[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134989":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1134989,796,2,"多选题","工程价款的主要结算方式有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","按月结算",true,{"key":16,"text":17,"correct":18},"B","按工程量结算",false,{"key":20,"text":21,"correct":14},"C","竣工后一次结算",{"key":23,"text":24,"correct":14},"D","目标结算方式",{"key":26,"text":27,"correct":14},"E","双方约定的其他结算方式","ACDE","2020版教材P398\u002F2019版教材P390 工程价款的主要结算方式：1.按月结算。2.竣工后一次结算。3.分段结算。4.目标结算方式。5.双方约定的其他结算方式。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]