[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,18,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1134615,1,"单选题","（2019年真题）施工进度计划检查不包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","工程量完成情况",false,{"key":24,"text":25,"correct":22},"B","资源使用及进度的互配情况",{"key":27,"text":28,"correct":22},"C","上次检查提出问题的处理情况",{"key":30,"text":31,"correct":32},"D","标准化执行情况",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1134616,"（2020年真题）适用于时标网络图的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"横道图",{"key":24,"text":41,"correct":22},"S形曲线",{"key":27,"text":43,"correct":22},"香蕉图",{"key":30,"text":45,"correct":32},"前锋线比较法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1134617,"混合料的配合比试验属于（ ）。2013年",[50,52,54,56],{"key":20,"text":51,"correct":22},"原材料的验证试验",{"key":24,"text":53,"correct":32},"标准试验",{"key":27,"text":55,"correct":22},"工艺试验",{"key":30,"text":57,"correct":22},"构（配）件进场验证试验",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1134618,"关于公路工程标线施工技术要求的说法，错误的是（）。2018真题",[62,64,66,68],{"key":20,"text":63,"correct":32},"标线工程正式开工前应在试验室进行试划试验",{"key":24,"text":65,"correct":22},"正式化标线前，应首先清理路面，保证路面表面清洁干燥，然后根设计图纸进行放样",{"key":27,"text":67,"correct":22},"划线时，通过控制划线机的行驶速度控制标线厚度",{"key":30,"text":69,"correct":22},"标线充分干燥前，应放置适当的警告标志，阻止车辆及行人在作业区内通行",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1134619,"根据《公路工程标准施工招标文件》（2009版），工程量清单计日工明细表中所列工程数量为（ ）。2017真题",[74,76,78,80],{"key":20,"text":75,"correct":32},"招标方估计的工程量",{"key":24,"text":77,"correct":22},"招标设计图纸所列工程量",{"key":27,"text":79,"correct":22},"投标方估计的工程量",{"key":30,"text":81,"correct":22},"实际完成工程量",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1134620,"可用于测定路基土方最佳含水量的试验方法是（ ）。2013年",[86,88,90,92],{"key":20,"text":87,"correct":22},"灌砂法",{"key":24,"text":89,"correct":22},"环刀法",{"key":27,"text":91,"correct":32},"重型击实试验法",{"key":30,"text":93,"correct":22},"核子密度湿度仪法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1134621,"关于公路工程质量评分方法的说法，错误的是（ ）。2014年",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程质量检验评分以分项工程为单元",{"key":24,"text":101,"correct":22},"工程质量评定等级分为合格与不合格两个等级",{"key":27,"text":103,"correct":22},"工程监理单位应按规定要求对工程质量进行独立抽检",{"key":30,"text":105,"correct":32},"建设单位应对公路工程质量进行最终检测评定",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1134622,"下列计划中，不属于资源计划的是（）。2018真题",[110,112,114,116],{"key":20,"text":111,"correct":22},"劳动力计划",{"key":24,"text":113,"correct":32},"施工进度计划",{"key":27,"text":115,"correct":22},"材料计划",{"key":30,"text":117,"correct":22},"施工机械设备计划",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1134623,"根据《公路工程质量检验评定标准》，下列检测项目中，不属于沥青混凝土桥面铺装施工质量检测实测项目的是（ ）。2016年",[122,124,126,128],{"key":20,"text":123,"correct":32},"弯沉值",{"key":24,"text":125,"correct":22},"厚度",{"key":27,"text":127,"correct":22},"平整度",{"key":30,"text":129,"correct":22},"抗滑构造深度",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1134624,"下列高速公路环保工程质量检验实测项目中，不属于中央分隔带绿化实测项目的是（ ）。2017真题",[134,136,138,140],{"key":20,"text":135,"correct":32},"降噪效果",{"key":24,"text":137,"correct":22},"土层厚度",{"key":27,"text":139,"correct":22},"苗木成活率",{"key":30,"text":141,"correct":22},"草坪覆盖率",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1134625,"（2019年真题）水泥混凝土抗压强度试件为边长（ ）mm正方体。",[146,148,150,152],{"key":20,"text":147,"correct":22},"100",{"key":24,"text":149,"correct":32},"150",{"key":27,"text":151,"correct":22},"200",{"key":30,"text":153,"correct":22},"250",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1134626,"（2020年真题）不能测量最佳含水量（ ）",[158,160,162,164],{"key":20,"text":159,"correct":22},"标准击实试验",{"key":24,"text":161,"correct":22},"振动台法",{"key":27,"text":163,"correct":22},"表面振动击实仪法",{"key":30,"text":165,"correct":32},"核子密度湿度仪",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1134627,"根据《公路水运工程安全生产监督管理办法》，施工现场使用承租机械设备和施工机具及配件时，应由（ ）共同进行验收，合格后方可使用。2013年",[170,172,174,176],{"key":20,"text":171,"correct":22},"监理单位和施工单位",{"key":24,"text":173,"correct":22},"监理单位和业主单位",{"key":27,"text":175,"correct":32},"承租单位和安装单位",{"key":30,"text":177,"correct":22},"承租单位和监理单位",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1134628,"关于高处作业安全技术要求的说法，错误的是（ ）。2017真题",[182,184,186,188],{"key":20,"text":183,"correct":22},"高处作业场所临边应设置安全防护栏杆",{"key":24,"text":185,"correct":22},"安全带应高挂低用，并应扣牢在牢固的物体上",{"key":27,"text":187,"correct":22},"钢直梯高度大于2m应设护笼",{"key":30,"text":189,"correct":32},"防护栏杆应能承受500N的可变荷载",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1134629,"关于悬臂浇筑法施工安全控制的说法，错误的是（ ）。2013年",[194,196,198,200],{"key":20,"text":195,"correct":32},"挂篮组拼后，要进行全面检查，并做动载试验",{"key":24,"text":197,"correct":22},"挂篮上的施工遇6 级以上大风应停止作业",{"key":27,"text":199,"correct":22},"挂篮作业平台边缘必须设场脚板",{"key":30,"text":201,"correct":22},"已浇筑过的梁段上应安装1.2m 高的桥面临时护栏",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1134630,"某瓦斯隧道，凿岩台车操作平台的高度为3.5m，在平台上进行凿岩作业，属于（ ）高处作业。2016年",[206,208,210,212],{"key":20,"text":207,"correct":22},"1 级",{"key":24,"text":209,"correct":32},"2 级",{"key":27,"text":211,"correct":22},"3 级",{"key":30,"text":213,"correct":22},"4 级",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1134631,"下列施工段落划分中，不符合通常划分原则的是（）。2018真题",[218,220,222,224],{"key":20,"text":219,"correct":22},"各段落之间工程量基本平衡",{"key":24,"text":221,"correct":32},"土方段落中的小型构造物另划分一个工段",{"key":27,"text":223,"correct":22},"避免造成段落之间的施工干扰",{"key":30,"text":225,"correct":22},"保护构造物的完整性",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},1134632,"关于钻孔灌注桩基础施工安全控制要点的说法，错误的是（ ）。2016年",[230,232,234,236],{"key":20,"text":231,"correct":22},"各类钻机在作业中，应由本机或机管负责人指定的操作人员操作",{"key":24,"text":233,"correct":22},"采用冲击钻孔时，应随时检查选用的钻锥、卷扬机和钢丝绳的损伤情况",{"key":27,"text":235,"correct":32},"钻机停钻，钻头应置于孔内",{"key":30,"text":237,"correct":22},"钻孔过程中，必须设专人按规定指标保持孔内水位的高度及泥浆的稠度",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},1134633,"关于人工挖孔桩安全控制要求的说法，错误的是（ ）。2017真题",[242,244,246,248],{"key":20,"text":243,"correct":22},"同排桩应采用跳槽开挖方法",{"key":24,"text":245,"correct":22},"土层或破碎岩石中挖孔桩应采用钢筋混凝土护壁",{"key":27,"text":247,"correct":32},"孔内爆破宜采用深眼松动爆破",{"key":30,"text":249,"correct":22},"孔口处应设置护圈，且护圈应高出地面0.3m",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},1134634,"既决定工程全局的关键，又是工程施工组织设计核心内容的是（）。2018真题",[254,256,258,260],{"key":20,"text":255,"correct":22},"工程设备",{"key":24,"text":257,"correct":22},"工程主要材料",{"key":27,"text":259,"correct":22},"工程工期要求",{"key":30,"text":261,"correct":32},"施工方案",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":30,"analysis":33},1134635,"关于施工测量与工地试验的方法，正确的是（）。2018真题",[266,268,270,272],{"key":20,"text":267,"correct":22},"施工测量与工地试验人员只要能胜任工作，无须培训即可上岗",{"key":24,"text":269,"correct":22},"测量仪器，试验设备未经标定可以短期使用",{"key":27,"text":271,"correct":22},"测量、试验记录可以根据需要进行适当优化",{"key":30,"text":273,"correct":32},"现场测量数据处理计算资料必须换人复核，工地试验室应定期接受母体检测机构的检查指导",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},1134636,"（2019年真题）应急预案评估每（ ）一次。",[278,280,282,284],{"key":20,"text":279,"correct":22},"半年",{"key":24,"text":281,"correct":22},"一年",{"key":27,"text":283,"correct":22},"两年",{"key":30,"text":285,"correct":32},"三年",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1134637,"（2020年真题）关于支架现浇法施工风险控制措施的说法，错误的是（ ）",[290,292,294,296],{"key":20,"text":291,"correct":22},"支架法施工前，应进行专项安全设计，并制定安装、拆除程序和安全技术措施",{"key":24,"text":293,"correct":22},"支架立柱底部应铺设垫板或混凝土垫块扩散压力",{"key":27,"text":295,"correct":32},"满堂支架应设置的纵向剪刀撑，应由底至顶按间距不大于2m网格?",{"key":30,"text":297,"correct":22},"支架地基处应有排水措施，严禁被水浸泡",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},1134638,"根据《公路工程标准施工招标文件》（2009 年版），组成合同的各项文件包括：①中标通知书；②合同协议书及各种合同附件；③项目专用合同条款；④已标价工程量清单等。除项目合同条款约定外，合同文件的优先解释顺序是（ ）。2012年",[302,304,306,308],{"key":20,"text":303,"correct":22},"①一②一③一④",{"key":24,"text":305,"correct":22},"③一①一②一④",{"key":27,"text":307,"correct":22},"②一③一④一①",{"key":30,"text":309,"correct":32},"②一①一③一④",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},1134639,"关于分包合同管理关系的说法，错误的是（ ）。2017真题",[314,316,318,320],{"key":20,"text":315,"correct":22},"发包人与分包人没有合同关系",{"key":24,"text":317,"correct":22},"监理人对分包人的现场施工不承担协调和管理义务",{"key":27,"text":319,"correct":32},"监理人就分包工程施工发布的指示均应发给承包人和分包人",{"key":30,"text":321,"correct":22},"承包人对分包工程的实施具有全面管理责任",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},1134640,"根据《公路工程施工分包管理办法》，下列说法错误的是（ ）。2015年",[326,328,330,332],{"key":20,"text":327,"correct":22},"分包工程在开工前，承包人必须填报开工报审表，并附有监理人审批且取得发包人同意的书面文件",{"key":24,"text":329,"correct":22},"监理人收到分包工程开工报审表后，审查其是否具备开工条件，确定是否批复其开工申请",{"key":27,"text":331,"correct":22},"监理人应检查核实分包人实施分包工程的主要人员与施工设备",{"key":30,"text":333,"correct":32},"监理人应对分包工程实施现场监管，及时发现分包工程在质量、进度等方面的问题，并通知分包人及时采取措施",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1134641,"（2019年真题）合同约定共同延误按不利于承包商原则，由于恶劣环境和业主延迟发放图纸共同存在，承包商可以索赔（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"工期补偿和经济补偿",{"key":24,"text":341,"correct":32},"工期补偿，不可以经济补偿",{"key":27,"text":343,"correct":22},"工期不可补偿，经济可以补偿",{"key":30,"text":345,"correct":22},"工期和经济都不可补偿",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},1134642,"（2020年真题）工程项目的“计划成本偏差”等于( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"施工图预算成本-责任目标成本",{"key":24,"text":353,"correct":22},"施工图预算成本-投标计划成本",{"key":27,"text":355,"correct":32},"施工预算成本-责任目标成本",{"key":30,"text":357,"correct":22},"施工预算成本-投标计划成本",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},1134643,"投标报价计算时，所填入的工程量清单的单价包括人工费、材料费、机械使用费，其他工程费、间接费、利润和税金以及风险金等全部费用，构成基础单价，此种方法称（ ）。2016年",[362,364,366,368],{"key":20,"text":363,"correct":22},"工料单价法",{"key":24,"text":365,"correct":22},"基价计量法",{"key":27,"text":367,"correct":32},"综合单价法",{"key":30,"text":369,"correct":22},"清单计价法",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1134644,"公路工程造价组成中，材料的检验试验费属于（ ）。2012年",[374,376,378,380],{"key":20,"text":375,"correct":22},"直接工程费",{"key":24,"text":377,"correct":32},"其他工程费",{"key":27,"text":379,"correct":22},"研究试验费",{"key":30,"text":381,"correct":22},"基本预备费",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},1134645,"关于施工机械台班预算单价中安装拆卸及辅助设施费的说法，错误的是（ ）。2015年",[386,388,390,392],{"key":20,"text":387,"correct":22},"该费用指机械在施工现场进行安装、拆卸所需的人工费、材料费、机械费、试运转费以及安装所需的辅助设施费",{"key":24,"text":389,"correct":22},"辅助设施费包括安装机械的基础、底座及固定的锚桩等项费用",{"key":27,"text":391,"correct":32},"属于台班单价的可变费用",{"key":30,"text":393,"correct":22},"混凝土搅拌站（楼）的安装、拆卸费用不在此费用内，需另行计算",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},1134646,"（2019年真题）应单独计量的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"模板",{"key":24,"text":401,"correct":22},"脚手架",{"key":27,"text":403,"correct":22},"垫圈",{"key":30,"text":405,"correct":32},"箍筋",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1134647,"关于特大桥、隧道、拌合站和预制场等进出口便道200m范围宜采用的路面的说法，正确的是（ ）。2017真题",[410,412,414,416],{"key":20,"text":411,"correct":22},"预制场进出口宜采用泥结碎石路面",{"key":24,"text":413,"correct":22},"隧道洞口宜采用洞渣铺筑的路面",{"key":27,"text":415,"correct":32},"特大桥进出便道路面宜采用不小于20cm厚C20混凝土路面",{"key":30,"text":417,"correct":22},"拌合站进出口宜采用级配碎石路面",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},1134648,"项目部编制材料供应计划时，主要依据是（ ）。2013年",[422,424,426,428],{"key":20,"text":423,"correct":22},"材料用款计划",{"key":24,"text":425,"correct":32},"材料需用量计划",{"key":27,"text":427,"correct":22},"材料采购计划",{"key":30,"text":429,"correct":22},"材料价格调整计划",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1134649,"水泥混凝土拌和站基本组成一般不包括（ ）。2013年",[434,436,438,440],{"key":20,"text":435,"correct":22},"物料储存系统",{"key":24,"text":437,"correct":22},"物料称量系统",{"key":27,"text":439,"correct":32},"烘干加热系统",{"key":30,"text":441,"correct":22},"搅拌主机和电气控制系统",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},1134650,"劳务用工管理工作的第一责任人是（ ）。2012年",[446,448,450,452],{"key":20,"text":447,"correct":22},"包工头",{"key":24,"text":449,"correct":22},"班组长",{"key":27,"text":451,"correct":32},"用工单位法定代表人",{"key":30,"text":453,"correct":22},"项目经理",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},1134651,"关于控制供料成本措施的说法，错误的是（ ）。2016年",[458,460,462,464],{"key":20,"text":459,"correct":32},"控制施工现场运输损耗",{"key":24,"text":461,"correct":22},"控制采购及保管费",{"key":27,"text":463,"correct":22},"控制实际采购价低于预算中的材料原价",{"key":30,"text":465,"correct":22},"控制实际发生的运杂费低于预算运杂费",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},1134652,"材料的采购及保管费不包括（ ）。2015年",[470,472,474,476],{"key":20,"text":471,"correct":22},"仓管费",{"key":24,"text":473,"correct":22},"物资采购人员的工资",{"key":27,"text":475,"correct":32},"场内运输费",{"key":30,"text":477,"correct":22},"仓储损耗",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1134653,"根据《高速公路施工标准化技术指南》，预制桥梁梁板台座底模应采用（ ）。2014年",[482,484,486,488],{"key":20,"text":483,"correct":22},"木底模",{"key":24,"text":485,"correct":22},"混凝土底模",{"key":27,"text":487,"correct":32},"钢板底模",{"key":30,"text":489,"correct":22},"浆砌片石底模",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1134654,"（2019年真题）关于预制梁场布设错误的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"结合梁板的尺寸、数量、架设要求以及运输条件等情况进行综合选址",{"key":24,"text":497,"correct":32},"监理指定预制场位置",{"key":27,"text":499,"correct":22},"周围无塌方、滑坡、落石、泥石流、洪涝等地质灾害",{"key":30,"text":501,"correct":22},"场地建设前施工单位应将梁场布置方案报监理工程师审批",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1134655,"下列施工机械中，不适用于开挖的是（ ）。2016年",[506,508,510,512],{"key":20,"text":507,"correct":22},"平地机",{"key":24,"text":509,"correct":32},"铲运机",{"key":27,"text":511,"correct":22},"推土机",{"key":30,"text":513,"correct":22},"挖掘机",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1134656,"在隧道衬砌施工中，通常不采用的机械设备是（ ）。2015年",[518,520,522,524],{"key":20,"text":519,"correct":22},"模板衬砌台车",{"key":24,"text":521,"correct":22},"混凝土搅拌设备",{"key":27,"text":523,"correct":32},"混凝土喷射机",{"key":30,"text":525,"correct":22},"搅拌运输车",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},1134657,"下列施工机械中，属于隧道施工专用设备的是（ ）。2017真题",[530,532,534,536],{"key":20,"text":531,"correct":22},"轴流风机",{"key":24,"text":533,"correct":22},"装载机",{"key":27,"text":535,"correct":32},"凿岩台机",{"key":30,"text":523,"correct":22},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":30,"analysis":33},1134658,"由于铁路运输部门原因，承包方机械未按期运入现场，导致工期延误，该种工期延误属于（）延误。2018真题",[541,543,545,547],{"key":20,"text":542,"correct":22},"可原谅，可补偿",{"key":24,"text":544,"correct":22},"可原谅，不可补偿",{"key":27,"text":546,"correct":22},"不可原谅，可补偿",{"key":30,"text":548,"correct":32},"不可原谅，不可补偿",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1134659,"工程变更通常实行分级审批管理制度，一般工程设计变更由（）签署工程变更令。2018真题",[553,555,557,559],{"key":20,"text":554,"correct":22},"驻地监理工程师",{"key":24,"text":556,"correct":32},"总监理工程师",{"key":27,"text":558,"correct":22},"业主",{"key":30,"text":560,"correct":22},"国家计划主管部门",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1134660,"为保护开挖限界以外山体，使拟爆体与山体分开，可采用的爆破方法是（）。2012年",[565,567,569,571],{"key":20,"text":566,"correct":32},"预裂爆破",{"key":24,"text":568,"correct":22},"光面爆破",{"key":27,"text":570,"correct":22},"微差爆破",{"key":30,"text":572,"correct":22},"硐室爆破",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1134661,"一般土质路基中，低路堤应对地基表层土（），分层回填压实，其处理深度不应小于路床深度。2018真题",[577,579,581,583],{"key":20,"text":578,"correct":32},"超挖",{"key":24,"text":580,"correct":22},"振动碾压",{"key":27,"text":582,"correct":22},"掺粉煤灰拌合",{"key":30,"text":584,"correct":22},"整平",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},1134662,"塑料排水板的施工工艺流程中，“插入套管“的前一道工序是（）。2014年",[589,591,593,595],{"key":20,"text":590,"correct":22},"拔出导管",{"key":24,"text":592,"correct":22},"隔断塑料排水板",{"key":27,"text":594,"correct":22},"机具就位",{"key":30,"text":596,"correct":32},"塑料排水板穿靴",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":30,"analysis":33},1134663,"山区公路中，雨期路基施工地段不宜选择（）。2018真题",[601,603,605,607],{"key":20,"text":602,"correct":22},"砂类土地段",{"key":24,"text":604,"correct":22},"路堑的弃方地段",{"key":27,"text":606,"correct":22},"碎砾石地段",{"key":30,"text":608,"correct":32},"重黏土地段",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":20,"analysis":33},1134664,"砂井套管法施工工艺中，拔管的紧前工序是（）。2016年",[613,615,617,619],{"key":20,"text":614,"correct":32},"加料压实",{"key":24,"text":616,"correct":22},"桩管沉入",{"key":27,"text":618,"correct":22},"插入套管",{"key":30,"text":620,"correct":22},"机具移位",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]