[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,19,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,499,511,523,535,547,559,571,583,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1134665,1,"单选题","袋装砂井处理软基的工艺流程中，“沉入砂袋”的前一道工序是（）。 2015年",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","打入套管",true,{"key":24,"text":25,"correct":26},"B","机具定位",false,{"key":28,"text":29,"correct":26},"C","埋砂袋头",{"key":31,"text":32,"correct":26},"D","摊铺下层砂垫层","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1134666,"插设塑料排水板可采用的设备是（ ）。2013年",[38,40,42,44],{"key":20,"text":39,"correct":26},"潜孔钻机",{"key":24,"text":41,"correct":26},"动力螺旋钻机",{"key":28,"text":43,"correct":26},"喷粉桩机",{"key":31,"text":45,"correct":22},"袋装砂井打设机",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1134667,"单层横向全宽挖掘法适用于挖掘（ ）的土质路堑。",[50,52,54,56],{"key":20,"text":51,"correct":22},"浅且短",{"key":24,"text":53,"correct":26},"深且短",{"key":28,"text":55,"correct":26},"长且一侧堑壁较薄",{"key":31,"text":57,"correct":26},"深且长",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1134668,"具有膨胀性质的滑坡体，不宜采用的滑坡防治工程措施是（ ）。2016年",[62,64,66,68],{"key":20,"text":63,"correct":26},"反压土方",{"key":24,"text":65,"correct":22},"减重",{"key":28,"text":67,"correct":26},"修建抗滑挡土墙",{"key":31,"text":69,"correct":26},"设树枝状排水沟",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1134669,"钢钎炮在炮眼装药并捣实后，常用（）填塞堵孔。2014",[74,76,78,80],{"key":20,"text":75,"correct":26},"碎石",{"key":24,"text":77,"correct":22},"粘土",{"key":28,"text":79,"correct":26},"泥浆",{"key":31,"text":81,"correct":26},"粗砂",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1134670,"关于雨期开挖路堑的说法，正确的是（）。2012年",[86,88,90,92],{"key":20,"text":87,"correct":26},"挖方边坡宜一次挖到设计标高",{"key":24,"text":89,"correct":22},"炮眼应尽量水平布置",{"key":28,"text":91,"correct":26},"边坡应按设计坡度自下而上层层刷坡",{"key":31,"text":93,"correct":26},"土质路堑挖至离设计标高 20cm时应停止开挖",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1134671,"关于路基爆破施工中光面爆破和预裂爆破的说法，正确的是（）。2016",[98,100,102,104],{"key":20,"text":99,"correct":26},"两者均有侧向临空面",{"key":24,"text":101,"correct":22},"两者均宜采用低猛度、低爆速、传爆性能好的炸药",{"key":28,"text":103,"correct":26},"两者均在主炮爆破前起爆",{"key":31,"text":105,"correct":26},"两者均属于定向爆破",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1134672,"山坡陡峭的路段不宜采用（ ）。2014年",[110,112,114,116],{"key":20,"text":111,"correct":26},"柱板式锚杆挡土墙",{"key":24,"text":113,"correct":22},"加筋土挡土墙",{"key":28,"text":115,"correct":26},"重力式挡土墙",{"key":31,"text":117,"correct":26},"壁板式锚杆挡土墙",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1134673,"宜修建加筋土挡土墙的路段是（ ）。2012年",[122,124,126,128],{"key":20,"text":123,"correct":26},"挖方路段",{"key":24,"text":125,"correct":26},"地形陡峭的山坡路段",{"key":28,"text":127,"correct":26},"半填半挖路段",{"key":31,"text":129,"correct":22},"地形平坦宽敞的填方路段",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1134674,"路基填方材料最小强度控制指标是（）。2015年",[134,136,138,140],{"key":20,"text":135,"correct":26},"回弹模量",{"key":24,"text":137,"correct":26},"压实度",{"key":28,"text":139,"correct":22},"CBR值",{"key":31,"text":141,"correct":26},"塑性指数",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1134675,"可直接用作路堤填料的是（）。2012年",[146,148,150,152],{"key":20,"text":147,"correct":22},"石质土",{"key":24,"text":149,"correct":26},"粉质土",{"key":28,"text":151,"correct":26},"重粘土",{"key":31,"text":153,"correct":26},"电石渣",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1134676,"软基处理方法中，强夯置换应按照（）的方式施工。2018真题",[158,160,162,164],{"key":20,"text":159,"correct":22},"由内向外，隔行跳打",{"key":24,"text":161,"correct":26},"由内向外，逐行跳打",{"key":28,"text":163,"correct":26},"由外向内，隔行跳打",{"key":31,"text":165,"correct":26},"由外向内，逐行跳打",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1134677,"下列沿河路基防护工程中，属于间接防护工程的是（ ）。2015年",[170,172,174,176],{"key":20,"text":171,"correct":26},"石笼",{"key":24,"text":173,"correct":26},"植物",{"key":28,"text":175,"correct":26},"浸水挡土墙",{"key":31,"text":177,"correct":22},"顺坝",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1134678,"柱板式锚杆挡土墙墙后的土压力传递顺序，正确的是（ ）。2013年",[182,184,186,188],{"key":20,"text":183,"correct":26},"墙后的土压力→锚杆→挡土板",{"key":24,"text":185,"correct":26},"墙后的土压力→挡土板→锚杆",{"key":28,"text":187,"correct":22},"墙后的土压力→挡土板→肋柱→锚杆",{"key":31,"text":189,"correct":26},"墙后的土压力→肋柱→挡土板→锚杆",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1134679,"（2019年真题）不宜冬期施工的项目（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"含水流动性开挖",{"key":24,"text":197,"correct":26},"河滩地段开挖",{"key":28,"text":199,"correct":22},"整修路基边坡",{"key":31,"text":201,"correct":26},"岩石地段的路堑开挖",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1134680,"（2019年真题）不宜采用强夯法施工的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"高饱和度的粉土",{"key":24,"text":209,"correct":26},"碎石土",{"key":28,"text":211,"correct":26},"杂填土",{"key":31,"text":213,"correct":26},"软土",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1134681,"（2019年真题）不属于间接防护的是（ ）。",[218,220,221,223],{"key":20,"text":219,"correct":26},"护坝",{"key":24,"text":171,"correct":22},{"key":28,"text":222,"correct":26},"丁坝",{"key":31,"text":224,"correct":26},"改移河道",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},1134682,"（2020年真题）路堑施工时，其路基地面排水设施包括边沟、截水沟、排水沟、急流槽、跌水等，一般应先施工的排水设施是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"截水沟",{"key":24,"text":232,"correct":26},"边沟",{"key":28,"text":234,"correct":26},"排水沟",{"key":31,"text":236,"correct":26},"跌水与急流槽",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1134683,"（2020年真题）关于蒸发池设置的说法，错误的是( )。",[241,243,245,247],{"key":20,"text":242,"correct":26},"池底宜设置0.5%横坡",{"key":24,"text":244,"correct":26},"底面与侧面应采取防渗措施",{"key":28,"text":246,"correct":22},"蒸发池应紧邻路基设置",{"key":31,"text":248,"correct":26},"四周应采用隔离栅进行围护",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1134684,"（2020年真题）软土地区路堤施工期间，坡脚水平位移速率24h应不大于（ ）mm。",[253,255,257,259],{"key":20,"text":254,"correct":26},"3",{"key":24,"text":256,"correct":22},"5",{"key":28,"text":258,"correct":26},"8",{"key":31,"text":260,"correct":26},"10",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1134685,"沥青贯入碎石基层施工步骤包括：①撒布主层集料；②压路机碾压；③浇洒沥青；④撒布嵌缝料；⑤撒布封层料。正确的施工顺序是（ ）。2015年",[265,267,269,271],{"key":20,"text":266,"correct":22},"①→②→③→④→②→③→④→②→③→⑤→②",{"key":24,"text":268,"correct":26},"①→③→④→②→③→④→②→③→⑤→②",{"key":28,"text":270,"correct":26},"①→②→④→②→③→④→②→③→⑤→②→③",{"key":31,"text":272,"correct":26},"①→③→②→④→②→③→④→②→③→⑤→②→③",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},1134686,"培土路肩施工流程为：备料→推平→平整→X→Y→平整→碾压，其中X、Y 工序分别是（ ）。2014年",[277,279,281,283],{"key":20,"text":278,"correct":26},"回填、切边",{"key":24,"text":280,"correct":26},"切边、回填",{"key":28,"text":282,"correct":22},"静压、切边",{"key":31,"text":284,"correct":26},"切边、静压",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1134687,"关于水泥混凝土面层摊铺施工的说法，错误的是（ ）。2013年",[289,291,293,295],{"key":20,"text":290,"correct":22},"摊铺前应对基层表面进行风干处理，保持基层表面干燥",{"key":24,"text":292,"correct":26},"摊铺过程中，间断时间应不大于混凝土的初凝时间",{"key":28,"text":294,"correct":26},"每日工作结束，施工缝宜设置在胀缝或缩缝处",{"key":31,"text":296,"correct":26},"因机械故障或其他原因中断浇筑时，可设临时工作缝",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1134688,"下列桩基础类型中，不属于按桩的使用功能分类的是（ ）。2012年",[301,303,305,307],{"key":20,"text":302,"correct":22},"端承摩擦桩",{"key":24,"text":304,"correct":26},"竖向抗压桩",{"key":28,"text":306,"correct":26},"水平受荷桩",{"key":31,"text":308,"correct":26},"复合受荷桩",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},1134689,"培土路肩的施工流程正确的是（ ）。2017真题",[313,315,317,319],{"key":20,"text":314,"correct":26},"备料→平整→静压→推平→切边→平整→碾圧",{"key":24,"text":316,"correct":26},"备料→平整→静压→推平→碾圧→切边→平整",{"key":28,"text":318,"correct":22},"备料→推平→平整→静压→切边→平整→碾圧",{"key":31,"text":320,"correct":26},"备料→推平→静压→平整→碾圧→平整→切边",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1134690,"骨架植物防护类型不包括（ ）。2017真题",[325,327,329,331],{"key":20,"text":326,"correct":26},"浆砌片石骨架植草",{"key":24,"text":328,"correct":26},"水泥混凝土空心块护坡",{"key":28,"text":330,"correct":22},"窗孔式护面墙",{"key":31,"text":332,"correct":26},"锚杆混凝土框架植草",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},1134691,"沥青贯入式路面的施工工序代号如下：①撒布主层集料；②浇洒第一层沥青；③采用6～8t 钢轮压路机碾压；④撒布第一层嵌缝料；⑤采用8～12t 钢轮压路机碾压。上述5 道工序正确的施工顺序是（ ）。2012年",[337,339,341,343],{"key":20,"text":338,"correct":26},"②一①一④一③一⑤",{"key":24,"text":340,"correct":26},"②一①一③一④一⑤",{"key":28,"text":342,"correct":22},"①一③一②一④一⑤",{"key":31,"text":344,"correct":26},"①一⑤一②一④一③",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1134692,"沥青混合料中掺加的矿物纤维稳定剂宜采用（ ）制造。2016年",[349,351,353,355],{"key":20,"text":350,"correct":26},"石灰岩",{"key":24,"text":352,"correct":22},"玄武岩",{"key":28,"text":354,"correct":26},"花岗岩",{"key":31,"text":356,"correct":26},"页岩",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1134693,"沥青路面结构中垫层的主要作用是（ ）。2012年",[361,363,365,367],{"key":20,"text":362,"correct":26},"承重、排水、隔水、透水",{"key":24,"text":364,"correct":22},"排水、隔水、防冻、防污",{"key":28,"text":366,"correct":26},"承重、耐磨、排水、隔水",{"key":31,"text":368,"correct":26},"耐磨、防热、排水、透水",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},1134694,"关于热拌沥青混凝土混合料压实的说法，错误的是（ ）。2012年",[373,375,377,379],{"key":20,"text":374,"correct":26},"碾压分为初压、复压和终压",{"key":24,"text":376,"correct":26},"为保证沥青混合料碾压过程中不粘轮，可以采用雾状喷水法喷水碾压",{"key":28,"text":378,"correct":22},"边角部分压路机碾压不到的位置，采用人工静压",{"key":31,"text":380,"correct":26},"碾压进行中，压路机不得中途停留、转向",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1134695,"按矿料级配分类，属于开级配沥青混合料的是（ ）。2017真题",[385,387,389,391],{"key":20,"text":386,"correct":26},"SMA",{"key":24,"text":388,"correct":26},"AM",{"key":28,"text":390,"correct":26},"AC-16",{"key":31,"text":392,"correct":22},"OGFC",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},1134696,"下列沥青路面面层施工缝处理的做法，错误的是（）。2018真题",[397,399,401,403],{"key":20,"text":398,"correct":26},"半幅施工不能采用热接缝时，采用人工顺直刨缝或切缝",{"key":24,"text":400,"correct":26},"半幅施工铺另半幅前必须将边缘清扫干净，并涂洒少量黏层沥青",{"key":28,"text":402,"correct":22},"横接缝首先用3m直尺检查端部平整度，不符合要求时，按45°斜交于路中线切齐清除",{"key":31,"text":404,"correct":26},"纵向冷接缝上、下层的缝错开15cm以上，横向接缝错开1m以上",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1134697,"关于填隙碎石基层施工说法，错误的是（ ）。2016年",[409,411,413,415],{"key":20,"text":410,"correct":22},"填隙碎石的施工工艺中，撒布填隙料应在初压之前进行",{"key":24,"text":412,"correct":26},"粗碎石可以用强度合格的各种岩石轧制而成",{"key":28,"text":414,"correct":26},"粗碎石可以用稳定的矿渣轧制而成",{"key":31,"text":416,"correct":26},"填隙料可以采用石屑或最大粒径小于10mm 的砂砾料或粗砂",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},1134698,"采用滑模摊铺机施工法铺筑连续配筋混凝土路面时，布料最适合采用（ ）2016年",[421,423,425,427],{"key":20,"text":422,"correct":26},"正向上料的挖掘机",{"key":24,"text":424,"correct":26},"侧向上料的推土机",{"key":28,"text":426,"correct":26},"正向上料的装载机",{"key":31,"text":428,"correct":22},"侧向上料的供料机",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1134699,"某沥青混凝土路面出现微型裂纹，最适合对该路面2～3cm 厚表面层实施就地热再生的方法是（ ）。2015年",[433,435,437,439],{"key":20,"text":434,"correct":22},"整形再生法",{"key":24,"text":436,"correct":26},"重铺再生法",{"key":28,"text":438,"correct":26},"复拌再生法",{"key":31,"text":440,"correct":26},"厂拌热再生法",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},1134700,"可采用沥青混凝土摊铺机铺筑的水泥混凝土路面是（ ）。2012年",[445,447,449,451],{"key":20,"text":446,"correct":26},"钢筋混凝土路面",{"key":24,"text":448,"correct":26},"装配式混凝土路面",{"key":28,"text":450,"correct":22},"碾压混凝土路面",{"key":31,"text":452,"correct":26},"钢纤维混凝土路面",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},1134701,"不能用作旧沥青混凝土路面现场冷再生胶粘剂是（ ）。2013年",[457,459,461,463],{"key":20,"text":458,"correct":26},"乳化沥青",{"key":24,"text":460,"correct":26},"水泥",{"key":28,"text":462,"correct":22},"石灰",{"key":31,"text":464,"correct":26},"泡沫沥青",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1134702,"关于级配碎石基层施工的说法，正确的是（ ）。2013年",[469,471,473,475],{"key":20,"text":470,"correct":26},"碎石颗粒组成的级配曲线应为直线",{"key":24,"text":472,"correct":22},"级配碎石应在最佳含水量时进行碾压",{"key":28,"text":474,"correct":26},"应使用12t 以上的三轮压路机碾压，不得采用振动压路机碾压",{"key":31,"text":476,"correct":26},"级配碎石基层碾压完成后即可开放交通",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1134703,"下列路面结构层中，属于柔性基层的是（ ）。2017真题",[481,483,485,487],{"key":20,"text":482,"correct":26},"水泥稳定碎石基层",{"key":24,"text":484,"correct":22},"贯入式沥青碎石基层",{"key":28,"text":486,"correct":26},"二灰碎石基层",{"key":31,"text":488,"correct":26},"石灰稳定土基层",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},1134704,"下列基层中，不属于半刚性基层的是（ ）。2014年",[493,495,496,498],{"key":20,"text":494,"correct":26},"二灰稳定土基层",{"key":24,"text":488,"correct":26},{"key":28,"text":497,"correct":22},"沥青碎石基层",{"key":31,"text":482,"correct":26},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},1134705,"（2019年真题）热拌沥青碎石配合比设计采用（ ）设计。",[503,505,507,509],{"key":20,"text":504,"correct":26},"正交试验",{"key":24,"text":506,"correct":26},"针入度试验",{"key":28,"text":508,"correct":22},"马歇尔试验",{"key":31,"text":510,"correct":26},"洛杉矶磨耗试验",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1134706,"（2019年真题）关于透层施工说法错误的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":26},"气温低于10℃或大风、即将降雨时不得喷洒透层油",{"key":24,"text":518,"correct":22},"透层油洒布后应自由流淌，应渗入基层一定深度，在表面形成油膜",{"key":28,"text":520,"correct":26},"应按设计喷油量一次均匀洒布，当有漏洒时，应人工补洒",{"key":31,"text":522,"correct":26},"在摊铺沥青前，应将局部尚有多余的未渗入基层的沥青清除",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1134708,"（2020年真题）二级以及二级以上公路级配碎石底基层施工，推荐采用的拌合工艺及摊铺工艺分别是（ ）",[527,529,531,533],{"key":20,"text":528,"correct":26},"人工路拌，摊铺机摊铺",{"key":24,"text":530,"correct":22},"集中厂拌，摊铺机摊铺",{"key":28,"text":532,"correct":26},"人工路拌，推土机摊铺",{"key":31,"text":534,"correct":26},"集中厂拌，推土机摊铺",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1134709,"（2020年真题）按矿料级配分类,OGFC路面结构属于（ ）",[539,541,543,545],{"key":20,"text":540,"correct":22},"开级配沥青混合料",{"key":24,"text":542,"correct":26},"半开级配沥青混合料",{"key":28,"text":544,"correct":26},"密级配沥青混合料",{"key":31,"text":546,"correct":26},"间断级配沥青混合料",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1134710,"（2020年真题）热拌沥青混凝土路面施工工艺包括：①路缘石安装②试验段施工③喷洒透层油④混合料压实⑤沥青混合料摊铺⑥路面成型监测，其施工顺序是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"②→③→①→⑥→⑤→④",{"key":24,"text":554,"correct":22},"①→③→②→⑤→④→⑥",{"key":28,"text":556,"correct":26},"②→①→③→⑤→④→⑥",{"key":31,"text":558,"correct":26},"①→②→③→⑥→⑤→④",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1134711,"桥梁结构模板支架设计应考虑的荷载包括：①模板、支架和拱架自重；②新浇筑混凝土、钢筋混凝土或其他圬工结构物的重力；③施工人员和施工材料、机具等行走、运输或堆放的荷载；④振捣混凝土时产生的荷载；⑤新浇筑混凝土对侧面模板的压力；⑥倾倒混凝土时产生的水平荷载；⑦其他可能产生的荷载。其中现浇钢筋混凝土连续梁支架设计强度计算的荷载组合是（ ）。2015年",[563,565,567,569],{"key":20,"text":564,"correct":26},"①＋②＋⑤＋⑥＋⑦",{"key":24,"text":566,"correct":26},"①＋②＋③＋⑥＋⑦",{"key":28,"text":568,"correct":22},"①＋②＋③＋④＋⑦",{"key":31,"text":570,"correct":26},"②＋③＋④＋⑥＋⑦",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1134714,"由基础底面地基反力承担全部上部荷载的桥梁基础形式是（ ）。2013年",[575,577,579,581],{"key":20,"text":576,"correct":22},"扩大基础",{"key":24,"text":578,"correct":26},"端承摩擦桩基础",{"key":28,"text":580,"correct":26},"沉井基础",{"key":31,"text":582,"correct":26},"地下连续墙基础",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},1134717,"下列桩基础类型中，不属于按桩的使用功能分类的是（ ）。2012年 A.端承摩擦桩",[587,588,589],{"key":20,"text":304,"correct":22},{"key":24,"text":306,"correct":26},{"key":28,"text":308,"correct":26},{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1134718,"关于桥梁扩大基础特点的说法，错误的是（ ）。2016年",[594,596,598,600],{"key":20,"text":595,"correct":26},"主要承受压力",{"key":24,"text":597,"correct":22},"不能承受弯矩作用",{"key":28,"text":599,"correct":26},"适用于地基承载力较好的土层",{"key":31,"text":601,"correct":26},"由地基反力承担上部荷载",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":24,"analysis":33},1134719,"关于钢筋混凝土结构构造裂缝防治措施的说法，错误的是（ ）。2013年",[606,608,610,612],{"key":20,"text":607,"correct":26},"应适当降低混凝土水灰比和坍落度",{"key":24,"text":609,"correct":22},"应选用早强水泥，避免使用缓凝剂",{"key":28,"text":611,"correct":26},"应降低混凝土水化热、推迟水化热峰值出现时间",{"key":31,"text":613,"correct":26},"对支架应采用预压措施",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]