[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":725},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,28,50,1523,[13,38,53,67,79,94,109,124,139,154,168,182,196,208,222,236,250,265,274,287,301,314,329,343,357,371,385,399,413,428,442,457,471,486,500,514,528,542,557,571,585,599,613,627,641,654,668,683,697,711],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1135147,2,"多选题","有利于石灰稳定土基层裂缝的防治措施有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","超出规范标准提高水泥用量",false,{"key":24,"text":25,"correct":26},"B","施工用土中适量掺加粉煤灰",true,{"key":28,"text":29,"correct":26},"C","控制压实含水量，需要根据土的性质采用最佳含水量，避免含水量过高或过低",{"key":31,"text":32,"correct":26},"D","在石灰土基层与路面间铺筑一层碎石过渡层，可有效避免裂缝",{"key":34,"text":35,"correct":22},"E","选择在晚秋、初冬后施工","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1135148,"可能导致水泥稳定碎石基层产生裂缝的原因有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"水泥用量偏大",{"key":24,"text":45,"correct":26},"集料级配中细料偏多",{"key":28,"text":47,"correct":26},"碾压时含水量偏大",{"key":31,"text":49,"correct":22},"采用了缓凝水泥",{"key":34,"text":51,"correct":26},"碎石中含泥量较高","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},1135149,"水泥稳定土基层产生裂缝的原因有（ ）。",[57,59,61,62,64],{"key":20,"text":58,"correct":22},"水泥比例偏小",{"key":24,"text":60,"correct":22},"碾压时含水量偏小",{"key":28,"text":51,"correct":26},{"key":31,"text":63,"correct":26},"路基发生不均匀沉降",{"key":34,"text":65,"correct":26},"拌和不均匀","CDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":78,"analysis":37},1135150,"产生无机结合料基层裂缝的原因可能有（ ）。",[71,73,74,76,77],{"key":20,"text":72,"correct":22},"集料级配中细料偏少",{"key":24,"text":47,"correct":26},{"key":28,"text":75,"correct":22},"成型温度较低，强度形成较慢",{"key":31,"text":51,"correct":26},{"key":34,"text":63,"correct":26},"BDE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1135151,"公路桥涵结构按正常使用极限状态设计时，应根据不同的设计要求，采用的效应组合有（ ）。",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"作用短期效应组合",{"key":24,"text":86,"correct":22},"作用中期效应组合",{"key":28,"text":88,"correct":26},"准永久组合",{"key":31,"text":90,"correct":22},"作用偶然效应组合",{"key":34,"text":92,"correct":26},"频遇组合","CE",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1135152,"公路桥涵设计采用的偶然作用包括有（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":26},"船舶的撞击作用",{"key":24,"text":101,"correct":26},"漂流物的撞击作用",{"key":28,"text":103,"correct":22},"汽车冲击力",{"key":31,"text":105,"correct":26},"汽车撞击作用",{"key":34,"text":107,"correct":22},"地震作用","ABD",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1135153,"拱桥轻型桥台的类型包括（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"加筋土桥台",{"key":24,"text":116,"correct":26},"八字形桥台",{"key":28,"text":118,"correct":26},"U字形桥台",{"key":31,"text":120,"correct":26},"背撑式桥台",{"key":34,"text":122,"correct":26},"靠背式框架桥台","BCDE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},1135154,"下列桥墩中属于梁桥轻型桥墩的有（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":26},"钢筋混凝土薄壁桥墩",{"key":24,"text":131,"correct":26},"柱式桥墩",{"key":28,"text":133,"correct":26},"柔性排架桥墩",{"key":31,"text":135,"correct":26},"钻孔桩柱式桥墩",{"key":34,"text":137,"correct":22},"悬臂式单向推力墩","ABCD",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},1135155,"地下连续墙按成墙方式可分为（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":26},"桩排式",{"key":24,"text":146,"correct":22},"临时挡土墙",{"key":28,"text":148,"correct":26},"壁板式",{"key":31,"text":150,"correct":22},"抓斗式",{"key":34,"text":152,"correct":26},"组合式","ACE",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":123,"analysis":37},1135156,"钻孔灌注桩适用于（ ）等土层。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"软土",{"key":24,"text":161,"correct":26},"砂土",{"key":28,"text":163,"correct":26},"碎石",{"key":31,"text":165,"correct":26},"粘性土",{"key":34,"text":167,"correct":26},"岩石",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":36,"analysis":37},1135157,"对基桩的计算，说法正确的有（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"承台底面以上的竖直荷载假定90%由基桩承受",{"key":24,"text":175,"correct":26},"桥台土压力可按填土前的原地面起算。当基桩上部位于内摩擦角小于20°的软土中时，应验算桩因该层土施加于基桩的水平力所产生的挠曲",{"key":28,"text":177,"correct":26},"在一般情况下，桩基不需要进行抗倾覆和抗滑动的验算；但在特殊情况下，应验算桩基向前移动或被剪断的可能性",{"key":31,"text":179,"correct":26},"在软土层较厚，持力层较好的地基中，桩基计算应考虑路基填土荷载或地下水位下降所引起的负摩阻力的影响",{"key":34,"text":181,"correct":22},"计算中略去桩周围的摩阻力和弹性抗力的作用",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":36,"analysis":37},1135158,"桩基础按施工方法可分为（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"管柱",{"key":24,"text":189,"correct":26},"沉桩",{"key":28,"text":191,"correct":26},"钻孔灌注桩",{"key":31,"text":193,"correct":26},"挖孔桩",{"key":34,"text":195,"correct":22},"摩擦桩",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":207,"analysis":37},1135159,"按施工方法分类，桩基础可分为（ ）。",[200,201,202,203,205],{"key":20,"text":189,"correct":26},{"key":24,"text":191,"correct":26},{"key":28,"text":193,"correct":26},{"key":31,"text":204,"correct":22},"混凝土桩",{"key":34,"text":206,"correct":22},"钢桩","ABC",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":221,"analysis":37},1135160,"下列不属于桥梁基础按施工方法分类的是（ ）。",[212,214,215,217,219],{"key":20,"text":213,"correct":22},"扩大基础",{"key":24,"text":189,"correct":26},{"key":28,"text":216,"correct":22},"沉井",{"key":31,"text":218,"correct":26},"盖梁",{"key":34,"text":220,"correct":22},"地下连续墙","BD",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":66,"analysis":37},1135161,"桥梁按上部结构的行车道位置，分为（ ）。",[226,228,230,232,234],{"key":20,"text":227,"correct":22},"公路桥",{"key":24,"text":229,"correct":22},"铁路桥",{"key":28,"text":231,"correct":26},"上承式桥",{"key":31,"text":233,"correct":26},"下承式桥",{"key":34,"text":235,"correct":26},"中承式桥",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":36,"analysis":37},1135162,"下列属于组合体系桥梁的是（ ）",[240,242,244,246,248],{"key":20,"text":241,"correct":22},"钢管混凝土拱桥",{"key":24,"text":243,"correct":26},"斜拉桥",{"key":28,"text":245,"correct":26},"连续刚构桥",{"key":31,"text":247,"correct":26},"系杆拱",{"key":34,"text":249,"correct":22},"斜腿刚架",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":264,"analysis":37},1135163,"桥下净空高度是（ ）至桥跨结构最下缘间的距离。",[254,256,258,260,262],{"key":20,"text":255,"correct":26},"设计洪水位",{"key":24,"text":257,"correct":22},"低水位",{"key":28,"text":259,"correct":26},"计算通航水位",{"key":31,"text":261,"correct":22},"高水位",{"key":34,"text":263,"correct":22},"桥下线路路面","AC",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":264,"analysis":37},1135164,"某河流的上方架桥，桥下净空高度是（ ）至桥跨结构最下缘间的距离。",[269,270,271,272,273],{"key":20,"text":255,"correct":26},{"key":24,"text":257,"correct":22},{"key":28,"text":259,"correct":26},{"key":31,"text":261,"correct":22},{"key":34,"text":263,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":138,"analysis":37},1135165,"按桥梁的结构体系划分，其基本体系有（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":26},"梁式桥",{"key":24,"text":281,"correct":26},"拱桥",{"key":28,"text":283,"correct":26},"刚架桥",{"key":31,"text":285,"correct":26},"悬索桥",{"key":34,"text":243,"correct":22},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":108,"analysis":37},1135166,"下列结构组成中,属于桥梁下部结构的有（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"桥墩",{"key":24,"text":294,"correct":26},"桥台",{"key":28,"text":296,"correct":22},"栏杆",{"key":31,"text":298,"correct":26},"基础",{"key":34,"text":300,"correct":22},"伸缩缝",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":138,"analysis":37},1135167,"桥梁的基本组成部分有（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"上部结构",{"key":24,"text":308,"correct":26},"下部结构",{"key":28,"text":310,"correct":26},"支座系统",{"key":31,"text":312,"correct":26},"附属设施",{"key":34,"text":292,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},1135168,"关于模板、支架和拱架拆除的说法中，正确的有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":26},"钢筋混凝土结构的承重模板、支架和拱架，应在混凝土强度能承受其自重荷载及其他可能的叠加荷载时，方可拆除",{"key":24,"text":321,"correct":22},"现浇混凝土拱圈的拱架，拆除期限应符合设计规定；设计未规定时，应在拱圈混凝土强度达到设计强度的75%后，方可拆落拆除",{"key":28,"text":323,"correct":22},"跨径小于10m的小拱桥，宜在护拱砌完后卸架",{"key":31,"text":325,"correct":22},"模板拆除应遵循先支先拆，后支后拆的顺序",{"key":34,"text":327,"correct":26},"承包人应在拟定拆模时间的12h以前，向监理工程师报告拆模建议，并应取得监理工程师同意","AE",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":52,"analysis":37},1135169,"计算拱架施工预拱度时，应考虑的因素有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"支架和拱架在荷载作用下的弹性压缩",{"key":24,"text":336,"correct":26},"支架和拱架在荷载作用下的非弹性压缩",{"key":28,"text":338,"correct":26},"支架和拱架拆除后上部构造本身及活载1\u002F2所产生的挠度",{"key":31,"text":340,"correct":22},"结构重力和全部汽车荷载引起的拱圈弹性挠度",{"key":34,"text":342,"correct":26},"由混凝土收缩及温度变化而引起的挠度",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":356,"analysis":37},1135170,"拱架按结构不同划分为（ ）拱架。",[347,349,351,353,355],{"key":20,"text":348,"correct":26},"支柱式",{"key":24,"text":350,"correct":26},"撑架式",{"key":28,"text":352,"correct":22},"梁式",{"key":31,"text":354,"correct":26},"桁式",{"key":34,"text":152,"correct":26},"ABDE",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":52,"analysis":37},1135171,"中小跨径的空心板制作时所使用充气芯模应符合的要求有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"充气胶囊在使用前应经过检查，不得漏气，每次使用后，应妥善存放，防止污染、破损及老化",{"key":24,"text":364,"correct":26},"从开始浇筑混凝土到胶囊放气时止，其充气压力应保持稳定",{"key":28,"text":366,"correct":26},"浇筑混凝土时，为防止胶囊上浮和偏位，应采取有效措施加以固定，并应对称平衡地进行浇筑",{"key":31,"text":368,"correct":22},"胶囊的放气时间应根据经验确定",{"key":34,"text":370,"correct":26},"安装时应有专人检查钢丝头，钢丝头应弯向内侧，胶囊涂刷隔离剂",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":36,"analysis":37},1135172,"计算设于水中的支架或拱架的强度和稳定时，应考虑的荷载有（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"水深",{"key":24,"text":378,"correct":26},"水流压力",{"key":28,"text":380,"correct":26},"流冰压力",{"key":31,"text":382,"correct":26},"船只漂流物的撞击力",{"key":34,"text":384,"correct":22},"土压力",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":153,"analysis":37},1135173,"计算底模板、支架和拱架时，除了考虑模板、支架和拱架自重外，还应考虑的设计荷载，计算强度用的有（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"新浇筑混凝土、钢筋混凝土或其他圬工结构物的重力",{"key":24,"text":392,"correct":22},"作用在模板、支架和拱架上的温度应力",{"key":28,"text":394,"correct":26},"振捣混凝土时产生的荷载",{"key":31,"text":396,"correct":22},"新浇筑混凝土对侧面模板的压力",{"key":34,"text":398,"correct":26},"工作人员和施工材料、机具等行走运输或堆放的荷载",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":221,"analysis":37},1135174,"在选用模板时，宜优先选用（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"组合模板",{"key":24,"text":406,"correct":26},"钢模板",{"key":28,"text":408,"correct":22},"木模板",{"key":31,"text":410,"correct":26},"胶合板",{"key":34,"text":412,"correct":22},"自制模板",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":427,"analysis":37},1135175,"模板、拱架和支架施工方案的内容应包括（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":26},"工艺图",{"key":24,"text":420,"correct":22},"支架预算书",{"key":28,"text":422,"correct":26},"强度计算书",{"key":31,"text":424,"correct":26},"稳定性计算书",{"key":34,"text":426,"correct":26},"刚度计算书","ACDE",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":138,"analysis":37},1135176,"预应力混凝土张拉用的千斤顶与压力表应配套标定、配套使用,其重新进行标定的条件包括（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"使用时间超过6个月",{"key":24,"text":435,"correct":26},"张拉次数超过300次",{"key":28,"text":437,"correct":26},"使用过程中千斤顶或压力表出现异常情况",{"key":31,"text":439,"correct":26},"千斤顶检修或更换配件后",{"key":34,"text":441,"correct":22},"千斤顶表面锈蚀",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":456,"analysis":37},1135177,"下列预应力张拉要求中，错误的是（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":26},"有几套张拉设备时，可根据现场情况随机组合使用",{"key":24,"text":449,"correct":22},"进行张拉作业前，必须对千斤顶进行标定",{"key":28,"text":451,"correct":22},"当梁体混凝土强度达到设计规定的张拉强度时，方可进行张拉",{"key":31,"text":453,"correct":26},"预应力张拉以实际伸长量控制为主",{"key":34,"text":455,"correct":22},"预应力钢筋张拉时，应先调整到初应力再开始张拉和量测伸长值","AD",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":207,"analysis":37},1135178,"用于大桥的在锚具、夹具和连接器进场时，除应按出厂合格证和质量证明书核查锚固性能类别、型号、规格及数量外，还应进行（ ）等验收工作。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"外观检查",{"key":24,"text":464,"correct":26},"硬度检验",{"key":28,"text":466,"correct":26},"静载锚固性能试验",{"key":31,"text":468,"correct":22},"弯曲试验",{"key":34,"text":470,"correct":22},"拉力试验",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":485,"analysis":37},1135179,"预应力筋的下料,应采用（ ）切断。",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"切断机",{"key":24,"text":478,"correct":26},"砂轮锯",{"key":28,"text":480,"correct":22},"电弧",{"key":31,"text":482,"correct":22},"钢锯条",{"key":34,"text":484,"correct":22},"乙炔—氧气","AB",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":153,"analysis":37},1135180,"每批钢绞线应分批验收，验收时除应对其质量证明书、包装、标志和规定等进行检查外，还应检查（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":26},"表面质量",{"key":24,"text":493,"correct":22},"运输方式",{"key":28,"text":495,"correct":26},"直径偏差",{"key":31,"text":497,"correct":22},"单价",{"key":34,"text":499,"correct":26},"力学性能试验",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":66,"analysis":37},1135181,"关于人工挖孔桩施工要求的说法，正确的有（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"孔口处护圈应与地面齐平",{"key":24,"text":507,"correct":22},"挖孔桩施工应按桩号顺序一次开挖",{"key":28,"text":509,"correct":26},"施工前应制定安全专项施工方案",{"key":31,"text":511,"correct":26},"并孔内电缆应为防水绝缘电缆，照明电压不应大于36V",{"key":34,"text":513,"correct":26},"挖孔作业时，应经常检查孔内情况",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":52,"analysis":37},1135182,"导致钻孔灌注桩施工中断桩的原因有（ ），",[518,520,522,524,526],{"key":20,"text":519,"correct":26},"混凝土坍落度太小，骨料太大，运输距离过长，混凝土和易性差",{"key":24,"text":521,"correct":26},"计算导管埋管深度时出错，或盲目提升导管，使导管脱离混凝土面",{"key":28,"text":523,"correct":26},"钢筋笼将导管卡住，强力拔管时，使泥浆混入混凝土中",{"key":31,"text":525,"correct":22},"桩底清孔不彻底",{"key":34,"text":527,"correct":26},"导管接头处渗漏，泥浆进入管内，混入混凝土中",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":427,"analysis":37},1135183,"下列关于钻孔灌注桩正循环回转法的说法正确的有（ ）。",[532,534,536,538,540],{"key":20,"text":533,"correct":26},"它是利用钻具旋转切削土体钻进，泥浆泵将泥浆压进泥浆笼头，通过钻杆中心从钻头喷入钻孔内",{"key":24,"text":535,"correct":22},"泥浆输入钻孔内，然后从钻头的钻杆下口吸进，通过钻杆中心排出至沉淀池内",{"key":28,"text":537,"correct":26},"泥浆挟带钻渣沿钻孔上升，从护筒顶部排浆孔排出至沉淀池",{"key":31,"text":539,"correct":26},"泥浆挟带钻渣沿钻孔上升",{"key":34,"text":541,"correct":26},"需设置泥浆槽、沉淀池等",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":556,"analysis":37},1135184,"相对于反循环回转钻孔，以下属于正循环回转钻孔特点的有（ ）。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"泥浆通过钻杆中心排出至沉淀池内",{"key":24,"text":549,"correct":26},"钻进与排渣同时进行",{"key":28,"text":551,"correct":26},"施工占地较多",{"key":31,"text":553,"correct":22},"钻渣易堵塞管路",{"key":34,"text":555,"correct":26},"机具设备较复杂","BCE",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":52,"analysis":37},1135185,"钻孔灌注桩施工步骤包括（ ）。",[561,563,565,567,569],{"key":20,"text":562,"correct":26},"钢筋笼制作",{"key":24,"text":564,"correct":26},"埋设护筒",{"key":28,"text":566,"correct":26},"钻孔",{"key":31,"text":568,"correct":22},"孔内通风",{"key":34,"text":570,"correct":26},"制备泥浆",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":427,"analysis":37},1135186,"沉桩时遇到下列情况可以停止锤击的有（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":26},"沉入度突然发生急剧变化",{"key":24,"text":578,"correct":22},"桩尖已沉入到设计标高，贯入度没有达到要求时可以停止锤击",{"key":28,"text":580,"correct":26},"桩身突然发生倾斜、移位",{"key":31,"text":582,"correct":26},"桩顶破碎或桩身开裂、变形，桩侧地面有严重隆起现象",{"key":34,"text":584,"correct":26},"桩不下沉，桩锤有严重的回弹现象",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":52,"analysis":37},1135187,"沉入桩的施工方法主要有（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":26},"锤击沉桩",{"key":24,"text":592,"correct":26},"振动沉桩",{"key":28,"text":594,"correct":26},"射水沉桩",{"key":31,"text":596,"correct":22},"自动沉桩",{"key":34,"text":598,"correct":26},"静力压桩",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":138,"analysis":37},1135188,"可导致基坑开挖边坡失稳的主要因素有（ ）。",[603,605,607,609,611],{"key":20,"text":604,"correct":26},"基坑深度过大，而坑壁坡度较陡",{"key":24,"text":606,"correct":26},"地下水以下部分开挖，土质易坍塌却没有增设加固措施",{"key":28,"text":608,"correct":26},"基坑四周没有设置截水沟、排水沟拦截地表径流",{"key":31,"text":610,"correct":26},"弃土位置距基坑太近甚至放在基坑四周",{"key":34,"text":612,"correct":22},"施工延续时间比较短",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":36,"analysis":37},1135189,"明挖地基的主要检验内容有（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"基础埋置深度",{"key":24,"text":620,"correct":26},"基底地质情况和承载力",{"key":28,"text":622,"correct":26},"基底平面位置、尺寸大小和基底标高",{"key":31,"text":624,"correct":26},"基底土质均匀性",{"key":34,"text":626,"correct":22},"基础的纵、横向倾斜度",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":66,"analysis":37},1135190,"对于土质渗透性较大、挖掘较深的基坑可采用基坑排水方法有（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"集水坑排水法",{"key":24,"text":634,"correct":22},"井点排水法",{"key":28,"text":636,"correct":26},"板桩法",{"key":31,"text":638,"correct":26},"沉井法",{"key":34,"text":640,"correct":26},"帷幕法",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":138,"analysis":37},1135191,"桥梁明挖扩大基础施工中，基底检验的主要内容应包括（ ）。",[645,647,649,650,652],{"key":20,"text":646,"correct":26},"基底平面位置、尺寸大小",{"key":24,"text":648,"correct":26},"基底标高",{"key":28,"text":624,"correct":26},{"key":31,"text":651,"correct":26},"地基稳定性及承载力",{"key":34,"text":653,"correct":22},"集水坑数量",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":138,"analysis":37},1135192,"坑壁不加支撑的支撑基坑，下列说法正确的有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"基坑尺寸应满足施工要求",{"key":24,"text":661,"correct":26},"基坑坑壁坡度应按地质条件、基坑深度、施工方法等情况确定",{"key":28,"text":663,"correct":26},"如土的湿度有可能使坑壁不稳定而引起坍塌时，基坑坑壁坡度应缓于该湿度下的天然坡度",{"key":31,"text":665,"correct":26},"一般基底应比基础的平面尺寸增宽0.5~1.0m",{"key":34,"text":667,"correct":22},"当不设模板时，不能按基础底的尺寸开挖基坑。",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":682,"analysis":37},1135193,"无支护加固坑壁的基坑开挖的条件是（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":26},"在干枯无水河滩",{"key":24,"text":675,"correct":22},"地下水位高于基底",{"key":28,"text":677,"correct":26},"通过筑堤能排除地表水的河沟",{"key":31,"text":679,"correct":26},"地下水渗透量小，不影响坑壁的稳定",{"key":34,"text":681,"correct":22},"基础埋置较深","ACD",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":427,"analysis":37},1135194,"采用滑升模板浇筑墩台混凝土时，应符合的规定有（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":26},"宜采用低流动度或半干硬性混凝土",{"key":24,"text":690,"correct":22},"应采用平板式振动器振捣",{"key":28,"text":692,"correct":26},"每一整体结构的浇筑应连续进行，若因故中途停工，应按施工缝处理",{"key":31,"text":694,"correct":26},"浇筑应分层分段进行，各段应浇筑到距模板上口不小于100～150㎜的位置为止",{"key":34,"text":696,"correct":26},"混凝土脱模时的强度宜为0.2～0.5MPa",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":123,"analysis":37},1135195,"桥梁施工控制方法可分为（ ）。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"事中控制法",{"key":24,"text":704,"correct":26},"事后控制法",{"key":28,"text":706,"correct":26},"预测控制法",{"key":31,"text":708,"correct":26},"自适应控制法",{"key":34,"text":710,"correct":26},"最大宽容度控制法",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":123,"analysis":37},1135196,"桥梁运营状况的主要监测内容包括（ ）。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"桥梁结构在施工荷载作用下的受力、变形及动力参数",{"key":24,"text":718,"correct":26},"桥梁结构在正常环境与交通条件下运营的物理与力学状态",{"key":28,"text":720,"correct":26},"桥梁重要非结构构件和附属设施的工作状态",{"key":31,"text":722,"correct":26},"桥梁所处环境条件",{"key":34,"text":724,"correct":26},"桥梁结构构件的耐久性",[726,730,733,736,739,742],{"id":727,"name":728,"category":7,"favorite":729},1,"领导干部任职前廉政法规知识测试题",92,{"id":731,"name":732,"category":7,"favorite":727},595,"建筑结构与设备",{"id":734,"name":735,"category":7,"favorite":727},715,"招标采购专业知识与法律法规",{"id":737,"name":738,"category":7,"favorite":727},848,"市政方向-通用基础",{"id":740,"name":741,"category":7,"favorite":8},534,"BIM工程师",{"id":743,"name":741,"category":7,"favorite":8},535]