[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135187":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135187,796,2,"多选题","沉入桩的施工方法主要有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","锤击沉桩",true,{"key":16,"text":17,"correct":14},"B","振动沉桩",{"key":19,"text":20,"correct":14},"C","射水沉桩",{"key":22,"text":23,"correct":24},"D","自动沉桩",false,{"key":26,"text":27,"correct":14},"E","静力压桩","ABCE","2020版教材P155\u002F2019版教材P146 沉人桩的施工方法主要有：锤击沉桩、振动沉桩、射水沉桩以及静力压桩等。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]