[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135213":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135213,796,2,"多选题","采用缆索吊装的预制拱肋，必须对（ ）等状况下的拱肋强度进行验算。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","吊装",true,{"key":16,"text":17,"correct":14},"B","搁置",{"key":19,"text":20,"correct":14},"C","悬挂",{"key":22,"text":23,"correct":14},"D","安装",{"key":25,"text":26,"correct":27},"E","临时连接",false,"ABCD","2020版教材P205\u002F2019版教材P199 预制的拱肋（箱），一般均有起吊、安装等过程，因此必须对吊装、搁置、悬挂、安装等状况下的拱肋进行强度验算，以保证拱肋（箱）的安全施工。拱肋如采用卧式预制，还需验算平卧运输或平卧起吊时截面的侧向应力",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]