[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135272":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135272,796,2,"多选题","（2020年真题）抗滑桩桩孔施工中，应监测（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","地下水位",true,{"key":16,"text":17,"correct":18},"B","地表水流量",false,{"key":20,"text":21,"correct":18},"C","桩身变形",{"key":23,"text":24,"correct":18},"D","土石比例",{"key":26,"text":27,"correct":14},"E","滑坡体位移和变形","AE","P36-40 抗滑桩：施工过程中应对地下水位、滑坡体位移和变形进行监测。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]