[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135080":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135080,796,2,"多选题","填石渗沟、管式渗沟和洞式渗沟均应设置（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","排水层（或管、洞）",true,{"key":16,"text":17,"correct":14},"B","反滤层",{"key":19,"text":20,"correct":21},"C","透水层",false,{"key":23,"text":24,"correct":21},"D","防冻层",{"key":26,"text":27,"correct":14},"E","封闭层","ABE","2020版教材P41\u002F2019版教材P36 该题主要考察渗沟的形式 渗沟有填石渗沟、管式渗沟和洞式渗沟三种形式，三种渗沟均应设置排水层（或管、洞）、反滤层和封闭层。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]