[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,20,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1134720,1,"单选题","关于预应力钢绞线进场检测验收的说法，正确的是（ ）。2012年",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","每批进行拉力和冷弯试验",false,{"key":24,"text":25,"correct":22},"B","每批进行抗拉强度和弯曲试验",{"key":27,"text":28,"correct":22},"C","每批进行长度与直径偏差及力学性能试验",{"key":30,"text":31,"correct":32},"D","每批进行表面质量、直径偏差和力学性能试验",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1134722,"关于泵送混凝土的说法，错误的是（ ）。2017真题",[38,40,42,44],{"key":20,"text":39,"correct":22},"不宜使用火山灰质硅酸盐水泥",{"key":24,"text":41,"correct":22},"粗集料宜采用连续级配",{"key":27,"text":43,"correct":22},"应掺入泵送剂或减水剂",{"key":30,"text":45,"correct":32},"不得掺入粉煤灰或其他活性矿物掺合料",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1134723,"下列桥台中，不属于梁桥轻型桥台的是（ ）。2015年",[50,52,54,56],{"key":20,"text":51,"correct":22},"埋置式桥台",{"key":24,"text":53,"correct":32},"靠背式框架桥台",{"key":27,"text":55,"correct":22},"加筋土桥台",{"key":30,"text":57,"correct":22},"钢筋混凝土薄壁桥台",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1134724,"卸落浆砌石拱桥的拱架，须待砂浆强度达到设计强度标准值的（ ）。2017真题",[62,64,66,68],{"key":20,"text":63,"correct":22},"70%",{"key":24,"text":65,"correct":22},"75%",{"key":27,"text":67,"correct":22},"80%",{"key":30,"text":69,"correct":32},"85%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1134725,"预应力张拉的千斤顶与压力表，不需要重新标定的情形是（）。2018真题",[74,76,78,80],{"key":20,"text":75,"correct":32},"使用时间达到3个月",{"key":24,"text":77,"correct":22},"张拉次数超过300次",{"key":27,"text":79,"correct":22},"千斤顶检修后",{"key":30,"text":81,"correct":22},"更换新压力表",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1134730,"关于斜拉桥受力特点的说法，错误的是（ ）。2014年",[86,88,90,92],{"key":20,"text":87,"correct":32},"斜拉索相当于缩小了偏心距的体外索",{"key":24,"text":89,"correct":22},"斜拉索发挥了抵抗负弯矩的能力",{"key":27,"text":91,"correct":22},"斜拉索的水平分力相当于混凝土的预压力",{"key":30,"text":93,"correct":22},"主梁为多点弹性支撑",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1134731,"斜拉桥塔柱裸塔施工不宜采用的方法是（ ）。2017真题",[98,100,102,104],{"key":20,"text":99,"correct":32},"满堂支架法",{"key":24,"text":101,"correct":22},"爬模法",{"key":27,"text":103,"correct":22},"滑模法",{"key":30,"text":105,"correct":22},"翻模法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1134733,"关于桥梁上部结构竖转法施工特点的说法，正确的是（）。2018真题",[110,112,114,116],{"key":20,"text":111,"correct":22},"在桥台处设置转盘，将两岸预制的整垮或半跨转至设计合拢位置",{"key":24,"text":113,"correct":22},"转体重量大，施工中需设置转体平衡重",{"key":27,"text":115,"correct":32},"主要适用于转体重量不大的拱桥",{"key":30,"text":117,"correct":22},"主要针对大跨度拱桥施工，采用锚固体系代替平衡重",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1134734,"使用滑模摊铺机进行水泥混凝土路面施工的路段是（）。2018真题",[122,124,126,128],{"key":20,"text":123,"correct":22},"纵坡大于5%的上坡路段",{"key":24,"text":125,"correct":22},"纵坡大于6%的下坡路段",{"key":27,"text":127,"correct":32},"平面半径为50m~100m的平曲线路段",{"key":30,"text":129,"correct":22},"超高横坡大于7%的路段",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1134735,"（2019年真题）关于预应力钢筋混凝土拆模说法错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"承包人应在拟定拆模时间的12h以前，并应取得监理工程师同意",{"key":24,"text":137,"correct":22},"非承重侧模板应在混凝土强度，设计未规定达到2.5MPa时方可拆除侧模板",{"key":27,"text":139,"correct":22},"钢筋混凝土结构的承重模板、支架，应在混凝土强度能承受其自重荷载及其他可能的叠加荷载时，方可拆除",{"key":30,"text":141,"correct":32},"预应力混凝土结构，其侧模、底模及支架应在结构建立预应力后方可拆除",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1134736,"（2019年真题）关于高强度混凝土施工说法错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"不得使用立窑水泥",{"key":24,"text":149,"correct":32},"高强度混凝土的水泥用量宜大于600kg\u002Fm3",{"key":27,"text":151,"correct":22},"高强度混凝土的施工应采用强制式搅拌机拌制",{"key":30,"text":153,"correct":22},"搅拌混凝土时高效减水剂宜采用后掺法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1134737,"（2019年真题）关于先张法预制梁板说法错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"钢横梁受力后，挠度不能大于2mm",{"key":24,"text":161,"correct":22},"对热轧带肋钢筋，可采用乙炔一氧气切割",{"key":27,"text":163,"correct":22},"同一构件内预应力钢丝、钢绞线的断丝数量不得超过1%",{"key":30,"text":165,"correct":32},"其位置与设计位置的偏差应不大于8mm",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},1134738,"（2020年真题）猫道说法错误的是（ ）",[170,172,174,176],{"key":20,"text":171,"correct":22},"架设时应充分考虑猫道自重等因素",{"key":24,"text":173,"correct":22},"猫道应对称进行施工",{"key":27,"text":175,"correct":22},"猫道承重索可采用钢丝绳或钢绞线",{"key":30,"text":177,"correct":32},"不宜用抗风缆",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1134740,"（2020年真题）预应力施工中，直径为32mm的预应力筋施工锚固完毕，切割后其外露长度至少为（ ）",[182,184,186,188],{"key":20,"text":183,"correct":22},"32mm",{"key":24,"text":185,"correct":32},"48mm",{"key":27,"text":187,"correct":22},"40mm",{"key":30,"text":189,"correct":22},"63mm",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1134741,"根据《公路桥涵施工技术规范》（JTGTF50-2011），桥梁工程施工中，大体积C30 混凝土的最大胶凝材料总量不宜超过（ ）kg\u002Fm3。2013年",[194,196,198,200],{"key":20,"text":195,"correct":32},"350",{"key":24,"text":197,"correct":22},"400",{"key":27,"text":199,"correct":22},"450",{"key":30,"text":201,"correct":22},"500",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1134742,"悬索桥主缆施工的主要工序包括：①主缆架设；②猫道架设；③索夹安装与吊索架设；④紧缆；⑤牵引系统施工。其正确的施工工序为（ ）。2013年",[206,208,210,212],{"key":20,"text":207,"correct":22},"①→②→③→④→⑤",{"key":24,"text":209,"correct":32},"⑤→②→①→④→③",{"key":27,"text":211,"correct":22},"②→⑤→④→①→③",{"key":30,"text":213,"correct":22},"⑤→③→①→④→②",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1134743,"当混凝土发生离析、泌水严重时，需进行二次搅拌。关于“二次搅拌”的说法，正确的是（ ）。2012年",[218,220,222,224],{"key":20,"text":219,"correct":22},"二次搅拌时不得加水",{"key":24,"text":221,"correct":32},"可同时加水和水泥，以保持其原水灰比不变",{"key":27,"text":223,"correct":22},"泌水较多时，添加减水剂搅拌",{"key":30,"text":225,"correct":22},"二次搅拌时，添加水泥与缓凝剂搅拌",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1134744,"关于明挖扩大基础基坑开挖的说法，错误的是（ ）。2014年",[230,232,234,236],{"key":20,"text":231,"correct":22},"基坑顶缘四周适当距离处应设置截水沟",{"key":24,"text":233,"correct":32},"开挖机械距离基坑边缘应大于0.5m",{"key":27,"text":235,"correct":22},"基坑开挖经过不同土层时，边坡坡度可分层而异，视情况留平台",{"key":30,"text":237,"correct":22},"基坑自开挖起，应尽量连续施工直至基础完成",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1134745,"钻孔灌注桩施工中，钻孔至设计孔深后，其紧后工序是（ ）。2015年",[242,244,246,248],{"key":20,"text":243,"correct":22},"下放导管",{"key":24,"text":245,"correct":32},"清孔",{"key":27,"text":247,"correct":22},"钢筋笼制作及安放",{"key":30,"text":249,"correct":22},"灌注水下混凝土",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},1134746,"隧道工程的主体结构物通常指（ ）。2013年",[254,256,258,260],{"key":20,"text":255,"correct":22},"洞内行车道路",{"key":24,"text":257,"correct":22},"洞身预支护与衬砌",{"key":27,"text":259,"correct":32},"洞身衬砌和洞门构造物",{"key":30,"text":261,"correct":22},"防排水构造物",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1134747,"桥梁混凝土浇筑时，若施工缝为斜面，则施工缝应（ ）。2012年",[266,268,270,272],{"key":20,"text":267,"correct":32},"浇筑成或凿成台阶状",{"key":24,"text":269,"correct":22},"设置止水带",{"key":27,"text":271,"correct":22},"及时修整抹光",{"key":30,"text":273,"correct":22},"补插拉杆",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1134748,"采用悬臂挂篮法浇筑桥梁上部结构混凝土时，需防止因后浇筑混凝土的重力引起挂篮变形，导致先浇筑的混凝土开裂，下列措施中，不能起到预防作用的是（ ）。2016年",[278,280,282,284],{"key":20,"text":279,"correct":22},"根据混凝土重量变化调整吊带高度",{"key":24,"text":281,"correct":22},"采用预抬高挂篮的后支点法",{"key":27,"text":283,"correct":32},"水箱法中保持水箱水量不变",{"key":30,"text":285,"correct":22},"混凝土一次浇筑法",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1134749,"桥梁扩建加宽，新旧桥梁采用上部结构连接而下部结构分离方式时，下列说法错误的是（ ）。2014年",[290,292,294,296],{"key":20,"text":291,"correct":32},"钢筋混凝土实心板桥，新旧梁板之间拼接宜采用刚性连接",{"key":24,"text":293,"correct":22},"钢筋混凝土空心板桥，新旧梁板之间拼接宜采用铰接连接",{"key":27,"text":295,"correct":22},"预应力混凝土T 梁，新旧T 梁之间拼接宜采用刚性连接",{"key":30,"text":297,"correct":22},"连续箱梁桥，新旧箱梁之间拼接宜采用铰接连接",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1134750,"下列隧道施工通风方式中，错误的是（ ）。2017真题",[302,304,306,308],{"key":20,"text":303,"correct":22},"风管式通风",{"key":24,"text":305,"correct":22},"巷道式通风",{"key":27,"text":307,"correct":32},"通道式通风",{"key":30,"text":309,"correct":22},"风墙式通风",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":30,"analysis":33},1134751,"钻孔灌注桩均匀性监测不宜采用（ ）。2014年",[314,316,318,320],{"key":20,"text":315,"correct":22},"钻芯取样法",{"key":24,"text":317,"correct":22},"超声波法",{"key":27,"text":319,"correct":22},"机械阻抗法",{"key":30,"text":321,"correct":32},"回弹仪法",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1134752,"（2019年真题）中、小型突水泥的地段地质灾害分级为（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"A级",{"key":24,"text":329,"correct":32},"B级",{"key":27,"text":331,"correct":22},"C级",{"key":30,"text":333,"correct":22},"D级",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1134753,"（2019年真题）湿式凿岩水、风操作正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"先开风后开水，先关水后关风",{"key":24,"text":341,"correct":22},"先开风后开水，先关风后关水",{"key":27,"text":343,"correct":32},"先开水后开风，先关风后关水",{"key":30,"text":345,"correct":22},"先开水后开风，先关水后关风",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},1134754,"（2020年真题）关于隧道洞门工程施工的说法，错误的是（ ）",[350,352,354,356],{"key":20,"text":351,"correct":22},"基础应设于稳固的地基上，并将杂物、水泥、虚渣等清除",{"key":24,"text":353,"correct":22},"洞门端墙砌筑与回填应二侧对称进行",{"key":27,"text":355,"correct":22},"洞口边缘、仰坡严禁采用大爆破",{"key":30,"text":357,"correct":32},"洞口的排水沟应在洞门工程完成后再施工",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},1134755,"（2020年真题）下面不是光面爆破的特点（ ）",[362,364,366,368],{"key":20,"text":363,"correct":22},"开挖轮廓成型规则，岩面平整",{"key":24,"text":365,"correct":22},"岩面上保存50%以上孔痕，且无明显裂痕",{"key":27,"text":367,"correct":22},"爆破后围岩壁上无危石",{"key":30,"text":369,"correct":32},"粒径适中，有利于洞渣运输",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1134756,"GPS-RTK技术用于道路中线施工放样时，应先计算出线路上里程桩的（ ）。2017真题",[374,376,378,380],{"key":20,"text":375,"correct":22},"方位角",{"key":24,"text":377,"correct":32},"坐标",{"key":27,"text":379,"correct":22},"距离",{"key":30,"text":381,"correct":22},"象限角",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1134757,"关于通信系统的电源线敷设的说法，错误的是（ ）。2013年",[386,388,390,392],{"key":20,"text":387,"correct":32},"交、直流电源的馈电电缆应分开布设",{"key":24,"text":389,"correct":22},"电缆线与设备端子连接时，不应使端子受到机械压力",{"key":27,"text":391,"correct":22},"电源线的规格，熔丝的容量均应符合设计要求",{"key":30,"text":393,"correct":22},"正负线两端应有统一的红蓝标志",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1134758,"关于公路监控系统主要设备安装通用要求的说法，正确的是（ ）。2016年",[398,400,402,404],{"key":20,"text":399,"correct":32},"设备开箱检查须由业主、承包方和监理共同参加",{"key":24,"text":401,"correct":22},"室内布缆、线，一般均在防静电地板下交叉排列",{"key":27,"text":403,"correct":22},"电力电缆和信号电缆应同槽布设",{"key":30,"text":405,"correct":22},"焊接应采用腐蚀剂焊接",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1134759,"关于光缆接头套管封装的要求，错误的是（ ）。2014年",[410,412,414,416],{"key":20,"text":411,"correct":22},"接头套管内装防潮剂",{"key":24,"text":413,"correct":22},"接头套管内装接头责任卡",{"key":27,"text":415,"correct":32},"若热可缩套管加热时少许烧焦，应用胶带缠紧",{"key":30,"text":417,"correct":22},"封装完毕，测试检查接头损耗并做记录",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1134760,"关于电缆线路敷设的说法，错误的是（ ）。2014年",[422,424,426,428],{"key":20,"text":423,"correct":32},"直埋电缆上、下部应铺以不小于100mm 厚的碎石层",{"key":24,"text":425,"correct":22},"管道敷设时，电缆管内径与电缆外径之比不得小于1.5",{"key":27,"text":427,"correct":22},"三相或单相的交流单芯电缆，不得单独穿于钢管内",{"key":30,"text":429,"correct":22},"电缆在沟内敷设时，应遵循低压在下，高压在上的原则",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":30,"analysis":33},1134761,"交通监控系统进行交通控制的主要方法不包括（ ）。2012年",[434,436,438,440],{"key":20,"text":435,"correct":22},"主线控制",{"key":24,"text":437,"correct":22},"区域控制",{"key":27,"text":439,"correct":22},"匝道控制",{"key":30,"text":441,"correct":32},"支线控制",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1134762,"下列收费子系统组成设备中，不属于车牌自动识别装置组成部分的是（ ）。2015年",[446,448,450,452],{"key":20,"text":447,"correct":22},"车辆检测器",{"key":24,"text":449,"correct":32},"ETC 电子标签",{"key":27,"text":451,"correct":22},"摄像机",{"key":30,"text":453,"correct":22},"图像采集卡",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},1134763,"（2019年真题）不属于安全设施的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"交通标志",{"key":24,"text":461,"correct":22},"交通标线",{"key":27,"text":463,"correct":32},"自动报警",{"key":30,"text":465,"correct":22},"隔离栅",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":30,"analysis":33},1134764,"（2020年真题）不是防撞筒的作用的是（ ）",[470,472,474,476],{"key":20,"text":471,"correct":22},"警示",{"key":24,"text":473,"correct":22},"缓冲",{"key":27,"text":475,"correct":22},"诱导视线",{"key":30,"text":477,"correct":32},"指示",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1134765,"（2020年真题）在中性点直接接地的低压配电系统中，宜采用（ ）",[482,484,486,488],{"key":20,"text":483,"correct":22},"AG",{"key":24,"text":485,"correct":32},"TN",{"key":27,"text":487,"correct":22},"PE",{"key":30,"text":489,"correct":22},"PL",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1134766,"根据交通运输部颁发的《公路工程基本建设管理办法》，公路工程基本建设程序是首先编制（ ）。2013年",[494,496,498,500],{"key":20,"text":495,"correct":22},"年度基本建设计划",{"key":24,"text":497,"correct":22},"项目环境影响报告",{"key":27,"text":499,"correct":32},"项目建议书",{"key":30,"text":501,"correct":22},"设计任务书",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1134767,"（2019年真题）工程各合同段交工验收结束后，由（ ）对整个工程项目进行工程质量评定。",[506,508,510,512],{"key":20,"text":507,"correct":32},"项目法人",{"key":24,"text":509,"correct":22},"监督机构",{"key":27,"text":511,"correct":22},"监理单位",{"key":30,"text":513,"correct":22},"竣工验收委员会",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},1134768,"（2020年真题）根据(公路工程施工分包管理办法)，分包人业绩证明由（ ）出具。",[518,520,522,524],{"key":20,"text":519,"correct":32},"承包人与发包人共同",{"key":24,"text":521,"correct":22},"发包人与监理共同",{"key":27,"text":523,"correct":22},"发包人",{"key":30,"text":525,"correct":22},"承包人",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1134769,"关于公路水运工程“平安工地”考核评价说法，错误的是（ ）。2014年",[530,532,534,536],{"key":20,"text":531,"correct":22},"考核评价遵循“分级管理、属地负责”的原则",{"key":24,"text":533,"correct":22},"考核评价分项目开工前、施工期间和交工验收前三个阶段",{"key":27,"text":535,"correct":22},"考核期间发生1 起一般生产安全责任事故，负有事故责任的施工合同段不能评为示范等级",{"key":30,"text":537,"correct":32},"项目施工期间，由建设单位组织开展工程项目“平安工地”考核评价工作",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1134770,"下列级别中，不属于全国公路建设从业单位信用评价等级的是（ ）。2013年",[542,544,546,548],{"key":20,"text":543,"correct":32},"E 级",{"key":24,"text":545,"correct":22},"AA 级",{"key":27,"text":547,"correct":22},"D 级",{"key":30,"text":549,"correct":22},"B 级",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":30,"analysis":33},1134771,"关于公路施工企业信用评价规则的说法，错误的是（ ）。2015年",[554,556,558,560],{"key":20,"text":555,"correct":22},"每年开展一次定期评价工作",{"key":24,"text":557,"correct":22},"施工企业信用升级每年最多可上升一个等级",{"key":27,"text":559,"correct":22},"联合体某一方有不良履约行为的，联合体各方均应扣分",{"key":30,"text":561,"correct":32},"因企业资质升级的，其信用评价等级也相应升级",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},1134772,"根据《公路施工企业信用评价规则》，下列关于信用评价等级的说法，错误的是（ ）。2016年",[566,568,570,572],{"key":20,"text":567,"correct":22},"公路施工企业资质升级的，其信用评价等级不变",{"key":24,"text":569,"correct":22},"企业分立的，按照新设立企业确定信用评价等级，但不得高于原评价等级",{"key":27,"text":571,"correct":32},"企业合并的，按照合并前信用评级等级较高企业等级确定",{"key":30,"text":573,"correct":22},"联合体参与投标时，其信用等级按照联合体各方最低等级认定",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},1134773,"关于公路工程自建房屋的要求，错误的是（）。2018真题",[578,580,582,584],{"key":20,"text":579,"correct":22},"最低标准为活动板房",{"key":24,"text":581,"correct":22},"建设宜选用阻燃材料",{"key":27,"text":583,"correct":32},"搭建不宜超过三层",{"key":30,"text":585,"correct":22},"每组最多不超过10栋",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":30,"analysis":33},1134774,"下列工作中，属于竣工验收内容的是（ ）。 2015年",[590,592,594,596],{"key":20,"text":591,"correct":22},"检查施工合同的执行情况",{"key":24,"text":593,"correct":22},"评价工程质量是否符合技术标准和设计要求",{"key":27,"text":595,"correct":22},"评价工程质量是否满足通车要求",{"key":30,"text":597,"correct":32},"对工程质量、参建单位和建设项目进行综合评价",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":30,"analysis":33},1134775,"下列大型临时工程中，需编制专项施工方案且需专家论证，审查的是（ ）。2017真题",[602,604,606,608],{"key":20,"text":603,"correct":22},"水深8m围堰工程",{"key":24,"text":605,"correct":22},"便桥",{"key":27,"text":607,"correct":22},"临时码头",{"key":30,"text":609,"correct":32},"猫道",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":20,"analysis":33},1134776,"根据《公路水运工程施工安全标准化指南》，不属于危险性较大的分部分项工程是（ ）。2015年",[614,616,618,620],{"key":20,"text":615,"correct":32},"高度18m 的土质边坡处理",{"key":24,"text":617,"correct":22},"水深15m 的围堰工程",{"key":27,"text":619,"correct":22},"深度7m 的挡墙基础",{"key":30,"text":621,"correct":22},"高瓦斯隧道",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]