[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,27,50,1523,[13,38,53,67,82,97,112,127,139,154,168,183,198,208,223,234,248,262,275,287,301,315,330,344,358,372,386,400,415,429,443,458,472,486,500,513,527,541,555,569,583,597,611,624,637,651,665,679,693,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1135095,2,"多选题","用于填隙碎石的填隙料可采用（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","石屑",true,{"key":24,"text":25,"correct":26},"B","矿渣",false,{"key":28,"text":29,"correct":26},"C","4.75~9.5mm的碎石",{"key":31,"text":32,"correct":22},"D","细砾砂",{"key":34,"text":35,"correct":22},"E","粗砂","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1135096,"不能用于稳定土的水泥有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"初凝时间较长（宜在3h以上）的水泥",{"key":24,"text":45,"correct":26},"终凝时间较长（宜在6h以上）的水泥",{"key":28,"text":47,"correct":22},"快硬水泥",{"key":31,"text":49,"correct":22},"早强水泥",{"key":34,"text":51,"correct":22},"受潮变质的水泥","CDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1135097,"以下属于嵌锁型路面粒料基层的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"泥结碎石",{"key":24,"text":60,"correct":26},"级配碎石",{"key":28,"text":62,"correct":26},"级配砾石",{"key":31,"text":64,"correct":22},"泥灰结碎石",{"key":34,"text":66,"correct":22},"填隙碎石",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1135098,"热拌沥青混合料运料车用篷布覆盖主要起到（ ）的作用。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"防雨",{"key":24,"text":74,"correct":22},"防污染",{"key":28,"text":76,"correct":26},"防泄漏",{"key":31,"text":78,"correct":22},"保温",{"key":34,"text":80,"correct":26},"防扬尘","ABD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1135099,"关于乳化沥青碎石基层施工的说法，正确的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"乳化沥青碎石混合料必须采用拌合机拌合",{"key":24,"text":89,"correct":22},"混合料的拌合、运输、摊铺应在乳液破乳之前结束",{"key":28,"text":91,"correct":26},"乳化沥青破乳之前，应完成所有碾压工作",{"key":31,"text":93,"correct":22},"拌合过程中已发生破乳的混合料，应予废弃",{"key":34,"text":95,"correct":22},"施工过程中遇雨应停止铺筑，以防止雨水将乳液冲走","BDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1135100,"下列哪种材料适用于各级公路的基层和底基层（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"水泥稳定类",{"key":24,"text":104,"correct":26},"石灰稳定类",{"key":28,"text":106,"correct":22},"石灰粉煤灰稳定类",{"key":31,"text":108,"correct":26},"水泥粉煤灰类",{"key":34,"text":110,"correct":26},"粉煤灰稳定类","AC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1135101,"下面适用于各级公路的基层和底基层的是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"水泥稳定碎石",{"key":24,"text":119,"correct":26},"石灰稳定土",{"key":28,"text":121,"correct":22},"水泥稳定土",{"key":31,"text":123,"correct":22},"石灰粉煤灰土",{"key":34,"text":125,"correct":22},"石灰粉煤灰碎石","ACDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":138,"analysis":37},1135102,"半刚性基层包括（ ）。",[131,132,133,135,136],{"key":20,"text":60,"correct":26},{"key":24,"text":121,"correct":22},{"key":28,"text":134,"correct":22},"石灰工业废渣稳定土",{"key":31,"text":119,"correct":22},{"key":34,"text":137,"correct":26},"沥青碎石","BCD",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},1135103,"下列无机结合料基层养护的说法，正确的是（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"每一段碾压完成并经压实度检查合格后，应立即开始养护",{"key":24,"text":146,"correct":22},"一级公路基层的养护期不宜少于7d",{"key":28,"text":148,"correct":26},"水泥稳定土基层不能用沥青乳液进行养护",{"key":31,"text":150,"correct":22},"养护期间，稳定材料层表面应始终保持湿润",{"key":34,"text":152,"correct":22},"石灰稳定土养护期间，不应过湿或忽干忽湿","ABDE",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":81,"analysis":37},1135104,"关于无机结合料稳定材料层之间处理的说法中，正确的有（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"在上层结构施工前，应将下层养护用材料彻底清理干净",{"key":24,"text":161,"correct":22},"应采用人工、小型清扫车以及洒水冲刷的方式将下层表面的浮浆清理干净",{"key":28,"text":163,"correct":26},"下承层局部存在松散现象时，无需彻底清理干净",{"key":31,"text":165,"correct":22},"在上层施工前1～2h，宜撒布水泥或洒铺水泥净浆",{"key":34,"text":167,"correct":26},"禁止采用上下结构层连续摊铺施工的方式",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},1135105,"沥青混合料按组成结构分类原则可分为（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"密实悬浮结构",{"key":24,"text":175,"correct":22},"骨架空隙结构",{"key":28,"text":177,"correct":22},"密实骨架结构",{"key":31,"text":179,"correct":26},"嵌挤级配结构",{"key":34,"text":181,"correct":26},"连续级配结构","ABC",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1135106,"垫层是设置在底基层与土基之间的结构层，主要起（ ）作用。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"排水",{"key":24,"text":190,"correct":22},"防冻",{"key":28,"text":192,"correct":22},"防污",{"key":31,"text":194,"correct":22},"隔水",{"key":34,"text":196,"correct":26},"承重","ABCD",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":126,"analysis":37},1135107,"沥青路面的垫层是设置在底基层与土基之间的结构层，起（ ）等作用。",[202,203,205,206,207],{"key":20,"text":188,"correct":22},{"key":24,"text":204,"correct":26},"防开裂",{"key":28,"text":194,"correct":22},{"key":31,"text":190,"correct":22},{"key":34,"text":192,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":222,"analysis":37},1135108,"适用二级公路沥青面层的沥青有（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"A级沥青",{"key":24,"text":215,"correct":22},"B级沥青",{"key":28,"text":217,"correct":26},"C级沥青",{"key":31,"text":219,"correct":26},"D级沥青",{"key":34,"text":221,"correct":26},"等外级沥青","AB",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":96,"analysis":37},1135109,"道路石油沥青的等级分为（ ）。",[227,229,230,232,233],{"key":20,"text":228,"correct":26},"一级沥青",{"key":24,"text":213,"correct":22},{"key":28,"text":231,"correct":26},"特级沥青",{"key":31,"text":215,"correct":22},{"key":34,"text":217,"correct":22},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":153,"analysis":37},1135110,"当缺乏所需标号的沥青时，可采用不同标号掺配的调合沥青，其掺配比例由试验决定。掺配后的沥青质量（ ）应满足要求",[238,240,242,244,246],{"key":20,"text":239,"correct":22},"针入度指数PI",{"key":24,"text":241,"correct":22},"软化点",{"key":28,"text":243,"correct":26},"40℃延度",{"key":31,"text":245,"correct":22},"针入度（25℃，5s，100g）",{"key":34,"text":247,"correct":22},"溶解度",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":126,"analysis":37},1135111,"乳化石油沥青可用于（ ）。",[252,254,256,258,260],{"key":20,"text":253,"correct":22},"沥青表面处治路面",{"key":24,"text":255,"correct":26},"热拌沥青混合拌料路面",{"key":28,"text":257,"correct":22},"透层",{"key":31,"text":259,"correct":22},"粘层",{"key":34,"text":261,"correct":22},"封层",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":274,"analysis":37},1135112,"喷洒型改性乳化沥青适用层次包括（ ）。",[266,267,269,270,272],{"key":20,"text":259,"correct":22},{"key":24,"text":268,"correct":26},"沥青碎石基层",{"key":28,"text":261,"correct":22},{"key":31,"text":271,"correct":26},"热拌沥青混合料面层",{"key":34,"text":273,"correct":22},"桥面防水粘结层","ACE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":52,"analysis":37},1135113,"一级公路沥青面层的粗集料不可使用（ ）",[279,281,283,285,286],{"key":20,"text":280,"correct":26},"碎石",{"key":24,"text":282,"correct":26},"破碎砾石",{"key":28,"text":284,"correct":22},"筛选砾石",{"key":31,"text":25,"correct":22},{"key":34,"text":21,"correct":22},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":153,"analysis":37},1135114,"热拌沥青混凝土路面施工前的准备工作包括（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"备料",{"key":24,"text":294,"correct":22},"恢复中线",{"key":28,"text":296,"correct":26},"洒布封层",{"key":31,"text":298,"correct":22},"铺筑试验段",{"key":34,"text":300,"correct":22},"原材料符合性检验",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":197,"analysis":37},1135115,"热拌沥青混凝土路面施工时，在监理工程师批准的现场备齐全部机械设备进行试验段铺筑，以确定（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"松铺系数",{"key":24,"text":308,"correct":22},"压实遍数",{"key":28,"text":310,"correct":22},"施工工艺",{"key":31,"text":312,"correct":22},"机械配备",{"key":34,"text":314,"correct":26},"地基回弹模量",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},1135116,"热拌沥青混凝土路面施工工艺包括（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"配合比调试",{"key":24,"text":322,"correct":22},"沥青混合料抽提等试验",{"key":28,"text":324,"correct":22},"试验段施工",{"key":31,"text":326,"correct":26},"养护",{"key":34,"text":328,"correct":22},"沥青混凝土配合比设计","ABCE",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":153,"analysis":37},1135117,"沥青混合料在运输过程中出现（ ）时应予以废弃。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"已离析的混合料",{"key":24,"text":337,"correct":22},"硬化在运输车箱内的混合料",{"key":28,"text":339,"correct":26},"在夏季中午高温时运输的混合料",{"key":31,"text":341,"correct":22},"低于规定铺筑温度的混合料",{"key":34,"text":343,"correct":22},"被雨淋的混合料",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":182,"analysis":37},1135119,"在基层上用于浇洒透层的材料包括（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"乳化沥青",{"key":24,"text":351,"correct":22},"煤沥青",{"key":28,"text":353,"correct":22},"液体沥青",{"key":31,"text":355,"correct":26},"石灰浆",{"key":34,"text":357,"correct":26},"水泥浆",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":197,"analysis":37},1135120,"热拌沥青混凝土路面施工过程中通常应随时检查铺筑厚度以及（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"平整度",{"key":24,"text":365,"correct":22},"宽度",{"key":28,"text":367,"correct":22},"横坡度",{"key":31,"text":369,"correct":22},"高程",{"key":34,"text":371,"correct":26},"含水量",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":52,"analysis":37},1135121,"粘层油可采用（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":26},"沥青水泥浆",{"key":24,"text":379,"correct":26},"慢裂乳化石油沥青",{"key":28,"text":381,"correct":22},"中裂液体石油沥青",{"key":31,"text":383,"correct":22},"快裂液体石油沥青",{"key":34,"text":385,"correct":22},"中凝液体石油沥青",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":274,"analysis":37},1135122,"关于沥青混凝土路面中封层作用的说法，正确的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"封闭某一层，起保水、防水作用",{"key":24,"text":393,"correct":26},"增加基层的整体强度和厚度",{"key":28,"text":395,"correct":22},"起基层与沥青表面之间的过渡和有效联结作用",{"key":31,"text":397,"correct":26},"起路的某一层表层之间的过渡和有效联结作用",{"key":34,"text":399,"correct":22},"沥青层面铺筑前要临时开放交通，防止基层因天气或车辆作用出现水毁",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":414,"analysis":37},1135123,"在水泥路面上进行沥青面层加铺，通常可采用的方法有（ ）。",[404,406,408,410,412],{"key":20,"text":405,"correct":26},"滑模施工法",{"key":24,"text":407,"correct":26},"现场热再生法",{"key":28,"text":409,"correct":22},"碎石化法",{"key":31,"text":411,"correct":26},"现场冷再生法",{"key":34,"text":413,"correct":22},"直接加铺法","CE",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":182,"analysis":37},1135124,"根据路面破损情况的不同和对修复后路面质量等级的不同要求，就地热再生技术应用的施工工艺主要有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"整形再生法",{"key":24,"text":422,"correct":22},"重铺再生法",{"key":28,"text":424,"correct":22},"复拌再生法",{"key":31,"text":426,"correct":26},"破碎再生法",{"key":34,"text":428,"correct":26},"间接再生法",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":52,"analysis":37},1135125,"水泥混凝土面层铺筑的方法有（ ）等。",[433,435,437,439,441],{"key":20,"text":434,"correct":26},"预制砼块铺砌",{"key":24,"text":436,"correct":26},"水泥砂浆铺筑",{"key":28,"text":438,"correct":22},"滑模机械机铺筑",{"key":31,"text":440,"correct":22},"小型机具铺筑",{"key":34,"text":442,"correct":22},"碾压混凝土",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":457,"analysis":37},1135126,"不适合于高速公路水泥混凝土路面面层施工中使用的施工方法是（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":26},"滑模机械铺筑",{"key":24,"text":450,"correct":22},"小型机械铺筑",{"key":28,"text":452,"correct":22},"路面板装配式施工技术",{"key":31,"text":454,"correct":22},"三辊轴机组铺筑",{"key":34,"text":456,"correct":22},"碾压混凝土铺筑","BCDE",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":182,"analysis":37},1135127,"不宜采用滑模摊铺机进行水泥混凝土路面摊铺的路段有（ ）。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"上坡纵坡大于5%的路段",{"key":24,"text":465,"correct":22},"下坡纵坡大于6%的路段",{"key":28,"text":467,"correct":22},"超高横坡超过7%的路段",{"key":31,"text":469,"correct":26},"合成坡度超过8%的路段",{"key":34,"text":471,"correct":26},"平面半径小于100m的路段",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":457,"analysis":37},1135128,"水泥混凝土路面填缝时应使用背衬垫条控制填缝形状系数。背衬垫条应具有（ ）等性能。",[476,478,480,482,484],{"key":20,"text":477,"correct":26},"高温软化",{"key":24,"text":479,"correct":22},"良好的弹性",{"key":28,"text":481,"correct":22},"柔韧性",{"key":31,"text":483,"correct":22},"不吸水",{"key":34,"text":485,"correct":22},"耐酸碱腐蚀",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":457,"analysis":37},1135129,"水泥混凝土路面材料中，常温施工式填缝料主要有（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":26},"沥青玛碲脂类",{"key":24,"text":493,"correct":22},"硅树脂类",{"key":28,"text":495,"correct":22},"氯丁橡胶泥类",{"key":31,"text":497,"correct":22},"聚（氨）酯类",{"key":34,"text":499,"correct":22},"沥青橡胶类",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":96,"analysis":37},1135130,"加热施工时水泥混凝土路面所用的加热施工方式的填缝材料主要有（ ）。",[504,505,507,509,511],{"key":20,"text":495,"correct":26},{"key":24,"text":506,"correct":22},"改性沥青类",{"key":28,"text":508,"correct":26},"聚（氨）酯、硅树脂类",{"key":31,"text":510,"correct":22},"聚氯乙烯胶泥类",{"key":34,"text":512,"correct":22},"沥青玛脂类",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":81,"analysis":37},1135131,"高速公路、一级公路的水泥混凝土路面的接缝材料宜采用（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"塑胶",{"key":24,"text":520,"correct":22},"橡胶泡沫板",{"key":28,"text":522,"correct":26},"沥青贯入",{"key":31,"text":524,"correct":22},"沥青纤维板",{"key":34,"text":526,"correct":26},"胀缝板",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":274,"analysis":37},1135132,"下列关于水泥混凝土路面对水泥要求的说法正确的是（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"特重、重交通路面宜采用旋窑道路硅酸盐水泥，也可采用旋窑硅酸盐水泥或普通硅酸盐水泥",{"key":24,"text":534,"correct":26},"高温天气施工或有快通要求的路段可采用R型水泥",{"key":28,"text":536,"correct":22},"中、轻交通的路面可采用矿渣硅酸盐水泥",{"key":31,"text":538,"correct":26},"轻交通的路面宜采用旋窑道路硅酸盐水泥，也可采用旋窑硅酸盐水泥或普通硅酸盐水泥",{"key":34,"text":540,"correct":22},"低温天气施工或有快通要求的路段可采用R型水泥",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":52,"analysis":37},1135133,"水泥混凝土路面的横向缩缝的切缝方式有（ ）。",[545,547,549,551,553],{"key":20,"text":546,"correct":26},"深切缝",{"key":24,"text":548,"correct":26},"浅切缝",{"key":28,"text":550,"correct":22},"软硬结合切缝",{"key":31,"text":552,"correct":22},"全部软切缝",{"key":34,"text":554,"correct":22},"全部硬切缝",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":182,"analysis":37},1135134,"必须采用硬刻槽方式制作抗滑构造的水泥混凝土路面有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"使用圆盘抹面机精平后的混凝土路面",{"key":24,"text":562,"correct":22},"钢纤维混凝土路面",{"key":28,"text":564,"correct":22},"使用叶片式抹面机精平后的混凝土路面",{"key":31,"text":566,"correct":26},"轻交通路面",{"key":34,"text":568,"correct":26},"胀缝附近的路面",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":222,"analysis":37},1135135,"水泥混凝土路面的纵缝在构造上分为（ ）。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"设拉杆假缝型",{"key":24,"text":576,"correct":22},"设拉杆平缝型",{"key":28,"text":578,"correct":26},"不设拉杆假缝型",{"key":31,"text":580,"correct":26},"不设拉杆平缝型",{"key":34,"text":582,"correct":26},"不设拉杆企口型",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":126,"analysis":37},1135137,"缘石安装施工技术描述正确的是（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"路缘石的顶制安装或现场浇筑应符合图纸所示的线型和坡度",{"key":24,"text":590,"correct":26},"路缘石应在路面铺设之后完成",{"key":28,"text":592,"correct":22},"预制缘石应铺筑设在厚度不小于2cm的砂垫层上，砌筑砂浆的水泥与砂的体积比应为1：2",{"key":31,"text":594,"correct":22},"预制缘石的质量应符合规定要求",{"key":34,"text":596,"correct":22},"安砌稳固，顶面平整，缝宽均匀，勾缝密实，线条直顺，曲线圆滑美观",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":111,"analysis":37},1135138,"中央分隔带纵向盲沟的反滤层材料可选择（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"土工布",{"key":24,"text":604,"correct":26},"片石",{"key":28,"text":606,"correct":22},"筛选过的中砂、粗砂、砾石",{"key":31,"text":608,"correct":26},"胶泥",{"key":34,"text":610,"correct":26},"重粘土",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":111,"analysis":37},1135139,"水泥混凝土路面断板处理时，常见的裂缝处理方法有（ ）。",[615,617,619,621,622],{"key":20,"text":616,"correct":22},"压注灌浆法",{"key":24,"text":618,"correct":26},"整块板更换法",{"key":28,"text":620,"correct":22},"条带罩面法",{"key":31,"text":409,"correct":26},{"key":34,"text":623,"correct":26},"贴碳纤维法",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":153,"analysis":37},1135140,"水泥混凝上路面断板裂缝的修补方法有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"直接灌浆法",{"key":24,"text":631,"correct":22},"扩缝灌注法",{"key":28,"text":633,"correct":26},"抹画修补法",{"key":31,"text":635,"correct":22},"全深度补块法",{"key":34,"text":616,"correct":22},{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":138,"analysis":37},1135141,"水泥混凝土路面纵向裂缝的修复方法有（ ）。",[641,643,645,647,649],{"key":20,"text":642,"correct":26},"镘刀压抹",{"key":24,"text":644,"correct":22},"扩缝嵌填",{"key":28,"text":646,"correct":22},"扩缝加筋",{"key":31,"text":648,"correct":22},"浇筑专用修补剂",{"key":34,"text":650,"correct":26},"抹面修补法",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":96,"analysis":37},1135142,"导致水泥混凝土路面产生横向裂缝的原因包括（ ）。",[655,657,659,661,663],{"key":20,"text":656,"correct":26},"选用了干缩性较小的普通硅酸盐水泥",{"key":24,"text":658,"correct":22},"混凝土路面面板板厚不足",{"key":28,"text":660,"correct":26},"切缝深度过深",{"key":31,"text":662,"correct":22},"养护不及时",{"key":34,"text":664,"correct":22},"切缝不及时",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":329,"analysis":37},1135143,"水泥混凝土路面横向裂缝产生的原因有（ ）。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"混凝土配合比不合理",{"key":24,"text":672,"correct":22},"切缝深度过浅",{"key":28,"text":674,"correct":22},"水灰比大",{"key":31,"text":676,"correct":26},"未设置拉杆",{"key":34,"text":678,"correct":22},"材料计量不准确",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":182,"analysis":37},1135144,"沥青混凝土路面不平整的预防措施有（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"保证摊铺机的均匀连续作业",{"key":24,"text":686,"correct":22},"严格工序间的交验制度",{"key":28,"text":688,"correct":22},"根据实铺效果进行随时调整找平装置",{"key":31,"text":690,"correct":26},"压路机用较大的振频、振幅进行碾压",{"key":34,"text":692,"correct":26},"先做构造物伸缩缝，再摊铺沥青混凝土面层",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":707,"analysis":37},1135145,"水泥稳定土基层裂缝的主要防治方法是（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"控制压实含水量，需要根据土的性质采用最佳含水量",{"key":24,"text":700,"correct":26},"设置伸缩缝，在水泥稳定土层中，每隔5～10m设一道缩缝",{"key":28,"text":702,"correct":26},"在基层与路面间铺筑一层碎石过渡层",{"key":31,"text":704,"correct":26},"在能保证水泥稳定土强度的前提下，尽可能采用较高的水泥用量",{"key":34,"text":706,"correct":22},"设计合理的水泥稳定土配合比，加强拌和，避免出现粗细料离析和拌和不均匀现象","AE",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":197,"analysis":37},1135146,"石灰稳定土基层裂缝的主要防治方法有（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"改善施工用土的土质,采用塑性指数较低的土或适量掺加粉煤灰",{"key":24,"text":715,"correct":22},"掺加粗粒料,在石灰土中适量掺加砂、碎石、碎砖、煤渣及矿渣等",{"key":28,"text":717,"correct":22},"设置伸缩缝,在石灰土层中,每隔5~10m设一道缩缝",{"key":31,"text":719,"correct":22},"铺筑碎石过渡层,在石灰土基层与路面间铺筑一层碎石过渡层",{"key":34,"text":721,"correct":26},"选择在晚秋、初冬后施工",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]