[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":732},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,22,50,1523,[13,38,53,66,80,95,109,124,138,153,167,182,197,211,226,241,254,268,283,298,313,327,341,355,368,382,396,410,425,439,452,466,480,494,507,521,535,549,564,578,591,605,620,634,648,662,676,690,705,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1134829,2,"多选题","粉煤灰路堤的组成包括（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","路堤主体部分",true,{"key":24,"text":25,"correct":22},"B","封顶层",{"key":27,"text":28,"correct":29},"C","透水层",false,{"key":31,"text":32,"correct":22},"D","隔离层",{"key":34,"text":35,"correct":22},"E","排水系统","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1134831,"路基中线放样的方法有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"切线支距法",{"key":24,"text":45,"correct":22},"偏角法",{"key":27,"text":47,"correct":22},"坐标法",{"key":31,"text":49,"correct":22},"GPS-RTK技术",{"key":34,"text":51,"correct":29},"水准法","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":65,"analysis":37},1134832,"某高速公路采用路基横断面边桩放样的方法有（ ）。",[57,59,61,63,64],{"key":20,"text":58,"correct":29},"图解法",{"key":24,"text":60,"correct":29},"计算法",{"key":27,"text":62,"correct":22},"渐近法",{"key":31,"text":47,"correct":22},{"key":34,"text":51,"correct":29},"CD",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":65,"analysis":37},1134833,"路基行车带施工中压实度不能满足质量标准要求，主要原因不包括（ ）。",[70,72,74,76,78],{"key":20,"text":71,"correct":29},"压实遍数不够",{"key":24,"text":73,"correct":29},"碾压不均匀，局部有漏压现象",{"key":27,"text":75,"correct":22},"换填土时清淤彻底",{"key":31,"text":77,"correct":22},"具有良好的路基顶面排水设施",{"key":34,"text":79,"correct":29},"土场土质种类多，出现不同类别土混填",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":94,"analysis":37},1134835,"宜增设水准点的区域有（ ）。",[84,86,88,90,92],{"key":20,"text":85,"correct":29},"道路转折点",{"key":24,"text":87,"correct":22},"在结构物附近",{"key":27,"text":89,"correct":22},"高填深挖路段",{"key":31,"text":91,"correct":22},"工程量集中",{"key":34,"text":93,"correct":22},"地形复杂路段","BCDE",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":52,"analysis":37},1134836,"GPS测设宜采用静态相对定位的有（ ）。",[99,101,103,105,107],{"key":20,"text":100,"correct":22},"大地测量",{"key":24,"text":102,"correct":22},"控制测量",{"key":27,"text":104,"correct":22},"变形测量",{"key":31,"text":106,"correct":22},"工程测量",{"key":34,"text":108,"correct":29},"碎部测量",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1134837,"土方路堤填筑时，要求压实度必须大于或等于96%的有（）",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"高速公路的上路床",{"key":24,"text":116,"correct":29},"高速公路的上路堤",{"key":27,"text":118,"correct":29},"二级公路的上路床",{"key":31,"text":120,"correct":22},"高速公路的下路床",{"key":34,"text":122,"correct":22},"高速公路的零填路基","ADE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":36,"analysis":37},1134838,"关于路基冬期施工的说法，正确的有（）。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"冬期填筑的路堤，每层每侧应超填并压实",{"key":24,"text":131,"correct":22},"挖填方交界处，填土低于1m的路堤都不应在冬期填筑",{"key":27,"text":133,"correct":29},"当路堤填至路床底面时，应碾压密实后停止填筑",{"key":31,"text":135,"correct":22},"当天填的土必须当天完成碾压",{"key":34,"text":137,"correct":22},"挖方边坡不应一次挖到设计线",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},1134839,"对产生“弹簧土”的路基进行有效治理的措施有（）",[142,144,146,148,150],{"key":20,"text":143,"correct":29},"增加碾压机械吨位",{"key":24,"text":145,"correct":29},"增加碾压遍数",{"key":27,"text":147,"correct":22},"对过湿土翻晒",{"key":31,"text":149,"correct":22},"掺适量生石灰粉翻拌",{"key":34,"text":151,"correct":22},"换填含水量适宜的良性土","CDE",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":52,"analysis":37},1134840,"导致路基行车带压实不足，甚至局部出现“弹簧”现象的主要原因有（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"压路机质量偏小",{"key":24,"text":160,"correct":22},"填料含水量过大",{"key":27,"text":162,"correct":22},"透水性差的土壤包裹透水性好的土壤",{"key":31,"text":164,"correct":22},"填土松铺厚度过大",{"key":34,"text":166,"correct":29},"压路机碾压速度过慢",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},1134841,"推土机填筑路堤作业时，影响作业效率的环节有（ ）。",[171,173,175,177,179],{"key":20,"text":172,"correct":22},"切土",{"key":24,"text":174,"correct":22},"推土",{"key":27,"text":176,"correct":29},"堆卸",{"key":31,"text":178,"correct":29},"空返",{"key":34,"text":180,"correct":29},"倒退","AB",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":196,"analysis":37},1134842,"下列能保证路基边缘压实度的措施有（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"控制碾压工艺，保证机具碾压到边",{"key":24,"text":189,"correct":22},"控制碾压顺序，确保轮迹重叠宽度",{"key":27,"text":191,"correct":29},"严格按照路基设计宽度填筑",{"key":31,"text":193,"correct":22},"确保边缘带碾压频率高于行车带",{"key":34,"text":195,"correct":29},"路基边缘漏压","ABD",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":65,"analysis":37},1134843,"以下属于洞室炮的有（ ）。",[201,203,205,207,209],{"key":20,"text":202,"correct":29},"钢钎炮",{"key":24,"text":204,"correct":29},"深孔爆破",{"key":27,"text":206,"correct":22},"药壶炮",{"key":31,"text":208,"correct":22},"猫洞炮",{"key":34,"text":210,"correct":29},"用药量1t以上的炮",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},1134844,"加筋土挡土墙施工工序中，需交叉进行的工序有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":29},"地基处理",{"key":24,"text":218,"correct":22},"墙面板安装",{"key":27,"text":220,"correct":29},"墙顶封闭",{"key":31,"text":222,"correct":22},"筋带铺设",{"key":34,"text":224,"correct":22},"填料填筑与压实","BDE",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},1134845,"路基施工前应及时对来源不同，性质不同的拟作为路堤填料的材料进行取样实验，一般土的试验项目包括（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"标准击实试验",{"key":24,"text":233,"correct":22},"CBR试验",{"key":27,"text":235,"correct":22},"液限和塑限",{"key":31,"text":237,"correct":29},"固结试验",{"key":34,"text":239,"correct":22},"天然含水率","ABCE",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":240,"analysis":37},1134846,"拟作为路堤填料的材料应取样试验，土的试验项目有（）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"液限",{"key":24,"text":248,"correct":22},"塑限",{"key":27,"text":250,"correct":22},"CBR值",{"key":31,"text":252,"correct":29},"弯沉",{"key":34,"text":239,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":225,"analysis":37},1134847,"关于乳化沥青碎石基层施工的说法，正确的有（）。",[258,260,262,264,266],{"key":20,"text":259,"correct":29},"乳化沥青碎石混合料必须采用拌合机拌合",{"key":24,"text":261,"correct":22},"混合料的拌合、运输、摊铺应在乳液破乳之前结束",{"key":27,"text":263,"correct":29},"乳化沥青破乳之前，应完成所有碾压工作",{"key":31,"text":265,"correct":22},"拌合过程中已发生破乳的混合料，应予废弃",{"key":34,"text":267,"correct":22},"施工过程中遇雨应停止铺筑，以防止雨水将乳液冲走",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},1134848,"关于水泥稳定土基层人工拌合的说法，正确的有（）。",[272,274,276,278,280],{"key":20,"text":273,"correct":29},"摊铺土之前只需通过计算确定土的松铺系数",{"key":24,"text":275,"correct":22},"摊铺土应在摊铺水泥的前一天进行",{"key":27,"text":277,"correct":22},"如已整平的土含水量过小，应在土层上洒水闷料",{"key":31,"text":279,"correct":22},"细粒土应经一夜闷料",{"key":34,"text":281,"correct":29},"对于二级公路，土与水泥的干拌可采用农用旋转耕作机与平地机配合进行","BCD",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":297,"analysis":37},1134849,"基层出现收缩裂缝，经过弯沉检测，结构层的承载能力满足设计要求时可采取下列措施处理裂缝的有（）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"在裂缝位置灌缝",{"key":24,"text":290,"correct":22},"在裂缝位置铺设玻璃纤维格栅",{"key":27,"text":292,"correct":22},"洒铺热改性沥青",{"key":31,"text":294,"correct":29},"拉杆拉结",{"key":34,"text":296,"correct":29},"翻挖重铺","ABC",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":312,"analysis":37},1134850,"可以用于沥青混凝土面层的联接层的有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":29},"沥青表面处治路面",{"key":24,"text":305,"correct":22},"沥青碎石路面",{"key":27,"text":307,"correct":29},"沥青混凝土路面",{"key":31,"text":309,"correct":22},"沥青贯入式路面",{"key":34,"text":311,"correct":29},"沥青玛蹄脂路面","BD",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":196,"analysis":37},1134851,"二级公路沥青层的粗集料可使用（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"碎石",{"key":24,"text":320,"correct":22},"破碎砾石",{"key":27,"text":322,"correct":29},"筛选砾石",{"key":31,"text":324,"correct":22},"矿渣",{"key":34,"text":326,"correct":29},"石屑",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":123,"analysis":37},1134854,"关于沥青混凝土路面施工时选用沥青的说法，正确的有（ ）。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"在夏季温度高且持续时间长的地区修建高速公路，应采用稠度大、黏度大的沥青",{"key":24,"text":334,"correct":29},"对日温差、年温差大的地区，宜选用针入度指数小的沥青",{"key":27,"text":336,"correct":29},"当高温要求与低温要求发生矛盾时，应优先考虑满足低温性能的要求",{"key":31,"text":338,"correct":22},"汽车荷载剪应力大的路面结构层，宜选用稠度大、黏度大的沥青",{"key":34,"text":340,"correct":22},"当缺乏所需标号的沥青时，可采用不同标号掺配的调和沥青",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":36,"analysis":37},1134856,"垫层的作用有（ ）。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"排水",{"key":24,"text":348,"correct":22},"隔水",{"key":27,"text":350,"correct":29},"防滑",{"key":31,"text":352,"correct":22},"防冻",{"key":34,"text":354,"correct":22},"防污",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":240,"analysis":37},1134857,"沥青面层的细集料可采用（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"河砂",{"key":24,"text":362,"correct":22},"机制砂",{"key":27,"text":364,"correct":22},"海砂",{"key":31,"text":366,"correct":29},"粉煤灰",{"key":34,"text":326,"correct":22},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":240,"analysis":37},1134859,"可能导致水泥稳定碎石基层产生裂缝的原因有（）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"水泥用量偏大",{"key":24,"text":375,"correct":22},"集料级配中细料偏多",{"key":27,"text":377,"correct":22},"碾压时含水量偏大",{"key":31,"text":379,"correct":29},"采用了缓凝水泥",{"key":34,"text":381,"correct":22},"碎石中含泥量较高",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":225,"analysis":37},1134860,"水泥混凝土路面断板的防治措施有（）。",[386,388,390,392,394],{"key":20,"text":387,"correct":29},"加铺沥青磨耗层",{"key":24,"text":389,"correct":22},"提高基层施工质量",{"key":27,"text":391,"correct":29},"路基要做好封层",{"key":31,"text":393,"correct":22},"严格控制水泥混凝土水胶比",{"key":34,"text":395,"correct":22},"严格掌握切缝时间",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":297,"analysis":37},1134861,"下列关于水泥混凝土路面施工方法的说法正确的有（ ）。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"目前通常采用的水泥混凝土面层铺筑的技术方法有小型机具铺筑.滑模摊铺机施工.三辊轴机组铺筑和碾压混凝土四种方法",{"key":24,"text":403,"correct":22},"小型机具施工不需要大型设备，主要靠人工",{"key":27,"text":405,"correct":22},"碾压混凝土可采用沥青摊铺机施工",{"key":31,"text":407,"correct":29},"三辊轴机组施工工艺的机械化程度高，设备投入多，技术较难掌握",{"key":34,"text":409,"correct":29},"碾压混凝土施工工艺是水泥混凝土路面施工方式中传统的施工方式",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},1134863,"能有效防治水泥稳定土基层裂缝的措施有（）。",[414,416,418,420,422],{"key":20,"text":415,"correct":29},"采用塑性指数较高的土",{"key":24,"text":417,"correct":22},"控制压实含水量，根据土的性质采用最佳含水量",{"key":27,"text":419,"correct":29},"在保证水泥稳定士强度的前提下，尽可能增加水泥用量",{"key":31,"text":421,"correct":29},"成型，尽可能采用快凝水泥",{"key":34,"text":423,"correct":22},"加强对水泥稳定土的养护，避免水分挥发过大","BE",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":36,"analysis":37},1134864,"水泥稳定碎石基层施工，确定每日施工作业段长度，宜综合考虑的因素有（）。",[429,431,433,435,437],{"key":20,"text":430,"correct":22},"施工机械的生产效率和数量",{"key":24,"text":432,"correct":22},"施工人员数量及操作熟练程度",{"key":27,"text":434,"correct":29},"增加施工接缝的数量",{"key":31,"text":436,"correct":22},"施工季节和气候条件",{"key":34,"text":438,"correct":22},"水泥的初凝时间和延迟时间",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":282,"analysis":37},1134865,"石灰稳定土基层裂缝的防治方法有（ ）。",[443,444,446,448,450],{"key":20,"text":415,"correct":29},{"key":24,"text":445,"correct":22},"在石灰土中适量掺加砂.碎石",{"key":27,"text":447,"correct":22},"施工用土中适量掺加粉煤灰",{"key":31,"text":449,"correct":22},"在石灰土层中设置伸缩缝",{"key":34,"text":451,"correct":29},"含水量提高3个百分点",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":312,"analysis":37},1134866,"下列作用中，属于可变作用的有（ ）。",[456,458,460,462,464],{"key":20,"text":457,"correct":29},"基础变位作用",{"key":24,"text":459,"correct":22},"车辆荷载引起的土侧压力",{"key":27,"text":461,"correct":29},"水的浮力",{"key":31,"text":463,"correct":22},"风荷载",{"key":34,"text":465,"correct":29},"地震作用",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":282,"analysis":37},1134867,"桥梁的下部结构包括（ ）。",[470,472,474,476,478],{"key":20,"text":471,"correct":29},"桥跨结构",{"key":24,"text":473,"correct":22},"桥墩",{"key":27,"text":475,"correct":22},"桥台",{"key":31,"text":477,"correct":22},"基础",{"key":34,"text":479,"correct":29},"桥面结构",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":297,"analysis":37},1134868,"桥梁桩基础包括（ ）。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"沉桩",{"key":24,"text":487,"correct":22},"钻孔桩",{"key":27,"text":489,"correct":22},"挖孔桩",{"key":31,"text":491,"correct":29},"刚性基础",{"key":34,"text":493,"correct":29},"管柱",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":424,"analysis":37},1134869,"下列属于桥梁工程设计中偶然作用的有（ ）。",[498,500,502,503,505],{"key":20,"text":499,"correct":29},"温度作用",{"key":24,"text":501,"correct":22},"汽车撞击作用",{"key":27,"text":465,"correct":29},{"key":31,"text":504,"correct":29},"混凝土收缩及徐变作用",{"key":34,"text":506,"correct":22},"船舶或漂流物的撞击作用",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":94,"analysis":37},1134870,"对模板、支架和拱架拆除的技术要求，描述正确的有（）。",[511,513,515,517,519],{"key":20,"text":512,"correct":29},"模板拆除应按先支先拆，后支后拆的顺序，拆时严禁抛扔",{"key":24,"text":514,"correct":22},"墩、台模板宜在其上部结构施工前拆除",{"key":27,"text":516,"correct":22},"卸落支架和拱架在纵向应对称均衡卸落，在横向应同时一起卸落",{"key":31,"text":518,"correct":22},"简支梁、连续梁宜从跨中向支座依次循环卸落",{"key":34,"text":520,"correct":22},"悬臂梁应先卸挂梁及悬臂的支架，再卸无铰跨内的支架",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":52,"analysis":37},1134871,"计算设于水中的支架或拱架的强度和稳定时，应考虑的荷载有（）。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"风力",{"key":24,"text":528,"correct":22},"水流压力",{"key":27,"text":530,"correct":22},"流冰压力",{"key":31,"text":532,"correct":22},"船只漂流物的冲击力",{"key":34,"text":534,"correct":29},"土压力",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":94,"analysis":37},1134872,"桥梁施工模板、支架设计计算中，应考虑的荷载包括（）。",[539,541,543,545,547],{"key":20,"text":540,"correct":29},"汽车荷载",{"key":24,"text":542,"correct":22},"模板、支架及施工人员、材料、机具的重量",{"key":27,"text":544,"correct":22},"新浇筑混凝土对侧模板的压力",{"key":31,"text":546,"correct":22},"倾倒混凝土时产生的水平荷载",{"key":34,"text":548,"correct":22},"可能产生的雪荷载、冬季保温设施荷载",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":563,"analysis":37},1134874,"关于桥梁混凝土施工的说法，正确的有（）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"大体积混凝土按60d龄期测定抗压强度",{"key":24,"text":556,"correct":29},"钢筋混凝土结构应优先选用氯盐类混凝土外加剂",{"key":27,"text":558,"correct":22},"混凝土抗压强度评定试件应采用标准条件养护",{"key":31,"text":560,"correct":22},"应在搅拌地点与浇筑地点分别取样检测混凝土拌合物的坍落度",{"key":34,"text":562,"correct":29},"泵送混凝土试配的坍落度值应为入泵时的坍落度","ACD",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":297,"analysis":37},1134875,"锚具夹具进场时，除型号、规格外，还需进行（）验收。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"外观检查",{"key":24,"text":571,"correct":22},"硬度检验",{"key":27,"text":573,"correct":22},"静载锚固性能试验",{"key":31,"text":575,"correct":29},"伸长率",{"key":34,"text":577,"correct":29},"强度",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":123,"analysis":37},1134876,"冷拔低碳钢丝进场验收时，除应对质量说明书、包装、标志等进行检查外，还应逐盘进行（）试验。",[582,584,586,588,589],{"key":20,"text":583,"correct":22},"抗拉强度",{"key":24,"text":585,"correct":29},"抗压强度",{"key":27,"text":587,"correct":29},"抗扭强度",{"key":31,"text":575,"correct":22},{"key":34,"text":590,"correct":22},"弯曲",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":152,"analysis":37},1134877,"对于土质渗透性较大、挖掘较深的基坑，可采用的基坑排水方法有（）。",[595,597,599,601,603],{"key":20,"text":596,"correct":29},"集水坑排水法",{"key":24,"text":598,"correct":29},"井点排水法",{"key":27,"text":600,"correct":22},"板桩法",{"key":31,"text":602,"correct":22},"沉井法",{"key":34,"text":604,"correct":22},"帷幕法",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":619,"analysis":37},1134878,"在沉桩时应当停止锤击的情况有（）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"沉入度突然发生急剧变化",{"key":24,"text":612,"correct":29},"桩尖已沉入到设计标高，贯入度没有达到要求时",{"key":27,"text":614,"correct":22},"桩身突然发生倾斜、移位",{"key":31,"text":616,"correct":22},"桩顶破碎或桩身开裂、变形，桩侧地面有严重隆起现象",{"key":34,"text":618,"correct":22},"桩不下沉，桩锤有严重的回弹现象","ACDE",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":619,"analysis":37},1134879,"泥浆在钻孔施工中所起的主要作用有（）。",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"浮悬钻渣",{"key":24,"text":627,"correct":29},"减小孔内向外的压力",{"key":27,"text":629,"correct":22},"润滑钻具",{"key":31,"text":631,"correct":22},"隔断孔内外渗流",{"key":34,"text":633,"correct":22},"冷却钻头",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":181,"analysis":37},1134880,"下列关于沉井施工，说法正确的有（）。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"就地筑岛制作沉井时，岛面宜高于最高水位0.5~0.7m",{"key":24,"text":641,"correct":22},"混凝土沉井应在支垫上立模制作",{"key":27,"text":643,"correct":29},"沉井严禁在下沉过程中接高",{"key":31,"text":645,"correct":29},"沉井宜采用排水法下沉",{"key":34,"text":647,"correct":29},"在稳定土层中，可采用不排水法下沉",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":312,"analysis":37},1134881,"悬臂拼装法施工中，0号块和1号块之间采用湿接缝处理主要是为了控制该跨节段的（）。",[652,654,656,658,660],{"key":20,"text":653,"correct":29},"挠度",{"key":24,"text":655,"correct":22},"标高",{"key":27,"text":657,"correct":29},"截面尺寸",{"key":31,"text":659,"correct":22},"拼装方向",{"key":34,"text":661,"correct":29},"施工不平衡荷载",{"id":663,"libraryId":5,"type":15,"typeLabel":16,"stem":664,"options":665,"answer":240,"analysis":37},1134882,"缆索吊装施工中，缆索吊装设备主要由（）等部分组成。",[666,668,670,672,674],{"key":20,"text":667,"correct":22},"主索",{"key":24,"text":669,"correct":22},"工作索",{"key":27,"text":671,"correct":22},"起重索",{"key":31,"text":673,"correct":29},"吊杆",{"key":34,"text":675,"correct":22},"锚固装置",{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":36,"analysis":37},1134883,"顶推施工主要临时设施及机具设备有（）。",[680,682,684,686,688],{"key":20,"text":681,"correct":22},"起重机",{"key":24,"text":683,"correct":22},"导梁",{"key":27,"text":685,"correct":29},"牵引索",{"key":31,"text":687,"correct":22},"千斤顶",{"key":34,"text":689,"correct":22},"滑动装置",{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":704,"analysis":37},1134884,"转体施工按转动方向分为（）。",[694,696,698,700,702],{"key":20,"text":695,"correct":22},"竖向转体施工法",{"key":24,"text":697,"correct":29},"横向转体施工法",{"key":27,"text":699,"correct":22},"平面转体施工法",{"key":31,"text":701,"correct":29},"横竖向转体施工法",{"key":34,"text":703,"correct":22},"平竖结合转体法","ACE",{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":94,"analysis":37},1134885,"桥梁施工控制方法可分为（）。",[709,711,713,715,717],{"key":20,"text":710,"correct":29},"人工监测",{"key":24,"text":712,"correct":22},"事后控制法",{"key":27,"text":714,"correct":22},"预测控制法",{"key":31,"text":716,"correct":22},"自适应控制法",{"key":34,"text":718,"correct":22},"最大宽容度控制法",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":225,"analysis":37},1134886,"斜拉桥混凝土主梁零号段及其两旁的梁段，在支架和塔下托架上浇筑时，应消除的对变形和施工质量的不良影响因素有（）。",[723,725,727,728,730],{"key":20,"text":724,"correct":29},"湿度",{"key":24,"text":726,"correct":22},"温度",{"key":27,"text":526,"correct":29},{"key":31,"text":729,"correct":22},"弹性和非弹性变形",{"key":34,"text":731,"correct":22},"支承",[733,737,740,743,746,749],{"id":734,"name":735,"category":7,"favorite":736},1,"领导干部任职前廉政法规知识测试题",92,{"id":738,"name":739,"category":7,"favorite":734},595,"建筑结构与设备",{"id":741,"name":742,"category":7,"favorite":734},715,"招标采购专业知识与法律法规",{"id":744,"name":745,"category":7,"favorite":734},848,"市政方向-通用基础",{"id":747,"name":748,"category":7,"favorite":8},534,"BIM工程师",{"id":750,"name":748,"category":7,"favorite":8},535]