[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":725},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,26,50,1523,[13,38,53,67,82,97,112,125,138,152,166,180,194,208,222,236,250,265,280,291,306,318,333,347,362,376,390,405,419,434,448,462,475,489,502,517,531,543,558,572,586,600,614,626,640,654,669,683,697,711],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1135045,2,"多选题","高速公路通信系统的组成有()。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","光纤数字传输系统",true,{"key":24,"text":25,"correct":22},"B","数字程控交换系统",{"key":27,"text":28,"correct":22},"C","紧急电话系统",{"key":30,"text":31,"correct":22},"D","通信管道工程",{"key":33,"text":34,"correct":35},"E","调度指令电话系统",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1135046,"柴油发电机组的安装要求有()",[42,44,46,48,50],{"key":20,"text":43,"correct":35},"发电机的无需做静态和运转试验",{"key":24,"text":45,"correct":22},"柴油发电机馈电线路连接后，两端的相序必须与原供电系统相序一致",{"key":27,"text":47,"correct":22},"发电机中性线（工作零线）应与接地干线直接连接",{"key":30,"text":49,"correct":22},"发电机组至低压配电柜馈电线路的相间、相对地间的绝缘电阻值应大于0.5MΩ",{"key":33,"text":51,"correct":35},"塑料绝缘电缆线路直流耐压试验为2.4kV，时间为5min，泄漏电流稳定，无击穿现象","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1135047,"公路低压配电系统中的接地的形式有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"TN-S系统",{"key":24,"text":60,"correct":22},"TN-C系统",{"key":27,"text":62,"correct":22},"TN-C-S系统",{"key":30,"text":64,"correct":22},"TT系统",{"key":33,"text":66,"correct":35},"TM-TC系统",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1135048,"变电所由()组成。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"高、低压开关柜",{"key":24,"text":74,"correct":22},"变压器",{"key":27,"text":76,"correct":22},"继电保护装置",{"key":30,"text":78,"correct":35},"灯杆",{"key":33,"text":80,"correct":22},"测量信号、控制装置","ABCE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1135049,"填方路基施工中，（ ）不得直接作为路堤填料；需要使用时，必须采取技术措施进行处理，经检验满足设计要求后方可使用。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"液限大于50%的细粒土",{"key":24,"text":89,"correct":22},"塑性指数大于26的细粒土",{"key":27,"text":91,"correct":35},"渗水性好的填料",{"key":30,"text":93,"correct":22},"含水量不适宜直接压实的细粒土",{"key":33,"text":95,"correct":35},"最大粒径小于150㎜的砂类土等粗粒土","ABD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1135050,"下列雨期可进行施工的地段有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"丘陵和山岭地区的砂类土",{"key":24,"text":104,"correct":22},"碎砾石和岩石地段",{"key":27,"text":106,"correct":22},"路堑的弃方地段",{"key":30,"text":108,"correct":35},"盐渍土地段",{"key":33,"text":110,"correct":35},"平原地区","ABC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":124,"analysis":37},1135051,"用于软基处理的粉煤灰垫层,可采用电厂排放的硅铝型低钙粉煤灰,其材料要求有（ ）。 A.烧失量宜大于12%",[116,118,120,122],{"key":20,"text":117,"correct":35},"CaO+MgO含量不应低于55%",{"key":24,"text":119,"correct":35},"最大粒径不宜大于2mm",{"key":27,"text":121,"correct":22},"最小粒径不宜小于0.05mm",{"key":30,"text":123,"correct":22},"小于0.075mm颗粒含量宜大于45%","CD",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":81,"analysis":37},1135052,"雨期路基施工地段一般应选择（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"砂类土地段",{"key":24,"text":132,"correct":22},"碎砾石地段",{"key":27,"text":134,"correct":22},"岩石地段",{"key":30,"text":136,"correct":35},"粘土地段",{"key":33,"text":106,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":111,"analysis":37},1135053,"在选择路堤填料时，严禁作为填料的土有（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"含生活垃圾的土",{"key":24,"text":145,"correct":22},"有机土、含草皮土",{"key":27,"text":147,"correct":22},"含腐殖质的土",{"key":30,"text":149,"correct":35},"盐渍土、黄土、膨胀土",{"key":33,"text":151,"correct":35},"液限大于50、塑性指数大于26的土",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":96,"analysis":37},1135054,"在雨期进行道路路堑开挖，正确的开挖措施有（ ）。",[156,158,160,162,164],{"key":20,"text":157,"correct":22},"土质路堑开挖前，在路堑边坡坡顶2m以外开挖截水沟并接通出水口",{"key":24,"text":159,"correct":22},"开挖土质路堑宜分层开挖，每挖一层均应设置排水纵横坡",{"key":27,"text":161,"correct":35},"挖方边坡一次挖到设计标高，防止沉降",{"key":30,"text":163,"correct":22},"土的强度低于规定值时应按设计要求进行处理",{"key":33,"text":165,"correct":35},"雨期开挖岩石路堑，炮眼应倾斜45°设置",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":36,"analysis":37},1135055,"主要用于排除地下水的方法有（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"支撑渗沟",{"key":24,"text":173,"correct":22},"暗沟",{"key":27,"text":175,"correct":22},"边坡渗沟",{"key":30,"text":177,"correct":22},"平孔",{"key":33,"text":179,"correct":35},"边沟",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":36,"analysis":37},1135056,"冬期施工开挖路堑表层冻土的方法有（ ）。",[184,186,188,190,192],{"key":20,"text":185,"correct":22},"爆破冻土法",{"key":24,"text":187,"correct":22},"机械破冻法",{"key":27,"text":189,"correct":22},"火烧法",{"key":30,"text":191,"correct":22},"蒸汽放热解冻法",{"key":33,"text":193,"correct":35},"人工开挖法",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":36,"analysis":37},1135057,"对路基范围内的陷穴进行处理的措施有（ ）。",[198,200,202,204,206],{"key":20,"text":199,"correct":22},"灌砂",{"key":24,"text":201,"correct":22},"导洞和竖井",{"key":27,"text":203,"correct":22},"灌浆",{"key":30,"text":205,"correct":22},"开挖回填",{"key":33,"text":207,"correct":35},"加压",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":111,"analysis":37},1135058,"关于滑坡地段路基的施工技术要点的说法中，正确的有（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"滑坡整治宜在旱季施工",{"key":24,"text":215,"correct":22},"施工时应采取措施截断流向滑坡体的地表水、地下水及临时用水",{"key":27,"text":217,"correct":22},"滑坡体未处理之前，严禁在滑坡体上增加荷载，严禁在滑坡前缘减载",{"key":30,"text":219,"correct":35},"采用削坡减载方案整治滑坡时，减载应自下而上进行，严禁超挖或乱挖，严禁爆破减载",{"key":33,"text":221,"correct":35},"采用加填压脚方案整治滑坡时，可以因为加填压脚土而堵塞原有地下水出口",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":36,"analysis":37},1135059,"关于填石路基填筑要求的说法正确的是（ ）。",[226,228,230,232,234],{"key":20,"text":227,"correct":22},"路堤施工前，应先修筑试验路段",{"key":24,"text":229,"correct":22},"边坡码砌与路基填筑宜同步进行",{"key":27,"text":231,"correct":22},"岩性相差较大的填料应分层或分段填筑",{"key":30,"text":233,"correct":22},"二级及二级以上公路的填石路堤应分层填筑压实",{"key":33,"text":235,"correct":35},"宜选用自重不小于18t的光轮压路机",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":249,"analysis":37},1135060,"关于雨期开挖路堑的说法，正确的有（ ）。",[240,241,243,245,247],{"key":20,"text":157,"correct":22},{"key":24,"text":242,"correct":22},"挖方边坡不宜一次挖到设计标高，应沿坡面留30cm厚",{"key":27,"text":244,"correct":35},"土质路堑挖至设计标高以上20～30cm时应停止开挖",{"key":30,"text":246,"correct":35},"雨期开挖岩石路堑，炮眼应尽量竖向设置",{"key":33,"text":248,"correct":22},"以挖作填的挖方应随挖随运随填","ABE",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":264,"analysis":37},1135061,"滑坡防治的工程措施主要有排水、力学平衡和改变滑带土三类，下列属于“力学平衡”类的有（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":35},"设置边坡渗沟",{"key":24,"text":257,"correct":22},"打设抗滑桩",{"key":27,"text":259,"correct":35},"焙烧法",{"key":30,"text":261,"correct":22},"反压土方",{"key":33,"text":263,"correct":22},"修建挡土墙","BDE",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":279,"analysis":37},1135062,"路堤宜选用级配较好的（ ）等粗粒土作为填料",[269,271,273,275,277],{"key":20,"text":270,"correct":35},"粉质土",{"key":24,"text":272,"correct":22},"砾类土",{"key":27,"text":274,"correct":22},"砂类土",{"key":30,"text":276,"correct":35},"有机土",{"key":33,"text":278,"correct":35},"液限大于50%、塑性指数大于26的土","BC",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":290,"analysis":37},1135063,"排除滑坡地下水的方法有（ ）。",[284,286,287,288,289],{"key":20,"text":285,"correct":35},"跌水井",{"key":24,"text":171,"correct":22},{"key":27,"text":175,"correct":22},{"key":30,"text":173,"correct":22},{"key":33,"text":177,"correct":22},"BCDE",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":305,"analysis":37},1135064,"深孔爆破具有的优点有（ ）。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"劳动生产率高，一次爆破的方量多，施工进度快",{"key":24,"text":298,"correct":35},"比较灵活",{"key":27,"text":300,"correct":35},"作为其他炮型服务的辅助炮型",{"key":30,"text":302,"correct":22},"爆破时比较安全",{"key":33,"text":304,"correct":35},"作为其他炮型服务的先导炮","AD",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":264,"analysis":37},1135065,"通过改变滑带土对滑坡防治的工程措施有（ ）。",[310,312,314,315,317],{"key":20,"text":311,"correct":35},"土方压脚",{"key":24,"text":313,"correct":22},"爆破灌浆法",{"key":27,"text":177,"correct":35},{"key":30,"text":316,"correct":22},"电渗排水",{"key":33,"text":259,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":332,"analysis":37},1135066,"以下一般属于小炮的有（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"钢钎炮",{"key":24,"text":325,"correct":22},"深孔爆破",{"key":27,"text":327,"correct":35},"洞室炮",{"key":30,"text":329,"correct":35},"猫洞炮",{"key":33,"text":331,"correct":35},"用药量1t以上的炮","AB",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":111,"analysis":37},1135067,"关于土方路堤填筑要求，正确的有（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":22},"性质不同的填料，应水平分层、分段填筑、分层压实",{"key":24,"text":340,"correct":22},"同一水平层路基的全宽应采用同一种填料，不得混合填筑",{"key":27,"text":342,"correct":22},"每种填料的填筑层压实后的连续厚度不宜小于500mm",{"key":30,"text":344,"correct":35},"对潮湿或冻融敏感性小的填料应填筑在路基下层",{"key":33,"text":346,"correct":35},"每一填筑层压实后的宽度应等于设计宽度",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":361,"analysis":37},1135068,"石质路堑直接应用机械开挖的优点是（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":22},"没有钻爆工序作业",{"key":24,"text":354,"correct":35},"适于破碎坚硬岩石",{"key":27,"text":356,"correct":22},"不需要风、水、电辅助设施",{"key":30,"text":358,"correct":22},"简化了场地布置",{"key":33,"text":360,"correct":35},"没有爆破产生的公害","ACD",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":36,"analysis":37},1135069,"石质路堑钻爆开挖的方法有（ ）。",[366,368,370,372,374],{"key":20,"text":367,"correct":22},"薄层开挖",{"key":24,"text":369,"correct":22},"分层开挖",{"key":27,"text":371,"correct":22},"全断面一次开挖",{"key":30,"text":373,"correct":22},"特高梯段开挖",{"key":33,"text":375,"correct":35},"跳槽开挖",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":81,"analysis":37},1135070,"土质路堤填筑常用的机械有（ ）。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"铲运机",{"key":24,"text":383,"correct":22},"平地机",{"key":27,"text":385,"correct":22},"装载机",{"key":30,"text":387,"correct":35},"空压机",{"key":33,"text":389,"correct":22},"挖掘机",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":404,"analysis":37},1135071,"推土机开挖土质路堑的作业方法有（ ）。",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"下坡推土法",{"key":24,"text":397,"correct":22},"槽形推土法",{"key":27,"text":399,"correct":35},"上坡推土法",{"key":30,"text":401,"correct":22},"接力推土法",{"key":33,"text":403,"correct":22},"并列推土法","ABDE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":111,"analysis":37},1135072,"关于冬期开挖路堑的说法中，正确的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"当冻土层被开挖到未冻土后，应连续作业，分层开挖",{"key":24,"text":412,"correct":22},"挖方边坡不应一次挖到设计线，应预留一定厚度的覆盖层，待到正常施工季节再削去预留台阶，整理达到设计边坡",{"key":27,"text":414,"correct":22},"路堑挖至路床面以上1m时，挖好临时排水沟后，应停止开挖并在表面覆以雪或松土",{"key":30,"text":416,"correct":35},"冬期开挖路堑可以从下向上掏空挖“神仙土”",{"key":33,"text":418,"correct":35},"弃土堆高度最高可为5m，弃土堆坡脚到路堑边坡顶的距离一般不得小于3m",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":433,"analysis":37},1135073,"沿河路基直接防护有（ ）。",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"植物",{"key":24,"text":426,"correct":35},"丁坝",{"key":27,"text":428,"correct":22},"砌石",{"key":30,"text":430,"correct":22},"浸水挡土墙",{"key":33,"text":432,"correct":22},"石笼","ACDE",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":361,"analysis":37},1135074,"下列坡面防护型式中，属于圬工防护的有（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"锚杆钢丝网喷浆",{"key":24,"text":441,"correct":35},"浆砌片石骨架植草护坡",{"key":27,"text":443,"correct":22},"干砌片护坡",{"key":30,"text":445,"correct":22},"浆砌片石护坡",{"key":33,"text":447,"correct":35},"种草护坡",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":264,"analysis":37},1135075,"路基加固类型按路基加固的不同部位分为（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":35},"路基上边坡加固",{"key":24,"text":455,"correct":22},"坡面防护加固",{"key":27,"text":457,"correct":35},"路基下边坡加固",{"key":30,"text":459,"correct":22},"边坡支挡",{"key":33,"text":461,"correct":22},"湿弱地基加固",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":290,"analysis":37},1135076,"属于堤岸支挡的工程有（ ）。",[466,468,469,471,473],{"key":20,"text":467,"correct":35},"护肩墙",{"key":24,"text":432,"correct":22},{"key":27,"text":470,"correct":22},"抛石",{"key":30,"text":472,"correct":22},"护坡",{"key":33,"text":474,"correct":22},"浸水墙",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":332,"analysis":37},1135077,"湿弱地基加固的方式有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"挤密",{"key":24,"text":482,"correct":22},"换填土",{"key":27,"text":484,"correct":35},"反压护道",{"key":30,"text":486,"correct":35},"粉喷桩",{"key":33,"text":488,"correct":35},"土工织布",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":36,"analysis":37},1135078,"锚杆挡土墙的锚固工序包括有（ ）。",[493,495,497,498,500],{"key":20,"text":494,"correct":22},"养护",{"key":24,"text":496,"correct":22},"钻孔",{"key":27,"text":203,"correct":22},{"key":30,"text":499,"correct":22},"插入锚杆",{"key":33,"text":501,"correct":35},"勾缝",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":516,"analysis":37},1135079,"锚杆挡土墙按墙面的结构形式可分为（ ）锚杆挡土墙。",[506,508,510,512,514],{"key":20,"text":507,"correct":35},"肋板式",{"key":24,"text":509,"correct":22},"柱板式",{"key":27,"text":511,"correct":35},"桩板式",{"key":30,"text":513,"correct":35},"框架式",{"key":33,"text":515,"correct":22},"壁板式","BE",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":249,"analysis":37},1135080,"填石渗沟、管式渗沟和洞式渗沟均应设置（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"排水层（或管、洞）",{"key":24,"text":524,"correct":22},"反滤层",{"key":27,"text":526,"correct":35},"透水层",{"key":30,"text":528,"correct":35},"防冻层",{"key":33,"text":530,"correct":22},"封闭层",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":96,"analysis":37},1135081,"管式渗沟壑填石沟均应设置（ ）。",[535,537,538,540,541],{"key":20,"text":536,"correct":22},"排水层",{"key":24,"text":524,"correct":22},{"key":27,"text":539,"correct":35},"透层",{"key":30,"text":530,"correct":22},{"key":33,"text":542,"correct":35},"粘层",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":557,"analysis":37},1135082,"填石渗沟的形状通常为（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":35},"圆形",{"key":24,"text":550,"correct":35},"三角形",{"key":27,"text":552,"correct":35},"菱形",{"key":30,"text":554,"correct":22},"梯形",{"key":33,"text":556,"correct":22},"矩形","DE",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":111,"analysis":37},1135083,"下列关于对急流槽的施工要求描述正确的有（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"急流槽必须用浆砌圬工结构",{"key":24,"text":565,"correct":22},"急流槽的纵坡不宜超过1：1.5，同时应与天然地面坡度相配合",{"key":27,"text":567,"correct":22},"当急流槽很长时，应分段砌筑，每段不宜超过10m",{"key":30,"text":569,"correct":35},"当急流槽较长时，槽底可用几个纵坡，一般是上段较缓，向下逐渐放陡",{"key":33,"text":571,"correct":35},"急流槽的平面转弯半径应大于20m",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":361,"analysis":37},1135084,"可利用全站仪进行的测量工作有（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":22},"水平角测量",{"key":24,"text":579,"correct":35},"磁方位角测量",{"key":27,"text":581,"correct":22},"竖直角测量",{"key":30,"text":583,"correct":22},"距离测量",{"key":33,"text":585,"correct":35},"气压测量",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":332,"analysis":37},1135085,"可用于中线放样的仪器有（ ）。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"GPS测量仪",{"key":24,"text":593,"correct":22},"全站仪",{"key":27,"text":595,"correct":35},"水准仪",{"key":30,"text":597,"correct":35},"罗盘仪",{"key":33,"text":599,"correct":35},"手持红外仪",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":36,"analysis":37},1135086,"在公路施工中，GPS可用于（ ）。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"隧道控制测量",{"key":24,"text":607,"correct":22},"特大桥控制测量",{"key":27,"text":609,"correct":22},"公路中线放样",{"key":30,"text":611,"correct":22},"公路边桩放样",{"key":33,"text":613,"correct":35},"水准点基平测量",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":625,"analysis":37},1135087,"坐标法放样的仪器有（ ）。",[618,619,620,622,624],{"key":20,"text":595,"correct":35},{"key":24,"text":593,"correct":22},{"key":27,"text":621,"correct":35},"红外仪",{"key":30,"text":623,"correct":22},"GPS接收仪",{"key":33,"text":597,"correct":35},"BD",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":332,"analysis":37},1135088,"某高速公路采用坐标法进行中线放样，需要的资料有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"导线点及其坐标",{"key":24,"text":633,"correct":22},"逐桩坐标表",{"key":27,"text":635,"correct":35},"直线曲线转角表",{"key":30,"text":637,"correct":35},"路基设计表",{"key":33,"text":639,"correct":35},"交点里程",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":290,"analysis":37},1135089,"路基压实过程施工中导致局部出现“弹簧”现象，可能原因有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":35},"在最佳含水量下压实",{"key":24,"text":647,"correct":22},"压路遍数不足",{"key":27,"text":649,"correct":22},"局部有漏压现象",{"key":30,"text":651,"correct":22},"填土颗粒过大",{"key":33,"text":653,"correct":22},"异类土壤混填",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":668,"analysis":37},1135090,"路堤边坡的常见病害有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":35},"湿土翻晒",{"key":24,"text":661,"correct":35},"急于赶工",{"key":27,"text":663,"correct":22},"冲沟",{"key":30,"text":665,"correct":22},"表层溜坍",{"key":33,"text":667,"correct":22},"滑坡","CDE",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":433,"analysis":37},1135091,"产生边坡滑坡病害的原因有（ ）。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"路基基底存在软土且厚度不均",{"key":24,"text":676,"correct":35},"超宽填筑",{"key":27,"text":678,"correct":22},"填土速率过快",{"key":30,"text":680,"correct":22},"换填土时清淤不彻底",{"key":33,"text":682,"correct":22},"路基填筑层有效宽度不够，边坡二期贴补",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":290,"analysis":37},1135092,"高填方路基沉降主要由施工方面造成的原因有（ ）",[687,689,691,693,695],{"key":20,"text":688,"correct":35},"施工时压路机功效过大",{"key":24,"text":690,"correct":22},"路基填料中混入种植土",{"key":27,"text":692,"correct":22},"填筑顺序不当",{"key":30,"text":694,"correct":22},"压实不足",{"key":33,"text":696,"correct":22},"在填挖交界处没有挖台阶",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":668,"analysis":37},1135093,"预防路基纵向开裂甚至形成错台的措施有（ ）。",[701,703,705,707,709],{"key":20,"text":702,"correct":35},"路基填料禁止直接使用液限大于50、塑性指数大于26的土；当选材困难，必须直接使用时，应采取相应的技术措施",{"key":24,"text":704,"correct":35},"不同种类的土应分层填筑，同一填筑层不得混用",{"key":27,"text":706,"correct":22},"彻底清除沟、塘淤泥，并选用水稳性好的材料严格分层回填，严格控制压实度满足设计要求",{"key":30,"text":708,"correct":22},"提高填筑层压实均匀度",{"key":33,"text":710,"correct":22},"半填半挖路段，地面横坡大于1：5及旧路利用路段，应严格按规范要求将原地面挖成宽度不小于1.0m的台阶并压实",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":124,"analysis":37},1135094,"级配碎石可用于各级公路的（ ）。",[715,717,719,721,723],{"key":20,"text":716,"correct":35},"上面层",{"key":24,"text":718,"correct":35},"下面层",{"key":27,"text":720,"correct":22},"基层",{"key":30,"text":722,"correct":22},"底基层",{"key":33,"text":724,"correct":35},"连接层",[726,730,733,736,739,742],{"id":727,"name":728,"category":7,"favorite":729},1,"领导干部任职前廉政法规知识测试题",92,{"id":731,"name":732,"category":7,"favorite":727},595,"建筑结构与设备",{"id":734,"name":735,"category":7,"favorite":727},715,"招标采购专业知识与法律法规",{"id":737,"name":738,"category":7,"favorite":727},848,"市政方向-通用基础",{"id":740,"name":741,"category":7,"favorite":8},534,"BIM工程师",{"id":743,"name":741,"category":7,"favorite":8},535]