[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,16,50,1523,[13,34,46,58,70,82,94,106,114,126,138,150,162,174,186,198,210,221,233,245,257,265,277,289,301,313,323,335,347,359,370,382,394,406,418,430,442,454,466,478,490,502,514,526,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1134513,1,"单选题","关于应力钢绞线进场检测验收的说法，正确的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","每批进行拉力和冷弯试验",false,{"key":24,"text":25,"correct":22},"B","每批进行抗拉强度和弯曲试验",{"key":27,"text":28,"correct":22},"C","每批进行长度与直径偏差及力学性能试验",{"key":30,"text":31,"correct":32},"D","每批进行表面质量、直径偏差和力学性能试验",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1134514,"在进行混凝土强度试配合质量评定时，混凝土的抗压强度应以边长为（ ）mm的立方体尺寸标准试件测定。",[38,40,42,44],{"key":20,"text":39,"correct":22},"120",{"key":24,"text":41,"correct":32},"150",{"key":27,"text":43,"correct":22},"160",{"key":30,"text":45,"correct":22},"200",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1134515,"桥梁钢筋骨架施焊顺序错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"由中到边对称地向两端进行",{"key":24,"text":53,"correct":22},"先焊骨架下部，后焊骨架上部",{"key":27,"text":55,"correct":22},"相邻的焊缝采用分区对称跳焊",{"key":30,"text":57,"correct":32},"顺骨架轴线方向一次焊成",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1134516,"钢筋在工地现场存放的时间不宜超过（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"2个月",{"key":24,"text":65,"correct":22},"3个月",{"key":27,"text":67,"correct":32},"6个月",{"key":30,"text":69,"correct":22},"1年",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1134517,"预制构件的吊环,必须采用（ ）制作,且其使用时的计算拉应力应不大于50MPA。",[74,76,78,80],{"key":20,"text":75,"correct":22},"经冷拉的热轧螺纹钢筋",{"key":24,"text":77,"correct":22},"经冷拉的冷轧光圆钢筋",{"key":27,"text":79,"correct":22},"未经冷拉的冷轧螺纹钢筋",{"key":30,"text":81,"correct":32},"未经冷拉的热轧光圆钢筋",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1134518,"轴心受拉和小偏心受拉构件中的钢筋接头，不宜绑接，直径不大于（ ）mm的钢筋，宜采用焊接。",[86,88,90,92],{"key":20,"text":87,"correct":22},"18",{"key":24,"text":89,"correct":22},"22",{"key":27,"text":91,"correct":32},"32",{"key":30,"text":93,"correct":22},"25",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1134519,"钢筋的纵向焊接应采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"电弧焊",{"key":24,"text":101,"correct":22},"气压焊",{"key":27,"text":103,"correct":22},"电渣压力焊",{"key":30,"text":105,"correct":32},"闪光对焊",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1134520,"桥梁钢筋的纵向焊接有条件应尽量采用（ ）。",[110,111,112,113],{"key":20,"text":99,"correct":22},{"key":24,"text":103,"correct":22},{"key":27,"text":101,"correct":22},{"key":30,"text":105,"correct":32},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},1134521,"电弧焊接和绑扎接头与钢筋弯曲处的距离不应小于（ ）倍钢筋直径。",[118,120,122,124],{"key":20,"text":119,"correct":22},"5",{"key":24,"text":121,"correct":32},"10",{"key":27,"text":123,"correct":22},"20",{"key":30,"text":125,"correct":22},"30",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},1134522,"关于泵送混凝土的说法,错误的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"泵送混凝土应选用硅酸盐水泥、普通硅酸盐水泥,不宜使用火山灰质硅酸盐水泥",{"key":24,"text":133,"correct":32},"粗集料宜采用连续级配,其针片状颗粒不宜大于15%",{"key":27,"text":135,"correct":22},"泵送混凝土中应掺入泵送剂或减水剂",{"key":30,"text":137,"correct":22},"混凝土运至浇筑地点后发生离析、严重泌水或坍落度不符合要求时,应进行第二次搅拌",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1134523,"关于人工挖孔桩安全控制要求的说法,错误的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"同排桩应釆用跳槽开挖方法",{"key":24,"text":145,"correct":22},"土层或破碎岩石中挖孔桩应采用的混凝土护壁",{"key":27,"text":147,"correct":32},"孔内爆破宜采用深眼松动爆破",{"key":30,"text":149,"correct":22},"孔口处应设置护圈,且护圈应高出地面0.3m",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},1134524,"适用于各种钻孔方法的灌注桩，并且清孔较为彻底的钻孔方法是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":32},"抽浆法",{"key":24,"text":157,"correct":22},"换浆法",{"key":27,"text":159,"correct":22},"掏渣法",{"key":30,"text":161,"correct":22},"喷射清孔法",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},1134525,"钻孔灌注桩施工的主要工序正确的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"钻孔→埋设护筒→制备泥浆→清底→钢筋笼制作与吊装→灌注水下混凝土",{"key":24,"text":169,"correct":32},"埋设护筒→制备泥浆→钻孔→清底→钢筋笼制作与吊装→灌注水下混凝土",{"key":27,"text":171,"correct":22},"钻孔→灌注水下混凝土→埋设护筒→制备泥浆→钻孔→清底→钢筋笼制作与吊装",{"key":30,"text":173,"correct":22},"制备泥浆→埋设护筒→钻孔→钢筋笼制作与吊装→清底→灌注水下混凝土",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},1134526,"某梁式桥，上部构造为11孔22m无横隔板装配式钢筋混凝土T梁，横向五根梁，下部构造桥墩为单排4根直径80cm钻孔灌注桩基础，双柱式钢筋混凝土墩身，桥台为5根断面为30cm×30cm的钢筋混凝土打入桩加盖梁组成。问题：在钻孔灌注桩施工中，钻孔的倾斜度允许偏差为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":32},"1%",{"key":24,"text":181,"correct":22},"1.5%",{"key":27,"text":183,"correct":22},"2%",{"key":30,"text":185,"correct":22},"3%",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1134527,"钻孔灌注桩施工中，下列关于护筒的作用说法错误的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"起到钻头导向作用",{"key":24,"text":193,"correct":22},"隔离地表水",{"key":27,"text":195,"correct":32},"支护桩壁",{"key":30,"text":197,"correct":22},"固定桩孔位置",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1134528,"下列关于边坡失稳的预防及处理措施错误的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"基坑开挖之前，应先做好地面排水系统",{"key":24,"text":205,"correct":32},"基坑开挖时应抓紧时间进行开挖，开挖时间不能过长，并且要开挖结束后及时支护",{"key":27,"text":207,"correct":22},"基坑应尽量安排在少雨季节施工",{"key":30,"text":209,"correct":22},"坑顶边缘应有一定的距离作护道，堆载距坑缘不小于1m",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1134529,"下列关于基坑开挖边坡失稳的预防及处理措施错误的是（ ）。",[214,216,218,219],{"key":20,"text":215,"correct":22},"基坑开挖之前,应先做好地面排水系统",{"key":24,"text":217,"correct":32},"对地质情况发生变化的地层应在开挖结束后及时支护",{"key":27,"text":207,"correct":22},{"key":30,"text":220,"correct":22},"坑顶边缘应有一定的距离作护道,动载距坑缘不小于1.0m",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":27,"analysis":33},1134530,"下列关于基底检验说法不正确的是（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"小桥涵的地基，一般采用直观或触探方法",{"key":24,"text":228,"correct":22},"特殊设计的小桥涵对地基沉陷有严格要求，且土质不良时，宜进行荷载试验",{"key":27,"text":230,"correct":32},"对经加固处理后的特殊地基，一般采用荷载试验",{"key":30,"text":232,"correct":22},"大、中桥地基，一般由检验人员用直观、触探、挖试坑或钻探试验等方法，确定土质容许承载力是否符合设计要求",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1134531,"下列关于基础施工说法正确的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"干涸无水河滩、河沟中坑壁也要支撑",{"key":24,"text":240,"correct":32},"有水经改河或筑堤能排除地表水的河沟中坑壁可不支撑",{"key":27,"text":242,"correct":22},"基础埋置不深就不用支撑",{"key":30,"text":244,"correct":22},"不管何种情况下都要采取支撑措施",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1134532,"适用于深水基础施工的围堰工程是()。",[249,251,253,255],{"key":20,"text":250,"correct":22},"钢板桩围堰",{"key":24,"text":252,"correct":32},"双壁钢围堰",{"key":27,"text":254,"correct":22},"套箱围堰",{"key":30,"text":256,"correct":22},"土围堰",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1134533,"适用于各类土（包括强风化岩）的水中基坑施工的围堰是()。",[261,262,263,264],{"key":20,"text":250,"correct":32},{"key":24,"text":252,"correct":22},{"key":27,"text":254,"correct":22},{"key":30,"text":256,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},1134534,"下列关于石砌墩台施工的说法错误的是()。",[269,271,273,275],{"key":20,"text":270,"correct":22},"石砌墩台是用片石、块石及粗料石以水泥砂浆砌筑的",{"key":24,"text":272,"correct":32},"浆砌片石一般适用于高度小于10m的墩台身、基础、镶面",{"key":27,"text":274,"correct":22},"浆砌粗料石则用于磨耗及冲击严重的分水体及破冰体的镶面工程",{"key":30,"text":276,"correct":22},"浆砌块石一般用于应力要求大于浆砌片石砌体强度的墩台",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1134535,"斜拉桥施工时，在主梁悬梁浇筑或悬臂拼装过程中，确保主梁线形和顺、正确是第一位的，施工中以（ ）控制为主。",[281,283,285,287],{"key":20,"text":282,"correct":22},"拉索索力",{"key":24,"text":284,"correct":32},"标高",{"key":27,"text":286,"correct":22},"预制块件接缝转角",{"key":30,"text":288,"correct":22},"混凝土强度",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},1134536,"关于缆索吊装施工的说法，错误的是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":32},"主索系统试吊分静载试吊和吊重运行两步",{"key":24,"text":296,"correct":22},"试吊重物可以为构件、钢筋混凝土预制件",{"key":27,"text":298,"correct":22},"风缆应成对称布置",{"key":30,"text":300,"correct":22},"地锚应预先试拉",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":20,"analysis":33},1134537,"转体施工工艺是（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":32},"脱架→转动→转盘封固→撤锚合龙",{"key":24,"text":308,"correct":22},"转动→转盘封固→撤锚合龙→脱架",{"key":27,"text":310,"correct":22},"脱架→转动→撤锚合龙→转盘封固",{"key":30,"text":312,"correct":22},"撤锚合龙→转动→脱架→转盘封固",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":30,"analysis":33},1134538,"桥梁上部结构转体施工工艺包括脱架、撤锚合龙、转动、转盘封固，正确的工艺顺序是（ ）。",[317,319,320,322],{"key":20,"text":318,"correct":22},"转盘封固→转动→脱架→撤锚合龙",{"key":24,"text":308,"correct":22},{"key":27,"text":321,"correct":22},"转盘封固→转动→撤锚合龙→脱架",{"key":30,"text":306,"correct":32},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":20,"analysis":33},1134539,"竖转施工主要适用于转体重量不大的（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":32},"拱桥",{"key":24,"text":330,"correct":22},"刚构梁式桥",{"key":27,"text":332,"correct":22},"斜拉桥",{"key":30,"text":334,"correct":22},"吊桥",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":30,"analysis":33},1134540,"在浇筑箱梁截面混凝土时，若设计无明确要求，一般的浇筑顺序包括：①浇筑混凝土时，必须从悬臂端开始，两个悬臂端应对称均衡地进行浇筑；②在浇筑混凝土的同时应注意对预应力管道的保护，浇筑后应及时对管道清孔，以利穿束；③浇筑混凝土时，应加强振捣，对于高箱梁混凝土施工，可采用内侧模开仓振捣；下述关于其顺序正确的是（ ）",[339,341,343,345],{"key":20,"text":340,"correct":22},"①→②→③",{"key":24,"text":342,"correct":22},"③→①→②",{"key":27,"text":344,"correct":22},"②→①→③",{"key":30,"text":346,"correct":32},"①→③→②",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},1134541,"桥梁上部结构悬臂浇筑法施工中，为减少因温度变化而使对合拢段混凝土产生拉应力，合龙段的混凝土宜在一天中气温（ ）且稳定的时段内浇筑。",[351,353,355,357],{"key":20,"text":352,"correct":22},"平均气温",{"key":24,"text":354,"correct":22},"最高气温",{"key":27,"text":356,"correct":32},"最低气温",{"key":30,"text":358,"correct":22},"任意",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},1134542,"挂篮在行走和浇筑混凝土状态时的安全系数，均不应小于（ ）。",[363,365,367,368],{"key":20,"text":364,"correct":22},"1",{"key":24,"text":366,"correct":32},"2",{"key":27,"text":119,"correct":22},{"key":30,"text":369,"correct":22},"8",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1134543,"对于大跨径的预应力混凝土悬臂梁桥，其0号、1号块的施工一般采用（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"扇形托架浇筑",{"key":24,"text":377,"correct":22},"满堂架浇筑",{"key":27,"text":379,"correct":22},"预制吊装",{"key":30,"text":381,"correct":22},"挂篮浇筑",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1134544,"适用于平坦无水桥孔的中小跨径预制梁板安装的方法是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":32},"自行式吊机架设法",{"key":24,"text":389,"correct":22},"简易型钢导梁架设法",{"key":27,"text":391,"correct":22},"联合架桥机架设法",{"key":30,"text":393,"correct":22},"双导梁架桥机架设法",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1134545,"先张法预应力筋的张拉过程中，应抽查预应力筋的预应力值，其偏差的绝对值不得超过（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":32},"按一个构件全部预应力筋预应力总值的5%",{"key":24,"text":401,"correct":22},"按全体构件预应力筋平均值的5%",{"key":27,"text":403,"correct":22},"按一个构件单根预应力值的5%",{"key":30,"text":405,"correct":22},"按全体构件预应力筋最大值的5%",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1134546,"先张法预应力筋的张拉过程中，张拉操作时，应对断丝情况进行检查，其要求（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":32},"同一构件内预应力钢丝、钢绞线的断丝数量不得超过1%，同时对于预应力钢筋不允许断筋",{"key":24,"text":413,"correct":22},"同一构件内预应力钢丝的断丝数量可不超过2根，且不得超过1%，同时对于预应力钢筋不允许断筋",{"key":27,"text":415,"correct":22},"同一构件内预应力钢丝、钢绞线不允许断丝，同时对于预应力钢筋断丝数量不得超过1%",{"key":30,"text":417,"correct":22},"同一构件内预应力钢丝、钢绞线的断丝数量不得超过1%，同时对于预应力钢筋不得超过1根",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1134547,"在悬臂浇筑施工中，挂篮组拼后，应全面检查安装质量，并对挂篮进行试压，以消除结构的非弹性变形。挂篮试压的最大荷载可按（ ）考虑。",[422,424,426,428],{"key":20,"text":423,"correct":22},"全跨浇注梁段重量的1.2倍",{"key":24,"text":425,"correct":22},"各悬浇梁段平均重量的1.2倍",{"key":27,"text":427,"correct":32},"最大悬浇梁段重量的1.3倍",{"key":30,"text":429,"correct":22},"各悬浇梁段平均重量的1.3倍",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1134548,"悬索桥施工架设主要工序中，索夹和吊索安装的前一工序为（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"塔柱和锚碇施工",{"key":24,"text":437,"correct":32},"索股架设",{"key":27,"text":439,"correct":22},"加劲梁架设和桥面铺装施工",{"key":30,"text":441,"correct":22},"牵引系统和猫道系统",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1134549,"应用较早，施工简单，能保证几何尺寸（包括复杂断面），外观整洁，但模板高空翻转，操作危险，沿海地区不宜用的是（ ）法。",[446,448,450,452],{"key":20,"text":447,"correct":32},"翻模",{"key":24,"text":449,"correct":22},"爬模",{"key":27,"text":451,"correct":22},"两室支架法",{"key":30,"text":453,"correct":22},"滑模",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1134550,"钢管混凝土的质量检测办法应以（ ）为主。",[458,460,462,464],{"key":20,"text":459,"correct":22},"红外线检测",{"key":24,"text":461,"correct":32},"超声波检测",{"key":27,"text":463,"correct":22},"钻芯检测",{"key":30,"text":465,"correct":22},"人工敲击检测",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1134551,"扣索布置应满足（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"与所扣挂的拱肋在同一水平面内",{"key":24,"text":473,"correct":32},"与所扣挂的拱肋在同一竖直面内",{"key":27,"text":475,"correct":22},"扣索应布置在拱肋的中部",{"key":30,"text":477,"correct":22},"扣索必须与主塔固结",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1134552,"刚构桥采用悬臂拼装法施工时，块件拼装接缝一般为（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"干接缝与胶接缝",{"key":24,"text":485,"correct":32},"湿接缝与胶接缝",{"key":27,"text":487,"correct":22},"平接缝与榫接缝",{"key":30,"text":489,"correct":22},"平接缝与企口接缝",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1134553,"大跨径劲性骨架混凝土拱桥拱圈浇筑前应进行（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"施工观测",{"key":24,"text":497,"correct":32},"加载程序设计",{"key":27,"text":499,"correct":22},"施工组织设计",{"key":30,"text":501,"correct":22},"方案调整",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},1134554,"缆索吊装施工时，应对预制的拱肋在吊装、搁置、安装等状况下进行（ ）验算。",[506,508,510,512],{"key":20,"text":507,"correct":22},"稳定",{"key":24,"text":509,"correct":22},"应力",{"key":27,"text":511,"correct":22},"挠度",{"key":30,"text":513,"correct":32},"强度",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},1134555,"关于钢管混凝土的管内混凝土质量要求的说法,错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":32},"管内混凝土应与管壁分离",{"key":24,"text":521,"correct":22},"对大跨径钢管混凝土拱桥,需按实际泵送距离和高度进行模拟混凝土压注试验",{"key":27,"text":523,"correct":22},"管内混凝土的配料强度比设计强度高10%~15%",{"key":30,"text":525,"correct":22},"钢管混凝土的泵送顺序宜采用先钢管后腹箱的施工程序",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1134556,"平转施工可用于（ ）。",[530,532,534,535],{"key":20,"text":531,"correct":22},"钢筋混凝土梁桥",{"key":24,"text":533,"correct":32},"钢管拱桥",{"key":27,"text":334,"correct":22},{"key":30,"text":536,"correct":22},"石拱桥",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1134557,"连续刚构桥悬臂拼装施工的主要工艺顺序正确的是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"块件预制→预应力张拉→移运→整修→施工接缝处理→吊装定位",{"key":24,"text":544,"correct":32},"块件预制→移运→整修→吊装定位→预应力张拉→施工接缝处理",{"key":27,"text":546,"correct":22},"块件预制→预应力张拉→施工接缝处理→移运→整修→吊装定位",{"key":30,"text":548,"correct":22},"块件预制→移运→整修→预应力张拉→吊装定位→施工接缝处理",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":27,"analysis":33},1134558,"刚构桥的施工一般采用（ ）施工。",[553,555,557,559],{"key":20,"text":554,"correct":22},"整体现浇",{"key":24,"text":556,"correct":22},"转体",{"key":27,"text":558,"correct":32},"平衡悬臂施工",{"key":30,"text":560,"correct":22},"采用分次浇筑法",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":30,"analysis":33},1134559,"防治桥头跳车的措施不包括（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"选择砂石材料作为台后填料",{"key":24,"text":568,"correct":22},"提高地基承载能力",{"key":27,"text":570,"correct":22},"设置桥头打搭板",{"key":30,"text":572,"correct":32},"采用重型振动压路机碾压",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1134560,"为控制悬臂浇筑钢筋混凝土箱梁桥的施工挠度，建立相对坐标系的位置应为（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"0号桥台顶面",{"key":24,"text":580,"correct":32},"0号块箱梁顶面",{"key":27,"text":582,"correct":22},"1号块箱梁顶面",{"key":30,"text":584,"correct":22},"合龙段箱梁顶面",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},1134561,"悬臂浇筑钢筋混凝土箱梁的施工挠度控制时，对挠度的观测应在一天中的（ ）进行。",[589,591,593,595],{"key":20,"text":590,"correct":22},"温度最低时",{"key":24,"text":592,"correct":22},"温度最高时",{"key":27,"text":594,"correct":22},"平均气温时",{"key":30,"text":596,"correct":32},"温度变化最小时",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},1134562,"关于钢筋混凝土结构构造裂缝防治措施的说法，错误的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"应适当降低混凝土水胶比和坍落度",{"key":24,"text":604,"correct":32},"应选用早强水泥，避免使用缓凝剂",{"key":27,"text":606,"correct":22},"应降低混凝土水化热、推迟水化热峰值出现时间",{"key":30,"text":608,"correct":22},"对支架应采用预压措施",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]