[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1135025":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1135025,796,2,"多选题","涌水段施工采用超前钻孔排水时应符合的要求有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","应使用轻型探水钻机或凿岩机钻孔",true,{"key":16,"text":17,"correct":14},"B","钻孔孔位（孔底）应在水流上方",{"key":19,"text":20,"correct":21},"C","超前钻孔的孔底应超前开挖面1m左右",false,{"key":23,"text":24,"correct":14},"D","超前钻孔的孔底应超前开挖面1～2个循环进尺",{"key":26,"text":27,"correct":21},"E","钻孔孔位（孔底）应在水流下方","ABD","2020版教材P255\u002F2019版教材P249 三、采用超前钻孔排水时应符合的要求1.应使用轻型探水钻机或凿岩机钻孔。2.钻孔孔位（孔底）应在水流上方。钻孔时孔口应有保护装置，以防人身及机械事故。3.采取排水措施，保证钻孔排出的水迅速排出洞外。4.超前钻孔的孔底应超前开挖面1-2个循环进尺。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]