[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135169":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135169,796,2,"多选题","计算拱架施工预拱度时，应考虑的因素有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","支架和拱架在荷载作用下的弹性压缩",true,{"key":16,"text":17,"correct":14},"B","支架和拱架在荷载作用下的非弹性压缩",{"key":19,"text":20,"correct":14},"C","支架和拱架拆除后上部构造本身及活载1\u002F2所产生的挠度",{"key":22,"text":23,"correct":24},"D","结构重力和全部汽车荷载引起的拱圈弹性挠度",false,{"key":26,"text":27,"correct":14},"E","由混凝土收缩及温度变化而引起的挠度","ABCE","2020版教材P132\u002F2019版教材P127 支架和拱架应预留施工拱度，在确定施工预拱度值时，应考虑下列因素1.支架和拱架拆除后上部构造本身及活载1\u002F2所产生的挠度；2．支架和拱架在荷载作用下的弹性压缩；3．支架和拱架在荷载作用下的非弹性压缩；4．支架和拱架基底在荷载作用下的非弹性沉陷；5．由混凝土收缩及温度变化而引起的挠度。6.承受推力的墩台，由于墩台水平位移所引起的拱圈挠度。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]