[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135089":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135089,796,2,"多选题","路基压实过程施工中导致局部出现“弹簧”现象，可能原因有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","在最佳含水量下压实",false,{"key":16,"text":17,"correct":18},"B","压路遍数不足",true,{"key":20,"text":21,"correct":18},"C","局部有漏压现象",{"key":23,"text":24,"correct":18},"D","填土颗粒过大",{"key":26,"text":27,"correct":18},"E","异类土壤混填","BCDE","2020版教材P48\u002F2019版教材P44 路基施工中压实度不能满足质量标准要求，甚至局部出现“弹簧”现象，主要原因是：（1）压实遍数不合理。（2）压路机质量偏小。（3）填土松铺厚度过大。（4）碾压不均匀，局部有漏压现象。（5）含水量大于最佳含水量，特别是超过最佳含水量两个百分点，造成弹簧现象。（6）没有对上一层表面浮土或松软层进行处治。（7）土场土质种类多，出现异类土壤混填；尤其是透水性差的土壤包裹透水性好的土壤，形成了水囊，造成弹簧现象。（8）填土颗粒过大（＞10cm），颗粒之间空隙过大，或采用小符合要求的填料（天然稠度小于1.1，液限大于40，塑性指数大于18）。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]