[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,23,50,1523,[13,38,53,67,82,97,112,127,142,157,171,186,199,213,228,243,257,271,285,299,313,327,342,356,370,384,398,412,425,440,454,468,482,496,510,524,536,549,563,575,589,602,616,630,645,660,672,686,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1134887,2,"多选题","斜拉桥主梁施工方法有（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","顶推法",true,{"key":24,"text":25,"correct":22},"B","平转法",{"key":27,"text":28,"correct":22},"C","支架法",{"key":30,"text":31,"correct":32},"D","竖转法",false,{"key":34,"text":35,"correct":22},"E","悬臂法","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1134888,"采用缆索吊装的预制拱肋，必须对（）等状况下的拱肋强度进行验算。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"吊装",{"key":24,"text":45,"correct":22},"搁置",{"key":27,"text":47,"correct":22},"悬挂",{"key":30,"text":49,"correct":22},"安装",{"key":34,"text":51,"correct":32},"临时连接","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1134889,"下列情形中，可能导致钻孔灌注桩断桩的有（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"集料级配差，混凝土和易性差",{"key":24,"text":60,"correct":22},"导管埋深过大，管口混凝土已凝固",{"key":27,"text":62,"correct":22},"混凝土浇筑时间超过混凝土初凝时间",{"key":30,"text":64,"correct":22},"混凝土浇筑过程中导管埋置深度偏小",{"key":34,"text":66,"correct":32},"在钢筋笼制作时，采用对焊连接钢筋",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1134890,"为保证悬臂浇筑钢筋混凝土箱梁梁底高程在设计范围内，下列说法正确的有（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"对挂篮预压消除非弹性变形",{"key":24,"text":74,"correct":32},"选在一天中温度变化较大的时间段进行挠度观测",{"key":27,"text":76,"correct":22},"在0号块上建立相对坐标系，并定期复核",{"key":30,"text":78,"correct":32},"选择先中跨、后边跨的合龙顺序",{"key":34,"text":80,"correct":22},"严格控制施工中不平衡荷载大小与分布","ACE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1134891,"关于钢筋焊接施工的说法，正确的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"焊工必须经项目部培训且考核合格后才能上岗",{"key":24,"text":89,"correct":32},"钢筋的纵向焊接不得采用电弧焊",{"key":27,"text":91,"correct":22},"钢筋焊接前应先进行试焊，合格后方可正式施焊",{"key":30,"text":93,"correct":22},"受力钢筋焊接接头应设置在内力较小处",{"key":34,"text":95,"correct":22},"受力钢筋焊接接头应错开布置","CDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1134892,"下列桥梁设计计算荷载中，属于偶然作用的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"船舶的撞击作用",{"key":24,"text":104,"correct":32},"汽车制动力",{"key":27,"text":106,"correct":22},"汽车撞击作用",{"key":30,"text":108,"correct":32},"地震作用",{"key":34,"text":110,"correct":32},"冰压力","AC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1134893,"下列关于钢桥的主要特点的说法，正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":32},"钢材材质均匀，工作可靠度高，其抗拉.抗压都较高，但抗剪强度较低",{"key":24,"text":119,"correct":22},"钢材塑性和韧性好，抗冲击和振动能力高，不易突然断裂破坏",{"key":27,"text":121,"correct":22},"钢桥在受到破坏后，易于修复和更换，适宜于战备和灾害恢复的快速抢修",{"key":30,"text":123,"correct":32},"钢桥与其他桥梁相比，其养护费用较低",{"key":34,"text":125,"correct":22},"钢桥的构件适合于工业化生产制造，便于运输，工地安装速度快，效率高","BCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1134894,"桥梁悬臂浇筑施工中的挂篮，按结构形式划分包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":32},"自锚式",{"key":24,"text":134,"correct":22},"桁架式",{"key":27,"text":136,"correct":22},"预应力束斜拉式",{"key":30,"text":138,"correct":22},"三角斜拉带式",{"key":34,"text":140,"correct":32},"滑移式","BCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1134895,"下列施工机具设备中属于悬索桥下部结构施工要使用的主要机具设备有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"起重设备",{"key":24,"text":149,"correct":22},"测量及试验仪器设备",{"key":27,"text":151,"correct":22},"钢筋加工设备",{"key":30,"text":153,"correct":32},"紧缆机",{"key":34,"text":155,"correct":32},"加劲梁吊装设备","ABC",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":36,"analysis":37},1134896,"下列属于导致桥梁伸缩缝损坏的因素有（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"交通流量增大，超载车辆增多，超出了设计",{"key":24,"text":164,"correct":22},"对于大跨径桥梁伸缩缝结构设计技术不成熟",{"key":27,"text":166,"correct":22},"伸缩装置两侧填充混凝土强度.养护时间.粘结性和平整度未达到设计标准",{"key":30,"text":168,"correct":32},"桥台台后填土含水量过大",{"key":34,"text":170,"correct":22},"通行期间，填充到伸缩缝内的外来物未能及时清除",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1134897,"适合采用顶推法施工的桥梁有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"等曲率曲线桥",{"key":24,"text":178,"correct":32},"多跨变高梁桥",{"key":27,"text":180,"correct":32},"竖向曲率大的桥梁",{"key":30,"text":182,"correct":22},"宽深河道上的下承式钢管拱桥",{"key":34,"text":184,"correct":22},"等截面钢桁梁桥","ADE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":198,"analysis":37},1134898,"适用于变截面连续箱梁施工的方法有（）",[190,191,193,194,196],{"key":20,"text":21,"correct":32},{"key":24,"text":192,"correct":22},"悬臂浇筑法",{"key":27,"text":28,"correct":22},{"key":30,"text":195,"correct":22},"转体施工法",{"key":34,"text":197,"correct":22},"悬臂拼装法","BCDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":96,"analysis":37},1134899,"关于人工挖孔桩施工安全要求正确的是（）",[203,205,207,209,211],{"key":20,"text":204,"correct":32},"桩孔内的作业人员系安全带安全绳必须系在孔底。",{"key":24,"text":206,"correct":32},"孔深大于15m时，必须采取机械强制通风措施",{"key":27,"text":208,"correct":22},"孔深不宜超过15m",{"key":30,"text":210,"correct":22},"孔径不宜小于1.2m.",{"key":34,"text":212,"correct":22},"作业人员在孔内连续作业不得超过2h",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1134900,"下列属于沉井下沉的方式包括（）",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"不排水下沉",{"key":24,"text":220,"correct":22},"排水下沉",{"key":27,"text":222,"correct":32},"水力吸泥",{"key":30,"text":224,"correct":32},"开挖土体",{"key":34,"text":226,"correct":32},"浮吊下沉","AB",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},1134901,"关于悬索桥锚碇的说法,错误的有（）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"承担主塔的重力及下压力",{"key":24,"text":235,"correct":32},"主要承担来自主缆的拉力",{"key":27,"text":237,"correct":32},"锚碇是悬索桥的主要承载构件",{"key":30,"text":239,"correct":32},"隧道式锚碇将其承担的荷裁传递给基岩",{"key":34,"text":241,"correct":22},"重力式锚碇主要借助基岩摩擦力抵抗主缆拉力","AE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":52,"analysis":37},1134902,"下列属于地下连续墙施工主要工序的是（）",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"挖槽",{"key":24,"text":250,"correct":22},"下放钢筋笼",{"key":27,"text":252,"correct":22},"浇筑混凝土",{"key":30,"text":254,"correct":22},"槽段间的连接",{"key":34,"text":256,"correct":32},"打入钢护筒",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":52,"analysis":37},1134904,"地下连续墙按墙体材料可分为（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"钢筋混凝土墙",{"key":24,"text":264,"correct":22},"塑性混凝土墙",{"key":27,"text":266,"correct":22},"后张预应力地下连续墙",{"key":30,"text":268,"correct":22},"钢制地下连续墙",{"key":34,"text":270,"correct":32},"现浇及预制组合墙",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":156,"analysis":37},1134906,"下列公路施工企业类别中，包含“三级资质”企业等级的有（）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"公路工程施工总承包企业",{"key":24,"text":278,"correct":22},"公路路面工程专业承包企业",{"key":27,"text":280,"correct":22},"公路隧道工程专业承包企业",{"key":30,"text":282,"correct":32},"公路交通工程专业承包企业（公路安全设施分项）",{"key":34,"text":284,"correct":32},"公路交通工程专业承包企业（公路机电工程分项）",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":81,"analysis":37},1134907,"不适用于卵石、漂石地质条件下灌注桩钻孔施工的机械有（）",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"螺旋钻机",{"key":24,"text":292,"correct":32},"冲击钻机",{"key":27,"text":294,"correct":22},"旋挖钻机",{"key":30,"text":296,"correct":32},"回转斗钻机",{"key":34,"text":298,"correct":22},"地质钻机",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":156,"analysis":37},1134908,"标后预算时，属于项目预算总成本的是（）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"直接工程费",{"key":24,"text":306,"correct":22},"其他工程费",{"key":27,"text":308,"correct":22},"现场管理费",{"key":30,"text":310,"correct":32},"企业管理费",{"key":34,"text":312,"correct":32},"利润",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":242,"analysis":37},1134909,"关于项目部驻地选址的说法，正确的有（）",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"可设在靠近项目现场的中间位置",{"key":24,"text":320,"correct":32},"可设在独立大桥下",{"key":27,"text":322,"correct":32},"应设在离集中爆破区300m以外",{"key":30,"text":324,"correct":32},"可设在互通匝道区",{"key":34,"text":326,"correct":22},"应设在周围无高频、高压电源的位置",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":341,"analysis":37},1134910,"关于水泥混凝土拌和设备的要求，正确的有（）",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"拌和设备应采用质量自动计量设备",{"key":24,"text":334,"correct":22},"减水剂应采用全自动电子称量设备",{"key":27,"text":336,"correct":32},"拌和用水应采用流量计计量",{"key":30,"text":338,"correct":22},"混凝土拌和应采用强制式拌和机",{"key":34,"text":340,"correct":32},"缓凝剂应采用流量计计量","ABD",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":242,"analysis":37},1134911,"计日工是指在工程实施过程中，业主有一些临时性的或新增加的项目，需要按计日使用人工和（ ）所需的费用。",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"材料",{"key":24,"text":349,"correct":32},"延长工期",{"key":27,"text":351,"correct":32},"风险",{"key":30,"text":353,"correct":32},"资金周转",{"key":34,"text":355,"correct":22},"施工机械",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":185,"analysis":37},1134912,"施工现场临时用电工程专用的电源中性点直接接地的220\u002F380V三相四线制低压电力系统，必须符合的规定有（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"采用TN—S接零保护系统",{"key":24,"text":363,"correct":32},"采用两级配电系统",{"key":27,"text":365,"correct":32},"采用三级保护系统",{"key":30,"text":367,"correct":22},"采用三级配电系统",{"key":34,"text":369,"correct":22},"采用二级保护系统",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":52,"analysis":37},1134914,"进度计划检查的方法常采用（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"横道图比较法",{"key":24,"text":377,"correct":22},"公路工程进度表",{"key":27,"text":379,"correct":22},"“S”曲线比较法",{"key":30,"text":381,"correct":22},"前锋线比较法",{"key":34,"text":383,"correct":32},"垂直图比较法",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":227,"analysis":37},1134916,"下列属于安全生产事故隐患排查两项达标的有（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"施工人员管理达标",{"key":24,"text":391,"correct":22},"施工现场安全防护达标",{"key":27,"text":393,"correct":32},"机械配置达标",{"key":30,"text":395,"correct":32},"材料检验达标",{"key":34,"text":397,"correct":32},"方案编制达标",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":198,"analysis":37},1134917,"铲运机不适宜在（ ）中施工。",[402,404,406,408,410],{"key":20,"text":403,"correct":32},"湿度小（含水量在25%以下）的松散砂土",{"key":24,"text":405,"correct":22},"地下水位高的潮湿地区",{"key":27,"text":407,"correct":22},"干燥的粉砂土",{"key":30,"text":409,"correct":22},"潮湿的黏土",{"key":34,"text":411,"correct":22},"沼泽地带",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":36,"analysis":37},1134918,"特种设备办理年审换证手续时需提供的资料包括（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"特种设备检验报告",{"key":24,"text":419,"correct":22},"特种设备保养合同",{"key":27,"text":421,"correct":22},"特种设备保养单位的保养资质",{"key":30,"text":423,"correct":32},"特种设备日常使用状态记录",{"key":34,"text":417,"correct":22},{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":439,"analysis":37},1134919,"根据《公路水运工程安全生产监督管理办法》（交通部令2007年第1号），施工单位在工程中使用（）前，应当组织有关单位进行验收，或者委托具有相应资质的检验检测机构进行验收，并在验收合格后30日内向当地交通主管部门登记。",[429,431,433,435,437],{"key":20,"text":430,"correct":22},"施工起重机械",{"key":24,"text":432,"correct":32},"施工测量仪器",{"key":27,"text":434,"correct":22},"整体提升式脚手架",{"key":30,"text":436,"correct":22},"滑模爬模",{"key":34,"text":438,"correct":22},"架桥机","ACDE",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":52,"analysis":37},1134920,"下列技术经济指标可以评价施工组织设计的有（ ）。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"施工周期",{"key":24,"text":447,"correct":22},"全员劳动生产率",{"key":27,"text":449,"correct":22},"各种资源的不均衡系数",{"key":30,"text":451,"correct":22},"综合机械化程度",{"key":34,"text":453,"correct":32},"工程进度曲线",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":198,"analysis":37},1134921,"施工总体部署的内容有（ ）。",[458,460,462,464,466],{"key":20,"text":459,"correct":32},"施工进度计划",{"key":24,"text":461,"correct":22},"项目组织机构设置",{"key":27,"text":463,"correct":22},"施工任务划分",{"key":30,"text":465,"correct":22},"拟定主要项目的施工方案",{"key":34,"text":467,"correct":22},"主要施工阶段工期分析",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":52,"analysis":37},1134923,"项目经理对项目安全生产工作负有的职责包括（ ）。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"建立项目安全生产责任制，实施相应的考核与奖惩",{"key":24,"text":475,"correct":22},"组织制定项目安全生产教育和培训计划",{"key":27,"text":477,"correct":22},"按规定配足项目专职安全生产管理人员",{"key":30,"text":479,"correct":22},"完善施工组织设计和专项施工方案",{"key":34,"text":481,"correct":32},"进行安全技术交底",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":81,"analysis":37},1134924,"应急预案体系由（ ）组成。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"综合应急预案",{"key":24,"text":489,"correct":32},"企业级应急预案",{"key":27,"text":491,"correct":22},"专项应急预案",{"key":30,"text":493,"correct":32},"项目级应急预案",{"key":34,"text":495,"correct":22},"现场处置方案",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":52,"analysis":37},1134927,"施工机械使用费中的不变费用包括（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"折旧费",{"key":24,"text":503,"correct":22},"大修理费",{"key":27,"text":505,"correct":22},"经常修理费",{"key":30,"text":507,"correct":22},"安装拆卸及辅助设置费",{"key":34,"text":509,"correct":32},"养路费及车船使用税",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":439,"analysis":37},1134928,"成本控制的方法有（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"以目标成本控制成本支出",{"key":24,"text":517,"correct":32},"以成本计划编制控制成本支出",{"key":27,"text":519,"correct":22},"以施工方案控制资源消耗",{"key":30,"text":521,"correct":22},"用净值法进行工期成本的同步控制",{"key":34,"text":523,"correct":22},"运用目标管理控制工程成本",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":341,"analysis":37},1134929,"下列关于水泥混凝土拌合站拌合设备要求的说法，正确的有（ ）。",[528,530,531,533,535],{"key":20,"text":529,"correct":22},"拌合设备应采用质量法自动计量设备",{"key":24,"text":334,"correct":22},{"key":27,"text":532,"correct":32},"拌合用水应采用流量计计量",{"key":30,"text":534,"correct":22},"混凝土拌合应采用强制式拌合机",{"key":34,"text":340,"correct":32},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":126,"analysis":37},1134931,"施工单位的专职安全生产管理人员应履行的职责包括（ ）。",[540,542,544,546,547],{"key":20,"text":541,"correct":32},"及时.如实报告生产安全事故并组织自救",{"key":24,"text":543,"correct":22},"督促落实本单位施工安全风险管控措施",{"key":27,"text":545,"correct":22},"组织或者参与本合同段施工应急救援演练",{"key":30,"text":475,"correct":32},{"key":34,"text":548,"correct":22},"及时排查.报告安全事故隐患，并督促落实事故隐患治理措施",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":36,"analysis":37},1134932,"公路工程竣工验收的主要工作内容包括（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"成立竣工验收委员会",{"key":24,"text":556,"correct":22},"听取公路工程质量监督报告及工程质量鉴定报告",{"key":27,"text":558,"correct":22},"检查工程实体质量.审查有关资料",{"key":30,"text":560,"correct":32},"检查施工自检报告.施工总结报告及施工资料",{"key":34,"text":562,"correct":22},"形成并通过竣工验收鉴定书",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":439,"analysis":37},1134933,"公路工程施工企业根据国家相关规定，结合公路工程特点，可分为（ ）。",[567,568,570,571,573],{"key":20,"text":276,"correct":22},{"key":24,"text":569,"correct":32},"通信系统工程分项承包企业",{"key":27,"text":278,"correct":22},{"key":30,"text":572,"correct":22},"公路路基工程专业承包企业",{"key":34,"text":574,"correct":22},"桥梁工程专业承包企业",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":198,"analysis":37},1134934,"根据《公路工程施工分包管理办法》，下列情形中，属于违法分包的有（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":32},"承包人将承包的全部工程发包给他人的",{"key":24,"text":582,"correct":22},"分包人以他人名义承揽分包工程的",{"key":27,"text":584,"correct":22},"分包合同未报发包人备案的",{"key":30,"text":586,"correct":22},"分包人将分包合同再进行分包的",{"key":34,"text":588,"correct":22},"承包人将工程给不具备相应资格的企业或个人的",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":36,"analysis":37},1134935,"交工验收的主要工作内容包括（ ）。",[593,595,596,598,600],{"key":20,"text":594,"correct":22},"检查施工合同的执行情况",{"key":24,"text":560,"correct":22},{"key":27,"text":597,"correct":22},"检查工程实体，审査有关资料",{"key":30,"text":599,"correct":32},"综合评价工程建设成果",{"key":34,"text":601,"correct":22},"对各参建单位工作进行初步评价",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":52,"analysis":37},1134936,"施工平面布置图的设计原则有（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"充分利用原有地形",{"key":24,"text":609,"correct":22},"场区规划必须科学合理",{"key":27,"text":611,"correct":22},"应尽量减少二次倒运和缩短运距",{"key":30,"text":613,"correct":22},"充分考虑水文等自然条件的影响",{"key":34,"text":615,"correct":32},"业主利益高于一切",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":52,"analysis":37},1134937,"施工平面图的内容有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"主要结构物平面位置",{"key":24,"text":623,"correct":22},"施工防排水临时设施",{"key":27,"text":625,"correct":22},"安全消防设施",{"key":30,"text":627,"correct":22},"便道和其他临时设施",{"key":34,"text":629,"correct":32},"现有地形地貌",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":644,"analysis":37},1134938,"公路工程施工平面布置图的设计原则包括（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"充分利用原有地形,地物,少占农田,因地制宜，以降低工程成本",{"key":24,"text":637,"correct":22},"充分考虑水文,地质,气象等自然条件的影响",{"key":27,"text":639,"correct":32},"充分考虑自身施工能力的影响",{"key":30,"text":641,"correct":22},"场内规划必须科学合理",{"key":34,"text":643,"correct":22},"必须符合安全生产,保安防火和文明施工的规定和要求","ABDE",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":659,"analysis":37},1134939,"资源利用的优化主要包括（ ）。",[649,651,653,655,657],{"key":20,"text":650,"correct":32},"施工顺序的优化",{"key":24,"text":652,"correct":32},"施工作业组织形式的优化",{"key":27,"text":654,"correct":32},"施工机械组织优化",{"key":30,"text":656,"correct":22},"物资采购与供应计划的优化",{"key":34,"text":658,"correct":22},"机械需要计划的优化","DE",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":52,"analysis":37},1134940,"施工方案优化主要包括（ ）。",[664,666,667,668,670],{"key":20,"text":665,"correct":22},"施工方法的优化",{"key":24,"text":650,"correct":22},{"key":27,"text":652,"correct":22},{"key":30,"text":669,"correct":22},"施工劳动组织优化",{"key":34,"text":671,"correct":32},"资源利用的优化",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":52,"analysis":37},1134941,"施工组织设计完成后，通过对“S”曲线的形状分析，可以（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"定性分析施工组织设计中工作内容安排的合理性",{"key":24,"text":679,"correct":22},"可利用“香蕉”曲线对进度进行合理安排",{"key":27,"text":681,"correct":22},"结合“香蕉”曲线进行施工中的进度控制",{"key":30,"text":683,"correct":22},"结合“香蕉”曲线进行施工中的费用控制",{"key":34,"text":685,"correct":32},"结合“香蕉”曲线进行施工中的合同控制",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":96,"analysis":37},1134942,"对于桥墩采用流水施工时应注意流水施工的相关时间参数有（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":32},"施工过程数",{"key":24,"text":693,"correct":32},"施工段数",{"key":27,"text":695,"correct":22},"流水节拍",{"key":30,"text":697,"correct":22},"流水步距",{"key":34,"text":699,"correct":22},"技术间歇",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":111,"analysis":37},1134943,"路面各结构层间采用搭接流水方式时主要的搭接类型有（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"STS",{"key":24,"text":707,"correct":32},"STF",{"key":27,"text":709,"correct":22},"FTF",{"key":30,"text":711,"correct":32},"FTS",{"key":34,"text":713,"correct":32},"FTE",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":242,"analysis":37},1134944,"路基工程施工组织设计应重点考虑的内容有（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"确定施工方法和土方调配",{"key":24,"text":721,"correct":32},"路上与基地统筹兼顾",{"key":27,"text":723,"correct":32},"布置好运料线",{"key":30,"text":725,"correct":32},"按均衡流水法组织施工",{"key":34,"text":727,"correct":22},"确定工地施工组织",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]