[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135060":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135060,796,2,"多选题","关于雨期开挖路堑的说法，正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","土质路堑开挖前，在路堑边坡坡顶2m以外开挖截水沟并接通出水口",true,{"key":16,"text":17,"correct":14},"B","挖方边坡不宜一次挖到设计标高，应沿坡面留30cm厚",{"key":19,"text":20,"correct":21},"C","土质路堑挖至设计标高以上20～30cm时应停止开挖",false,{"key":23,"text":24,"correct":21},"D","雨期开挖岩石路堑，炮眼应尽量竖向设置",{"key":26,"text":27,"correct":14},"E","以挖作填的挖方应随挖随运随填","ABE","2020版教材P15\u002F2019版教材P14 雨期开挖路堑施工技术：（1）土质路堑开挖前，在路堑边坡坡顶2m以外开挖截水沟并接通出水口。（2）开挖土质路堑宜分层开挖，每挖一层均应设置排水纵横坡。挖方边坡不宜一次挖到设计标高，应沿坡面留30cm厚，待雨期过后整修到设计坡度。以挖作填的挖方应随挖随运随填。（3）土质路堑挖至设计标高以上30～50cm时应停止开挖，并在两侧挖排水沟。待雨期过后再挖到路床设计标高后再压实。（4）土的强度低于规定值时应按设计要求进行处理。（5）雨期开挖岩石路堑，炮眼应尽量水平设置。边坡应按设计坡度自上而下层层刷坡，坡度应符合设计要求。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]