[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1134973":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1134973,796,2,"多选题","梁（板）预制实测项目包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","支座中心偏位",false,{"key":16,"text":17,"correct":14},"B","倾斜度",{"key":19,"text":20,"correct":21},"C","混凝土强度",true,{"key":23,"text":24,"correct":21},"D","梁长度",{"key":26,"text":27,"correct":21},"E","预埋件位置","CDE","2020版教材P331\u002F2019版教材P325 梁（板）预制实测项目有：混凝土强度（△）、梁（板）长度、断面尺寸（△）、平整度、横系梁及预埋件位置、横坡、斜拉索锚面。",{"id":6,"name":31,"category":32,"favorite":33},"一建公路工程实务","建筑工程",0]