277,"关于沥青碎石路面的说法，正确的是（ ）。2014年",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"冬季不易产生冻缩裂缝",{"key":24,"text":453,"correct":26},"沥青用量多，且需要添加矿粉",{"key":28,"text":455,"correct":22},"孔隙率较大，路面容易渗水和老化",{"key":31,"text":457,"correct":26},"热拌沥青碎石可用于高速公路面层",{"key":34,"text":459,"correct":22},"高温稳定性好，路面不易产生波浪",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":228,"analysis":37},1135278,"关于沥青表面处治路面的说法，正确的有（ ）。2012年",[464,466,468,470,472],{"key":20,"text":465,"correct":26},"沥青表面处治路面的使用寿命一般比沥青贯入式路面更长",{"key":24,"text":467,"correct":22},"沥青表面处治主要是对非沥青承重层起保护和防磨耗作用",{"key":28,"text":469,"correct":26},"可用于高速公路路面面层",{"key":31,"text":471,"correct":22},"可分为单层式、双层式和三层式",{"key":34,"text":473,"correct":26},"设计时一般要考虑沥青表面处治层的承重强度",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":286,"analysis":37},1135279,"关于水泥稳定土基层路拌法的说法，正确的有（ ）。2014年",[478,480,482,484,486],{"key":20,"text":479,"correct":26},"摊铺土之前只需通过计算确定土的松铺系数",{"key":24,"text":481,"correct":22},"摊铺土应在摊铺水泥前一天进行",{"key":28,"text":483,"correct":22},"如已整平的土含水量过小，应在土层上洒水闷料",{"key":31,"text":485,"correct":22},"细粒土应经一夜闷料",{"key":34,"text":487,"correct":26},"对于二级公路，土与水泥的干拌可采用农用旋转耕作机与平地机配合进行",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":502,"analysis":37},1135280,"下列结构层中，级配碎石在满足最大粒径要求时可以用未筛分碎石和石屑组配而成的有（ ）。2015年",[492,494,496,498,500],{"key":20,"text":493,"correct":26},"高速公路底基层",{"key":24,"text":495,"correct":26},"二级公路基层",{"key":28,"text":497,"correct":22},"三级公路基层",{"key":31,"text":499,"correct":26},"二级公路底基层",{"key":34,"text":501,"correct":22},"三级公路底基层","CE",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":403,"analysis":37},1135281,"高速公路沥青混凝土路面的下封层一般宜采用的施工方法有（ ）。2015年",[507,509,511,513,515],{"key":20,"text":508,"correct":26},"挤密法",{"key":24,"text":510,"correct":22},"层铺法",{"key":28,"text":512,"correct":26},"人工喷洒法",{"key":31,"text":514,"correct":26},"沥青贯入法",{"key":34,"text":516,"correct":22},"稀浆封层法",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":52,"analysis":37},1135282,"（2019年真题）填方路肩施工说法正确的是（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"培路肩的方法施工既经济又简便",{"key":24,"text":524,"correct":22},"土路肩通常随着路面结构层的铺筑，相应地分层培筑",{"key":28,"text":526,"correct":26},"先培更优于后培",{"key":31,"text":528,"correct":22},"培土路肩的材料，通常与填筑路堤的材料相同",{"key":34,"text":530,"correct":26},"后培路肩的缺点是，横断面上易形成一个三角区",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":82,"analysis":37},1135283,"（2019年真题）滑模摊铺机摊铺速度应根据（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"板厚",{"key":24,"text":538,"correct":26},"碾压能力",{"key":28,"text":540,"correct":22},"布料能力",{"key":31,"text":542,"correct":22},"振捣混凝土排气效果",{"key":34,"text":544,"correct":22},"混凝土工作性能",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":559,"analysis":37},1135284,"（2020年真题）路面垫层结构的作用包括（ ）",[549,551,553,555,557],{"key":20,"text":550,"correct":26},"粘结",{"key":24,"text":552,"correct":22},"排水",{"key":28,"text":554,"correct":22},"隔水",{"key":31,"text":556,"correct":22},"防污",{"key":34,"text":558,"correct":22},"防冻","BCDE",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":574,"analysis":37},1135285,"（2020年真题）现场冷再生中关键技术包括（ ）",[564,566,568,570,572],{"key":20,"text":565,"correct":22},"添加的胶粘剂与旧混合料的均匀拌合技术",{"key":24,"text":567,"correct":26},"旧沥青混合料的环保弃置技术",{"key":28,"text":569,"correct":22},"旧沥青混合料的铣刨、破碎技术",{"key":31,"text":571,"correct":22},"胶粘剂配比性能",{"key":34,"text":573,"correct":26},"旧沥青混合料的经济运输技术","ACD",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":36,"analysis":37},1135286,"下列桥梁设计计算荷载中，属于偶然作用的有（ ）2016年",[579,581,583,585,587],{"key":20,"text":580,"correct":22},"船舶的撞击作用",{"key":24,"text":582,"correct":26},"汽车制动力",{"key":28,"text":584,"correct":22},"汽车撞击作用",{"key":31,"text":586,"correct":26},"地震作用",{"key":34,"text":588,"correct":26},"冰压力",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":198,"analysis":37},1135287,"关于钢筋混凝土梁桥预拱度偏差防治措施的说法，正确的有（ ）。2014年",[593,595,597,599,601],{"key":20,"text":594,"correct":22},"提高现浇梁支架及模板的施工质量",{"key":24,"text":596,"correct":22},"对预制梁还需控制混凝土的弹性模量",{"key":28,"text":598,"correct":26},"控制张拉的混凝土试块采用标准条件养护",{"key":31,"text":600,"correct":26},"钢绞线伸长值的计算应采用供货商提供的弹性模量值",{"key":34,"text":602,"correct":26},"预制梁应尽量延长存梁时间",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":243,"analysis":37},1135288,"桥面铺装病害形成的原因有（ ）。2013年",[607,609,611,613,615],{"key":20,"text":608,"correct":22},"梁体预拱度过大，桥面铺装设计厚度难以调整施工允许误差",{"key":24,"text":610,"correct":22},"桥头跳车和伸缩缝破坏引起连锁破坏",{"key":28,"text":612,"correct":22},"铺装防水层破损",{"key":31,"text":614,"correct":26},"桥台后填筑采用砂石料作为填料",{"key":34,"text":616,"correct":26},"桥面排水系统堵塞",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":559,"analysis":37},1135289,"桥梁施工模板、支架设计计算中，应考虑的荷载包括（ ）。2012年",[621,623,625,627,629],{"key":20,"text":622,"correct":26},"汽车荷载",{"key":24,"text":624,"correct":22},"模板、支架及施工人员、材料、机具的重量",{"key":28,"text":626,"correct":22},"新浇筑混凝土对侧模板的压力",{"key":31,"text":628,"correct":22},"倾倒混凝土时产生的水平荷载",{"key":34,"text":630,"correct":22},"可能产生的雪荷载、冬季保温设施荷载",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":97,"analysis":37},1135290,"冷拔低碳钢丝进场验收时，除应对质量说明书、包装、标志等进行检查外，还应逐盘进行（ ）试验。2013年",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"抗拉强度",{"key":24,"text":638,"correct":26},"抗压强度",{"key":28,"text":640,"correct":26},"抗扭强度",{"key":31,"text":642,"correct":22},"伸长率",{"key":34,"text":644,"correct":22},"弯曲",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":97,"analysis":37},1135291,"地下连续墙按成墙方式分为（ ）。2015年",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"组合式",{"key":24,"text":652,"correct":26},"抓斗式",{"key":28,"text":654,"correct":26},"回转式",{"key":31,"text":656,"correct":22},"壁板式",{"key":34,"text":658,"correct":22},"桩排式",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":97,"analysis":37},1135292,"关于地下连续墙的说法，正确的有（ ）。2017真题",[663,665,667,669,671],{"key":20,"text":664,"correct":22},"墙体刚度大",{"key":24,"text":666,"correct":26},"不能承受竖向荷载",{"key":28,"text":668,"correct":26},"不可作为永久性结构",{"key":31,"text":670,"correct":22},"可作为施工过程中的防护结构",{"key":34,"text":672,"correct":22},"施工中需采用膨润土泥浆护壁",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":574,"analysis":37},1135293,"关于桥梁混凝土施工的说法，正确的有（ ）。2014年",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"大体积混凝土最大胶凝材料总量不宜超过350kg\u002Fm3",{"key":24,"text":680,"correct":26},"钢筋混凝土结构应优先选用氯盐类混凝土外加剂",{"key":28,"text":682,"correct":22},"混凝土抗压强度评定试件应采用标准条件养护",{"key":31,"text":684,"correct":22},"应在搅拌地点与浇筑地点分别取样检测混凝土拌和物的坍落度",{"key":34,"text":686,"correct":26},"泵送混凝土试配的坍落度值应为入泵时的坍落度",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":701,"analysis":37},1135294,"关于钢筋焊接施工的说法，正确的有（ ）。2015年",[691,693,695,697,699],{"key":20,"text":692,"correct":26},"焊工必须经项目部培训且考核合格后才能上岗",{"key":24,"text":694,"correct":26},"钢筋的纵向焊接不得采用电弧焊",{"key":28,"text":696,"correct":22},"钢筋焊接前应先进行试焊，合格后方可正式施焊",{"key":31,"text":698,"correct":22},"受力钢筋焊接接头应设置在内力较小处",{"key":34,"text":700,"correct":22},"受力钢筋焊接接头应错开布置","CDE",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":126,"analysis":37},1135295,"关于悬索桥锚碇的说法，错误的有（ ）。2017真题",[706,708,710,712,714],{"key":20,"text":707,"correct":22},"承担主塔的重力及下压力",{"key":24,"text":709,"correct":26},"主要承担来自主缆的拉力",{"key":28,"text":711,"correct":22},"是悬索桥的主要承载构件",{"key":31,"text":713,"correct":26},"隧道式锚碇将其承担的荷载传递给基岩",{"key":34,"text":715,"correct":22},"重力式锚碇主要借助基岩摩擦力抵抗主缆拉力",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":559,"analysis":37},1135296,"桥梁运营状况的主要监测内容包括（ ）。2014年",[720,722,724,726,728],{"key":20,"text":721,"correct":26},"桥梁结构在施工荷载作用下的受力、变形及动力参数",{"key":24,"text":723,"correct":22},"桥梁结构在正常环境与交通条件下运营的物理与力学状态",{"key":28,"text":725,"correct":22},"桥梁重要非结构构件和附属设施的工作状态",{"key":31,"text":727,"correct":22},"桥梁所处环境条件",{"key":34,"text":729,"correct":22},"桥梁结构构件的耐久性",{"id":731,"libraryId":5,"type":15,"typeLabel":16,"stem":732,"options":733,"answer":97,"analysis":37},1135297,"（2019年真题）高性能混凝土不宜采用（ ）。",[734,736,738,740,742],{"key":20,"text":735,"correct":22},"强度等级32.5级的硅酸盐水泥",{"key":24,"text":737,"correct":26},"强度等级42.5级的硅酸盐水泥",{"key":28,"text":739,"correct":26},"强度等级52.5级的普通硅酸盐水泥",{"key":31,"text":741,"correct":22},"矿渣硅酸盐水泥",{"key":34,"text":743,"correct":22},"粉煤灰硅酸盐水泥",[745,749,752,755,758,761],{"id":746,"name":747,"category":7,"favorite":748},1,"领导干部任职前廉政法规知识测试题",92,{"id":750,"name":751,"category":7,"favorite":746},595,"建筑结构与设备",{"id":753,"name":754,"category":7,"favorite":746},715,"招标采购专业知识与法律法规",{"id":756,"name":757,"category":7,"favorite":746},848,"市政方向-通用基础",{"id":759,"name":760,"category":7,"favorite":8},534,"BIM工程师",{"id":762,"name":760,"category":7,"favorite":8},535]