[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,24,50,1523,[13,38,53,68,82,97,112,127,141,156,170,185,199,213,227,242,257,271,286,300,311,324,339,352,366,377,391,405,419,432,446,460,474,488,502,516,530,544,558,572,586,601,616,630,645,659,673,688,702,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1134945,2,"多选题","某一非关键工作（工序）的持续时间为5d;它的总时差为4d、自由时差为2d，在进度检查时发现拖延了7d。以下论述正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","该工程的工期将拖延2d",false,{"key":24,"text":25,"correct":26},"B","该工程的工期将拖延3d",true,{"key":28,"text":29,"correct":22},"C","该工序已经转变为关键工序，而且关键线路至少增加一条",{"key":31,"text":32,"correct":26},"D","如果该工序拖延2d对后续工序无影响，对总工期也无影响",{"key":34,"text":35,"correct":22},"E","由于上述拖延是发生在非关键工作中，即使是业主原因，也不批准工期延长的申请","BD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1134946,"有关工程进度曲线论述正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"工程接近完工时曲线为凸形",{"key":24,"text":45,"correct":26},"曲线呈凹形说明进度加快",{"key":28,"text":47,"correct":26},"当斜率为零表明停工",{"key":31,"text":49,"correct":22},"可反映资源需要量及其供应",{"key":34,"text":51,"correct":26},"分析“S”曲线的形状可定性分析施工内容安排的合理性","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1134947,"在对进度计划进行施工准备的可靠性审查时，应重点审查（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工总工期的安排应符合合同工期",{"key":24,"text":60,"correct":26},"主要骨干人员及施工队伍的进场日期已经落实",{"key":28,"text":62,"correct":22},"各项施工方案和施工方法应与施工经验和技术水平相适应",{"key":31,"text":64,"correct":22},"对动员、清场、假日及天气影响的时间，应有充分的考虑并留有余地",{"key":34,"text":66,"correct":26},"所需主要材料和设备的运送日期已有保证","BE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},1134948,"路面各结构层线性流水施工时，影响路面流水工期的因素有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"各结构层的持续时间",{"key":24,"text":75,"correct":26},"搭接类型",{"key":28,"text":77,"correct":26},"搭接时距",{"key":31,"text":79,"correct":22},"采用的计算方法",{"key":34,"text":81,"correct":26},"每个影响施工段的因素",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1134949,"路面各结构层的持续时间的考虑因素有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"水泥稳定碎石的延迟时间",{"key":24,"text":89,"correct":26},"沥青材料的拌合能力",{"key":28,"text":91,"correct":26},"沥青混合料的温度要求",{"key":31,"text":93,"correct":26},"无机稳定类材料的养护时间",{"key":34,"text":95,"correct":22},"最大工作面的要求","ABCD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1134950,"要求间歇是指（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"技术间歇",{"key":24,"text":104,"correct":22},"总时差",{"key":28,"text":106,"correct":26},"组织间歇",{"key":31,"text":108,"correct":22},"空间间歇",{"key":34,"text":110,"correct":22},"强制时限","AC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1134951,"关于顺序作业法特点的描述，正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"充分利用了工作面进行施工",{"key":24,"text":119,"correct":26},"每天投入施工的劳动力、材料和机具的种类比较少，有利于资源供应的组织工作",{"key":28,"text":121,"correct":26},"施工现场的组织、管理比较简单",{"key":31,"text":123,"correct":26},"（总）工期较长",{"key":34,"text":125,"correct":22},"必须按工艺专业化原则成立专业作业队","BCD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":140,"analysis":37},1134952,"顺序作业法（也称为依次作业法）的主要特点有（ ）。",[131,133,135,136,138],{"key":20,"text":132,"correct":26},"没有充分利用工作面进行施工",{"key":24,"text":134,"correct":22},"用于需要突击性施工时施工作业的组织",{"key":28,"text":121,"correct":26},{"key":31,"text":137,"correct":22},"专业化作业队能够连续作业",{"key":34,"text":139,"correct":26},"有利于资源供应的组织工作","ACE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1134953,"对“S”曲线描述正确的是（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"是工程进度的表达",{"key":24,"text":148,"correct":22},"是对质量的统计分析",{"key":28,"text":150,"correct":26},"又称为现金流动曲线",{"key":31,"text":152,"correct":26},"以工期为横轴",{"key":34,"text":154,"correct":26},"以累计完成的工程费用的百分比为纵轴","ACDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":140,"analysis":37},1134954,"技术交底的主要内容中第二级交底内容包括（）",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"分部分项工程施工方案",{"key":24,"text":163,"correct":22},"季节性施工措施",{"key":28,"text":165,"correct":26},"危险性较大的分部分项施工方案",{"key":31,"text":167,"correct":22},"分部、分项工程的概算编制",{"key":34,"text":169,"correct":26},"重大危险源的应急救援措施",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1134955,"图纸会审的主要内容有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"施工图是否符合业主要求",{"key":24,"text":177,"correct":26},"需要设计优化或计划进行重大变更设计的，项目部要提前策划，多方沟通，并通过图纸会审文件的形式加以确认",{"key":28,"text":179,"correct":26},"工程主要结构的受力条件及主要设计数据",{"key":31,"text":181,"correct":26},"核算工程数量，检查其中错漏碰缺",{"key":34,"text":183,"correct":26},"图纸的份数及说明是否齐全、明确","BCDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":96,"analysis":37},1134956,"现场质量检查控制的方法主要有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":26},"测量",{"key":24,"text":192,"correct":26},"试验",{"key":28,"text":194,"correct":26},"观察",{"key":31,"text":196,"correct":26},"分析",{"key":34,"text":198,"correct":22},"监理",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":155,"analysis":37},1134957,"属于土方路基工程施工质量控制关键点的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"施工放样与断面测量",{"key":24,"text":206,"correct":22},"确保路基的压实度、弯沉值、平整度",{"key":28,"text":208,"correct":26},"控制每层的松铺厚度",{"key":31,"text":210,"correct":26},"正确确定土的最大干密度",{"key":34,"text":212,"correct":26},"控制填土的含水量，确保压实度达到设计要求",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":126,"analysis":37},1134958,"路基压实度的常用检测方法有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"贝克曼梁法",{"key":24,"text":220,"correct":26},"灌砂法",{"key":28,"text":222,"correct":26},"环刀法",{"key":31,"text":224,"correct":26},"核子密度湿度仪法",{"key":34,"text":226,"correct":22},"超声波检测",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1134959,"质量控制关键点的实际效果表现在（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"施工质量管理水平",{"key":24,"text":234,"correct":26},"各项指标的实现情况",{"key":28,"text":236,"correct":22},"工程项目总体质量情况",{"key":31,"text":238,"correct":22},"施工项目方针目标管理水平",{"key":34,"text":240,"correct":22},"工程项目中各阶段质量情况","AB",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1134960,"悬臂浇筑梁的实测项目中属于关键项目的有（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"混凝土强度",{"key":24,"text":249,"correct":22},"轴线偏位",{"key":28,"text":251,"correct":22},"顶面高程",{"key":31,"text":253,"correct":26},"断面尺寸",{"key":34,"text":255,"correct":22},"平整度","AD",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":96,"analysis":37},1134961,"在桥梁基础工程施工中，沉井施工的主要质量控制点有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"初始平面位置的控制",{"key":24,"text":264,"correct":26},"刃脚质量",{"key":28,"text":266,"correct":26},"下沉过程中沉井倾斜度与偏位的动态控制",{"key":31,"text":268,"correct":26},"封底混凝土的浇筑工艺确保封底混凝土的质量",{"key":34,"text":270,"correct":22},"基底表面松散层的清理",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1134962,"下列选项中不属于拱桥支架施工控制要点的是（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":26},"预制拼装",{"key":24,"text":278,"correct":26},"混凝土压注质量控制",{"key":28,"text":280,"correct":26},"墩顶实心段混凝土裂缝控制",{"key":31,"text":282,"correct":22},"支架沉降控制",{"key":34,"text":284,"correct":22},"拱架加载控制","ABC",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":299,"analysis":37},1134963,"桥梁下部实心墩的常见质量控制关键点包括（ ）。",[290,292,293,295,297],{"key":20,"text":291,"correct":22},"墩身与承台联结处混凝土裂缝控制",{"key":24,"text":280,"correct":22},{"key":28,"text":294,"correct":26},"墩身平面位置控制",{"key":31,"text":296,"correct":26},"墩身垂直度控制",{"key":34,"text":298,"correct":26},"模板接缝错台控制","CDE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":111,"analysis":37},1134964,"在薄壁墩与实心墩施工中，其控制要点不同之处有（ ）。",[304,305,306,307,309],{"key":20,"text":291,"correct":26},{"key":24,"text":298,"correct":22},{"key":28,"text":280,"correct":26},{"key":31,"text":308,"correct":22},"墩顶支座预埋件位置、数量控制",{"key":34,"text":310,"correct":22},"墩身锚固钢筋预埋质量控制",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":184,"analysis":37},1134965,"先简支后连续梁桥的施工质量控制要点有（ ）。",[315,316,318,320,322],{"key":20,"text":276,"correct":22},{"key":24,"text":317,"correct":26},"后浇段工艺控制",{"key":28,"text":319,"correct":26},"体系转换工艺控制",{"key":31,"text":321,"correct":26},"后浇段收缩控制",{"key":34,"text":323,"correct":26},"临时支座安装与拆除控制",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":338,"analysis":37},1134966,"在公路工程质量缺陷处理中，关于质量缺陷性质的确定，以下说法正确的是（ ）。",[328,330,332,334,336],{"key":20,"text":329,"correct":26},"了解和检查主要包括调查、检查质量试验检测报告、施工日志，施工工艺流程、施工机械情况以及气候情况等",{"key":24,"text":331,"correct":22},"了解和检查是在检测与试验基础上进行的",{"key":28,"text":333,"correct":26},"检测与试验，主要是检验该缺陷工程的有关技术指标，以便准确找出产生缺陷的原因，检测和试验的结果将作为确定缺陷性质的主要依据",{"key":31,"text":335,"correct":26},"专门调研法由于对缺陷问题的妥善解决作用重大，因此经常被采用",{"key":34,"text":337,"correct":22},"采用专门调研法时，参与调查的专家或专题调查组由承包人组织","ACD",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":52,"analysis":37},1134967,"属于路基质量检验中土方路基实测项目的有（ ）。",[343,345,347,349,351],{"key":20,"text":344,"correct":26},"压实度",{"key":24,"text":346,"correct":26},"弯沉值",{"key":28,"text":348,"correct":26},"宽度",{"key":31,"text":350,"correct":22},"土的强度",{"key":34,"text":255,"correct":26},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":365,"analysis":37},1134968,"水泥混凝土面层实测项目中包含（ ）。",[356,358,360,361,363],{"key":20,"text":357,"correct":26},"中线平面偏位",{"key":24,"text":359,"correct":26},"弯拉强度",{"key":28,"text":346,"correct":22},{"key":31,"text":362,"correct":26},"抗滑构造深度",{"key":34,"text":364,"correct":22},"抗剪强度","ABD",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":52,"analysis":37},1134969,"沥青路面检测中除平整度、纵断高程、厚度外，还应检测（ ）。",[370,371,373,374,376],{"key":20,"text":348,"correct":26},{"key":24,"text":372,"correct":26},"横坡",{"key":28,"text":346,"correct":26},{"key":31,"text":375,"correct":22},"含水量",{"key":34,"text":344,"correct":26},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":184,"analysis":37},1134970,"桥梁总体实测项目有（ ）。",[381,383,385,387,389],{"key":20,"text":382,"correct":22},"桥梁跨径",{"key":24,"text":384,"correct":26},"桥面宽度",{"key":28,"text":386,"correct":26},"桥长",{"key":31,"text":388,"correct":26},"桥面中线偏位",{"key":34,"text":390,"correct":26},"桥梁中心线的衔接以及桥头高程衔接",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":96,"analysis":37},1134971,"钻孔灌注桩实测项目有（ ）。",[395,397,399,401,403],{"key":20,"text":396,"correct":26},"沉淀厚度",{"key":24,"text":398,"correct":26},"钻孔倾斜度",{"key":28,"text":400,"correct":26},"孔深",{"key":31,"text":402,"correct":26},"桩位",{"key":34,"text":404,"correct":22},"钢筋骨架顶面高程",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":126,"analysis":37},1134972,"钢筋加工及安装施工的实测项目中，属于非关键项目的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"受力钢筋间距",{"key":24,"text":412,"correct":26},"箍筋、横向水平钢筋、螺旋筋间距",{"key":28,"text":414,"correct":26},"钢筋骨架尺寸",{"key":31,"text":416,"correct":26},"弯起钢筋位置",{"key":34,"text":418,"correct":22},"保护层厚度",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":299,"analysis":37},1134973,"梁（板）预制实测项目包括（ ）。",[423,425,427,428,430],{"key":20,"text":424,"correct":22},"支座中心偏位",{"key":24,"text":426,"correct":22},"倾斜度",{"key":28,"text":247,"correct":26},{"key":31,"text":429,"correct":26},"梁长度",{"key":34,"text":431,"correct":26},"预埋件位置",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":52,"analysis":37},1134974,"公路施工现场临时用电的基本原则有（ ）。",[436,438,440,442,444],{"key":20,"text":437,"correct":26},"必须采用TN-S接地、接零保护系统",{"key":24,"text":439,"correct":26},"必须按照三级配电二级保护",{"key":28,"text":441,"correct":26},"人员必须取得证书方可上岗",{"key":31,"text":443,"correct":22},"必须采用优化配电线路的原则",{"key":34,"text":445,"correct":26},"用电设备必须实行“一机、一闸、一漏、一箱”制",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":184,"analysis":37},1134975,"特种设备检验合格后，使用单位应携带使用证和（ ）到有关主管部门办理年审换证手续。",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"购买设备的发票",{"key":24,"text":453,"correct":26},"检验合格标志",{"key":28,"text":455,"correct":26},"检验报告",{"key":31,"text":457,"correct":26},"保养合同",{"key":34,"text":459,"correct":26},"保养单位的保养资质",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":140,"analysis":37},1134976,"应急救援预案按类别分有（ ）几种。",[464,466,468,470,472],{"key":20,"text":465,"correct":26},"综合应急预案",{"key":24,"text":467,"correct":22},"企业级应急预案",{"key":28,"text":469,"correct":26},"专项应急预案",{"key":31,"text":471,"correct":22},"项目级应急预案",{"key":34,"text":473,"correct":26},"现场处置方案",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":285,"analysis":37},1134977,"工期延误按索赔结果分为（ ）延误。",[478,480,482,484,486],{"key":20,"text":479,"correct":26},"可原谅可补偿",{"key":24,"text":481,"correct":26},"可原谅不可补偿",{"key":28,"text":483,"correct":26},"不可原谅",{"key":31,"text":485,"correct":22},"关键性",{"key":34,"text":487,"correct":22},"非关键性",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":96,"analysis":37},1134978,"除专用合同条款另有约定外，因变更引起的价格调整约定有（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":26},"如果取消某项工作，则该项工作的总额价不予支付",{"key":24,"text":495,"correct":26},"已标价工程量清单中有适用于变更工作的子目的，采用该子目的单价",{"key":28,"text":497,"correct":26},"已标价工程量清单中无适用于变更工作的子目、但有类似子目的，可在合理范围内参照类似子目的单价，由监理工程师按合同约定商定或确定变更工作的单价",{"key":31,"text":499,"correct":26},"已标价工程量清单中无适用或类似子目的单价，可在综合考虑承包人在投标时所提供的单价分析表的基础上，由监理人按合同约定商定或确定变更工作的单价",{"key":34,"text":501,"correct":22},"如果本工程的变更指示是因双方过错或双方责任造成的，则发包人只承担50%这种引起的任何额外费用",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":52,"analysis":37},1134979,"公路工程变更包括（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"设计变更",{"key":24,"text":509,"correct":26},"进度计划变更",{"key":28,"text":511,"correct":26},"施工条件变更",{"key":31,"text":513,"correct":22},"人员资质变更",{"key":34,"text":515,"correct":26},"原招标文件和工程量清单中未包括的“新增工程”",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":52,"analysis":37},1134980,"建立完整的合同管理制度包括（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":26},"合同审查批准制度",{"key":24,"text":523,"correct":26},"合同档案管理制度",{"key":28,"text":525,"correct":26},"合同管理绩效考核制度",{"key":31,"text":527,"correct":22},"合同管理的公证制度",{"key":34,"text":529,"correct":26},"印鉴及证书管理使用制度",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":285,"analysis":37},1134981,"按合同规定业主行使（ ），以确保工程目标的实现。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"工期控制权",{"key":24,"text":537,"correct":26},"质量检验权",{"key":28,"text":539,"correct":26},"工程计量权",{"key":31,"text":541,"correct":22},"费用审计权",{"key":34,"text":543,"correct":22},"资质认定权",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":96,"analysis":37},1134982,"施工成本核算的内容有（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":26},"人工费核算",{"key":24,"text":551,"correct":26},"材料费核算",{"key":28,"text":553,"correct":26},"机械使用费核算",{"key":31,"text":555,"correct":26},"其他直接费核算",{"key":34,"text":557,"correct":22},"规费核算",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":52,"analysis":37},1134983,"在施工实施阶段成本管理中，可以运用（ ）等方法，有效地控制工程成本。",[562,564,566,568,570],{"key":20,"text":563,"correct":26},"以目标成本控制成本支出",{"key":24,"text":565,"correct":26},"以施工方案控制资源消耗",{"key":28,"text":567,"correct":26},"用净值法进行工期成本的同步控制",{"key":31,"text":569,"correct":22},"计划成本偏差控制法",{"key":34,"text":571,"correct":26},"运用目标管理控制工程成本",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":52,"analysis":37},1134984,"在公路项目施工中，控制材料成本的方法有（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":26},"以预算价格来控制材料的采购成本",{"key":24,"text":579,"correct":26},"编制材料需要量计划和建立材料消耗台账",{"key":28,"text":581,"correct":26},"控制工序施工质量争取一次合格",{"key":31,"text":583,"correct":22},"提高水泥钢筋等主要材料的回收再利用率",{"key":34,"text":585,"correct":26},"实行限额领料控制材料领用数量",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":600,"analysis":37},1134985,"成本目标通常以（ ）来定量地表示。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"控制项目总成本额",{"key":24,"text":593,"correct":22},"控制项目的人工消耗率",{"key":28,"text":595,"correct":26},"项目成本总降低额",{"key":31,"text":597,"correct":22},"控制项目的材料节约率",{"key":34,"text":599,"correct":26},"项目成本总降低率","CE",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":615,"analysis":37},1134986,"按支付内容分类，支付可分为（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":22},"进度款支付",{"key":24,"text":608,"correct":26},"基本支付",{"key":28,"text":610,"correct":26},"附加支付",{"key":31,"text":612,"correct":22},"材料款支付",{"key":34,"text":614,"correct":22},"开工预付款支付","BC",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":52,"analysis":37},1134987,"按时间分类，支付可分为（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":26},"预先支付",{"key":24,"text":623,"correct":26},"期中支付",{"key":28,"text":625,"correct":26},"交工结算",{"key":31,"text":627,"correct":22},"竣工支付",{"key":34,"text":629,"correct":26},"最终结清",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":644,"analysis":37},1134988,"工程价款价差调整的主要方法有（ ）法几种。",[634,636,638,640,642],{"key":20,"text":635,"correct":26},"调值公式",{"key":24,"text":637,"correct":26},"调价文件计算",{"key":28,"text":639,"correct":22},"预算价格调整",{"key":31,"text":641,"correct":26},"实际价格调整",{"key":34,"text":643,"correct":26},"工程造价指数调整","ABDE",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":155,"analysis":37},1134989,"工程价款的主要结算方式有（ ）。",[649,651,653,655,657],{"key":20,"text":650,"correct":26},"按月结算",{"key":24,"text":652,"correct":22},"按工程量结算",{"key":28,"text":654,"correct":26},"竣工后一次结算",{"key":31,"text":656,"correct":26},"目标结算方式",{"key":34,"text":658,"correct":26},"双方约定的其他结算方式",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":184,"analysis":37},1134990,"关于工程量计量总原则的说法，正确的有（ ）。",[663,665,667,669,671],{"key":20,"text":664,"correct":22},"一切工程的计量，应由承包人提供符合精度要求的计量设备和条件，由监理工程师计算后确认",{"key":24,"text":666,"correct":26},"凡超过了图纸所示或监理工程师指示或同意的任何长度、面积或体积，都不予计量",{"key":28,"text":668,"correct":26},"模板、脚手架等材料应包括在工程量清单中所列的有关支付项目中，均不单独计量，不单独计量",{"key":31,"text":670,"correct":26},"所有工程项目，除个别注明者外，均采用我国法定的计量单位，即国际单位及国际单位制导出的辅助单位进行计量",{"key":34,"text":672,"correct":26},"任何工程项目的计量，均应按本规则规定或监理工程师书面指示进行",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":687,"analysis":37},1134991,"公路工程建筑安装工程费中的税金指按国家税法规定应计入建筑安装工程造价内的（ ）。",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"征地税",{"key":24,"text":680,"correct":26},"营业税",{"key":28,"text":682,"correct":22},"个人所得税",{"key":31,"text":684,"correct":26},"教育费附加",{"key":34,"text":686,"correct":26},"城市建设维护税","BDE",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":140,"analysis":37},1134992,"投标报价的组成中，属于措施费的有（ ）。",[692,694,696,698,700],{"key":20,"text":693,"correct":26},"冬、雨期施工增加费",{"key":24,"text":695,"correct":22},"养老保险费",{"key":28,"text":697,"correct":26},"夜间施工增加费",{"key":31,"text":699,"correct":22},"内险费",{"key":34,"text":701,"correct":26},"施工辅助费",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":716,"analysis":37},1134993,"计日工是指在工程实施过程中，业主有一些临时性的或新增加的项目需要按计日（或计量）使用人工和（ ）所需的费用。",[706,708,710,712,714],{"key":20,"text":707,"correct":26},"材料",{"key":24,"text":709,"correct":22},"延长工期",{"key":28,"text":711,"correct":22},"风险",{"key":31,"text":713,"correct":22},"资金周转",{"key":34,"text":715,"correct":26},"施工机械","AE",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":140,"analysis":37},1134994,"工程量清单中有标价的单价或总额包括了工、料、机、管理、利润、缺陷修复、税金等费用，以及合同中明示或暗示的所有（ ）。",[721,723,725,727,729],{"key":20,"text":722,"correct":26},"责任",{"key":24,"text":724,"correct":22},"权利",{"key":28,"text":726,"correct":26},"义务",{"key":31,"text":728,"correct":22},"保险",{"key":34,"text":730,"correct":26},"一般风险",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]