[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-796-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},796,"一建公路工程实务","建筑工程",0,12,50,1523,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,225,237,249,261,273,285,297,309,321,332,340,349,358,370,382,394,405,417,427,439,448,460,469,481,493,504,516,527,538,548,557,569,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1134123,1,"单选题","关于软土地基处理施工中真空预压的说法，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","采用真空一堆载联合预压时，应先抽真空再按真空预压",false,{"key":24,"text":25,"correct":22},"B","密封膜应采用抗老化性能好、韧性好、抗穿刺能力强的不透气材料，但不得采用聚氯乙烯薄膜",{"key":27,"text":28,"correct":29},"C","真空预压的抽真空设备宜采用射流真空泵",true,{"key":31,"text":32,"correct":22},"D","真空预压法适用于处理深厚软土地基上荷载较大、变形要求较严格的高路堤段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1134124,"关于湿陷性黄土填筑路堤施工的说法中，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"浸水路堤可用黄土填筑",{"key":24,"text":41,"correct":22},"路床填料可以适量使用老黄土",{"key":27,"text":43,"correct":29},"黄土路堤边坡应拍实，并应及时予以防护，防止路表水冲刷",{"key":31,"text":45,"correct":22},"路堤填料不得含有粒径大于80㎜的块料",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1134126,"滑坡防治的工程措施主要有（ ）、力学平衡以及改变滑带土三类。",[50,52,54,56],{"key":20,"text":51,"correct":22},"护面",{"key":24,"text":53,"correct":29},"排水",{"key":27,"text":55,"correct":22},"植树",{"key":31,"text":57,"correct":22},"注浆",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1134127,"经过地质调查、勘探和综合分析，确定滑坡性质为推动式，或为由错落转化成的滑坡后，可采用（ ）的方法。",[62,64,66,68],{"key":20,"text":63,"correct":22},"反压土方",{"key":24,"text":65,"correct":29},"刷方（台阶）减重",{"key":27,"text":67,"correct":22},"设树枝状排水沟",{"key":31,"text":69,"correct":22},"修建抗滑挡土墙",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1134128,"可在冬期进行路基施工的工程项目是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"一级公路的土路基开挖",{"key":24,"text":77,"correct":22},"挖掘填方地段的台阶",{"key":27,"text":79,"correct":29},"岩石地段的路堑开挖",{"key":31,"text":81,"correct":22},"整修路基边坡",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1134129,"路基改建加宽施工时，在路槽纵向开挖的台阶上铺设跨施工缝的土工格栅，其主要作用是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"减少新老路基结合处的不均匀沉降",{"key":24,"text":89,"correct":22},"减少路面厚度",{"key":27,"text":91,"correct":22},"提高原地基承载力",{"key":31,"text":93,"correct":29},"减少裂缝反射",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1134130,"某地区冰冻深度达到1.3m，在冬期施工开挖路堑表层动土的方法宜采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"机械破坏法",{"key":24,"text":101,"correct":29},"爆破冻土法",{"key":27,"text":103,"correct":22},"蒸气放热解冻法",{"key":31,"text":105,"correct":22},"电热法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1134131,"某石方路堑施工，需要用爆破的方法形成1.：0.75的平整边坡，宜采用的爆破方法是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"光面爆破",{"key":24,"text":113,"correct":22},"预裂爆破",{"key":27,"text":115,"correct":22},"定向爆破",{"key":31,"text":117,"correct":22},"微差爆破",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1134132,"抛石挤淤施工时,在抛石高出水面后,应采用重型机具碾压紧密,然后在其上设（ ）,再行填土压实。",[122,124,126,128],{"key":20,"text":123,"correct":22},"透水层",{"key":24,"text":125,"correct":22},"垫层",{"key":27,"text":127,"correct":29},"反滤层",{"key":31,"text":129,"correct":22},"封层",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1134133,"炮眼直径和深度分别小于70mm和5m的爆破方法是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"药壶炮",{"key":24,"text":137,"correct":29},"钢钎炮",{"key":27,"text":139,"correct":22},"猫洞炮",{"key":31,"text":141,"correct":22},"洞室炮",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1134134,"软土地基处理施工时，采用塑料排水板施工的，机具就位的前一道工序是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"摊铺下层砂垫层",{"key":24,"text":149,"correct":22},"塑料排水板穿靴",{"key":27,"text":151,"correct":22},"机具移位",{"key":31,"text":153,"correct":22},"插入套管",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1134135,"湿陷性黄土组成中含量最大的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":29},"粉土",{"key":24,"text":161,"correct":22},"碳酸盐",{"key":27,"text":163,"correct":22},"砂土",{"key":31,"text":165,"correct":22},"高液限黏土",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1134136,"不属于膨胀土工程特性的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"黏性土含量高",{"key":24,"text":173,"correct":22},"自由膨胀率大",{"key":27,"text":175,"correct":29},"强度稳定",{"key":31,"text":177,"correct":22},"失水收缩",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1134138,"下列表述中，符合土质路堤施工规定的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":29},"性质不同的填料，应水平分层、分段填筑、分层压实",{"key":24,"text":185,"correct":22},"同一水平层路基的全宽应进行混合填筑",{"key":27,"text":187,"correct":22},"对潮湿或冻融敏感性小的填料应填筑在路基下层",{"key":31,"text":189,"correct":22},"在透水性不好的压实层上填筑透水性较好的填料前，应在其表面设2%～4%的单向横坡",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1134139,"不宜在冬期施工的项目是（ ）。",[194,196,198,199],{"key":20,"text":195,"correct":29},"路堤边坡的整修",{"key":24,"text":197,"correct":22},"河滩地段路基的防护工程施工",{"key":27,"text":79,"correct":22},{"key":31,"text":200,"correct":22},"泥沼地带的换填",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1134140,"采用挖掘机开挖土质路堑作业，叙述正确的是( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"路堑土方开挖中最常采用的是反铲挖掘机",{"key":24,"text":208,"correct":22},"反铲挖掘机挖装作业灵活，回转速度快，工作效率高",{"key":27,"text":210,"correct":29},"正铲工作面的高度一般不应小于1.5m，否则将降低生产效率",{"key":31,"text":212,"correct":22},"正铲挖掘机不适用于与运输车辆配合开挖土方路堑",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1134141,"当前广泛采用的路堑开挖方法是（ ），它包括薄层开挖、分层开挖、全断面一次开挖等方式。",[217,219,221,223],{"key":20,"text":218,"correct":29},"钻爆开挖",{"key":24,"text":220,"correct":22},"直接应用机械开挖",{"key":27,"text":222,"correct":22},"静态破碎法",{"key":31,"text":224,"correct":22},"钢钎炮法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1134142,"粉煤灰路堤的施工步骤与填土路堤施工方法相类似，仅增加了包边土和（ ）等工序。",[229,231,233,235],{"key":20,"text":230,"correct":22},"基底防水处理",{"key":24,"text":232,"correct":22},"设置拉筋带",{"key":27,"text":234,"correct":22},"设置护坡",{"key":31,"text":236,"correct":29},"设置边坡盲沟",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":27,"analysis":33},1134143,"光面爆破的主要目的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"为了节省炸药",{"key":24,"text":244,"correct":22},"为了加强岩石的破碎效果",{"key":27,"text":246,"correct":29},"形成光滑平整的边坡",{"key":31,"text":248,"correct":22},"形成隔震减震带",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1134144,"路基施工采用毫秒微差爆破技术,当最深梯段为HT时,单孔装药量Q的计算式为Q=E·Q·HT·WD,其中WD是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"药量指数",{"key":24,"text":256,"correct":22},"梯段爆破单位耗药量",{"key":27,"text":258,"correct":22},"炸药换算系数",{"key":31,"text":260,"correct":29},"最小抵抗线",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1134145,"某换填工程，工期紧，换填面积广，淤泥层较厚且稠度大。该工程最适合采用的换填方法是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"抛石挤淤法",{"key":24,"text":268,"correct":29},"爆破挤淤法",{"key":27,"text":270,"correct":22},"开挖换填法",{"key":31,"text":272,"correct":22},"水冲成孔法",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1134146,"某坚石路堑紧邻一座高压线铁塔，其最佳开挖方法是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":29},"静态破碎开挖",{"key":24,"text":280,"correct":22},"带松土器的重型推土机破碎开挖",{"key":27,"text":282,"correct":22},"分层钻爆开挖",{"key":31,"text":284,"correct":22},"薄层钻爆开挖",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1134147,"适用于挖掘浅且短的路堑的施工方法是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":29},"单层横向全宽挖掘法",{"key":24,"text":292,"correct":22},"多层横向全宽挖掘法",{"key":27,"text":294,"correct":22},"分层纵挖法",{"key":31,"text":296,"correct":22},"通道纵挖法",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},1134148,"土质路堑混合挖掘法是指（ ）混合使用。",[301,303,305,307],{"key":20,"text":302,"correct":22},"多层横向全宽挖掘法和分层纵挖法",{"key":24,"text":304,"correct":22},"单层横向全宽挖掘法和分层纵挖法",{"key":27,"text":306,"correct":29},"多层横向全宽挖掘法和通道纵挖法",{"key":31,"text":308,"correct":22},"单层横向全宽挖掘法和分段纵挖法",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1134150,"推土机开挖土质路堑作业中，影响推土机作业效率的两个主要因素是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"切土和卸土",{"key":24,"text":316,"correct":29},"切土和运土",{"key":27,"text":318,"correct":22},"运土和折返",{"key":31,"text":320,"correct":22},"卸土与折返",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1134151,"拓宽部分的路堤采用非透水性填料时,应在地基表面按设计铺设（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"隔离层",{"key":24,"text":328,"correct":22},"防冻层",{"key":27,"text":330,"correct":22},"基层",{"key":31,"text":125,"correct":29},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1134152,"挖掘浅且短的路堑宜采用的作业方法是（ ）。",[336,337,338,339],{"key":20,"text":290,"correct":29},{"key":24,"text":292,"correct":22},{"key":27,"text":294,"correct":22},{"key":31,"text":296,"correct":22},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},1134153,"先沿路堑纵向挖掘一条通道，然后将通道向两侧拓宽以扩大工作面，并利用该通道作为运土路线及场内排水的出路；该层通道拓宽至路堑边坡后，再挖下层通道，如此向纵深开挖至路基标高。上述作业方法是（ ）。",[344,345,346,348],{"key":20,"text":294,"correct":22},{"key":24,"text":296,"correct":29},{"key":27,"text":347,"correct":22},"分段纵挖法",{"key":31,"text":292,"correct":22},{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},1134154,"一段较长的土质路堑纵向开挖，采用沿路堑全宽，以深度不大的纵向分层进行挖掘作业，这种作业方法称作（ ）。",[353,354,355,356],{"key":20,"text":294,"correct":29},{"key":24,"text":296,"correct":22},{"key":27,"text":347,"correct":22},{"key":31,"text":357,"correct":22},"混合式纵挖法",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1134155,"关于粉煤灰路堤的施工，正确的说法是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"粉煤灰路堤不可用于高速公路路堤",{"key":24,"text":365,"correct":22},"凡是电厂排放的硅铝型低铝粉煤灰都可作为路堤填料",{"key":27,"text":367,"correct":22},"粉煤灰路堤比普通路堤自重更大，可以减少软土路堤沉降",{"key":31,"text":369,"correct":29},"粉煤灰路堤一般由路堤主体部分、护坡和封顶层以及排水系统等组成",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1134156,"挡土墙墙背所受的土压力最小的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"俯斜墙背",{"key":24,"text":377,"correct":29},"仰斜墙背",{"key":27,"text":379,"correct":22},"垂直墙背",{"key":31,"text":381,"correct":22},"凸折式墙背",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1134157,"下列结构设施中可用于路基挖方边坡支撑的有（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"护肩",{"key":24,"text":389,"correct":29},"护面墙",{"key":27,"text":391,"correct":22},"支垛护脚",{"key":31,"text":393,"correct":22},"护坝",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1134158,"路基边坡支挡包括（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"种草",{"key":24,"text":401,"correct":29},"挡土墙",{"key":27,"text":403,"correct":22},"石笼",{"key":31,"text":391,"correct":22},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1134159,"墙背所受土压力较小的重力式挡土墙墙背形式是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"俯斜式",{"key":24,"text":412,"correct":29},"仰斜式",{"key":27,"text":414,"correct":22},"垂直式",{"key":31,"text":416,"correct":22},"凸折式",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},1134160,"下列沿河河堤冲刷防护工程中属于间接防护的是（ ）。",[421,422,424,425],{"key":20,"text":403,"correct":22},{"key":24,"text":423,"correct":29},"顺坝",{"key":27,"text":401,"correct":22},{"key":31,"text":426,"correct":22},"砌石",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1134162,"属于柔性结构物的挡土墙是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"衡重式挡土墙",{"key":24,"text":434,"correct":29},"加筋土挡土墙",{"key":27,"text":436,"correct":22},"重力式挡土墙",{"key":31,"text":438,"correct":22},"凸折式挡土墙",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1134163,"不宜设置在挖方路段的挡土墙是（ ）。",[443,445,446,447],{"key":20,"text":444,"correct":22},"锚杆挡土墙",{"key":24,"text":434,"correct":29},{"key":27,"text":436,"correct":22},{"key":31,"text":432,"correct":22},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1134164,"宜修建加筋土挡墙的路段是（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"挖方路段",{"key":24,"text":455,"correct":22},"地形陡峭的山坡路段",{"key":27,"text":457,"correct":22},"半填半挖路段",{"key":31,"text":459,"correct":29},"地形平坦宽阔的填方路段",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},1134165,"下列各类挡土墙，属于柔性结构物的是（ ）。",[464,465,466,468],{"key":20,"text":434,"correct":29},{"key":24,"text":432,"correct":22},{"key":27,"text":467,"correct":22},"壁板式锚杆挡土墙",{"key":31,"text":436,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},1134166,"柱板式锚杆挡土墙墙后的土压力传递顺序，正确的是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"墙后的土压力→锚杆→挡土板",{"key":24,"text":476,"correct":22},"墙后的土压力→挡土板→锚杆",{"key":27,"text":478,"correct":29},"墙后的土压力→挡土板→肋柱→锚杆",{"key":31,"text":480,"correct":22},"墙后的土压力→肋柱→挡土板→锚杆",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},1134167,"某工程为土质边坡，对于这种边坡的防护采用下面哪种防护措施最适合（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":29},"框格植草防护",{"key":24,"text":488,"correct":22},"抹面防护",{"key":27,"text":490,"correct":22},"喷浆防护",{"key":31,"text":492,"correct":22},"喷射混凝土防护",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":31,"analysis":33},1134168,"属于公路路基直接防护中的圬工防护是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"框格防护",{"key":24,"text":500,"correct":22},"挂（土工）网式坡面防护",{"key":27,"text":502,"correct":22},"水泥混凝土空心块护坡",{"key":31,"text":488,"correct":29},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},1134169,"用于路基地下水排水的设施是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"蒸发池",{"key":24,"text":511,"correct":22},"拦水带",{"key":27,"text":513,"correct":29},"渗沟",{"key":31,"text":515,"correct":22},"跌水",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1134170,"在路基工程中，用于排除地下水的设施是（ ）。",[520,521,523,525],{"key":20,"text":511,"correct":22},{"key":24,"text":522,"correct":22},"急流槽",{"key":27,"text":524,"correct":22},"截水沟",{"key":31,"text":526,"correct":29},"渗井",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},1134171,"排水沟或暗沟通过软硬岩层分界处时应设置（ ）。",[531,533,534,536],{"key":20,"text":532,"correct":22},"渗水孔",{"key":24,"text":127,"correct":22},{"key":27,"text":535,"correct":22},"检查井",{"key":31,"text":537,"correct":29},"伸缩缝或沉降缝",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1134172,"不属于地下排水设施的是（ ）。",[542,543,545,546],{"key":20,"text":513,"correct":22},{"key":24,"text":544,"correct":22},"排水沟",{"key":27,"text":526,"correct":22},{"key":31,"text":547,"correct":29},"涵洞",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1134174,"某路基换填施工，换填深度为2m，地下水位为地面以下1.8～2.0m，含水层以下为非透水层。为降低和拦截地下水，在换填边界处宜设置（ ）。",[552,553,554,555],{"key":20,"text":526,"correct":22},{"key":24,"text":522,"correct":22},{"key":27,"text":509,"correct":22},{"key":31,"text":556,"correct":29},"填石渗沟",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1134175,"渗沟的作用是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":29},"降低地下水位",{"key":24,"text":564,"correct":22},"排除边沟水",{"key":27,"text":566,"correct":22},"减少冰冻深度",{"key":31,"text":568,"correct":22},"连接排水沟与渗井",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1134176,"洞式渗沟洞顶应采用盖板覆盖，盖板之间应（ ）",[573,575,577,579],{"key":20,"text":574,"correct":22},"相互搭接",{"key":24,"text":576,"correct":29},"留有空隙",{"key":27,"text":578,"correct":22},"填充沥青麻絮",{"key":31,"text":580,"correct":22},"用钢筋混凝土连接起来",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},1134177,"高速、一级公路的平面控制测量等级为（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":29},"一级",{"key":24,"text":588,"correct":22},"二级",{"key":27,"text":590,"correct":22},"三级",{"key":31,"text":592,"correct":22},"四级",[594,597,600,603,606,609],{"id":15,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":15},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]